Venetian Blinds (BSO), Lintel Boxes & Wind Configurator (SIA 342 Standard)
Checker for wind-resistance classes, lintel box dimensions & solar factor g_tot.
Interactive tool
Wind classes and sensor settings: tables from one manufacturer (Griesser) taken as an example; SIA 342 not consulted. The VR 90 / Z 90 and AV 70 / 80 products in the specifications are other products: their data sheet prevails. Box: 240 to 260 mm and 130 to 150 mm for a 220 cm opening (specifications), interpolated to 230 mm at 1,25 m (Schenker extract): assumption. Tool assumption: Fc of an exterior blind of 0,12 / 0,15 / 0,18 (light, medium, dark), calibrated on the g_tot of 0,06 to 0,11 in the specifications; Fc of an interior blind of 0,70. g_tot limit of 0,12 to 0,15: specifications, not found in SIA 180.
A Opening and lintel box
Lintel box
- Box recess height
- Recess depth
Height of the folded stack and of the motor mechanism. Insulated box base to avoid the thermal bridge; recess tolerance: manufacturer's sheet (SIA 342 not consulted).
B Wind resistance and anemometer setting
Wind resistance class
- Class reached at this width
- Anemometer setting
- Example product
Classes 0 to 6 of SIA 342:2009; sensor settings in m/s and in km/h taken from a Swiss manufacturer's wind memo.
C Summer heat protection: solar factor g_tot
Total solar factor g_tot
- g_tot with exterior blind
- g_tot with interior blind only
g_tot = g of the glazing × Fc of the device. Specification requirement: g_tot ≤ 0.12 to 0.15 (SIA 180 / SIA 380/1, not verified).
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.30"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
SIA 342 standard (Sun protection): table of recess heights and depths for lintel boxes (VR 90 / Z 90)
The stack height recess blind box VR 90 Z 90 is the height the blind takes up once folded, motor mechanism included: the lintel recess must be at least equal. For an opening 220 cm high, the specification gives at least 240 to 260 mm in height and 130 to 150 mm in depth, excluding insulation of the box base. A Schenker planning document for the VR 90 blind (extract) gives 230 mm of lintel up to 1.25 m clear height. In between, the tool interpolates:
| Opening height | Box height | Recess depth |
|---|---|---|
| 100 cm | 230 mm | 130 to 150 mm |
| 125 cm | 230 mm | 130 to 150 mm |
| 150 cm | 233 to 238 mm | 130 to 150 mm |
| 170 cm | 235 to 244 mm | 130 to 150 mm |
| 200 cm | 238 to 254 mm | 130 to 150 mm |
| 220 cm | 240 to 260 mm | 130 to 150 mm |
| 250 cm | at least 240 mm (to be confirmed) | 130 to 150 mm |
| 300 cm | at least 240 mm (to be confirmed) | 130 to 150 mm |
The tolerance recess niche lintel blind SIA 342 is not quantified by the specification: the manufacturer's sheet gives the installation allowance to provide around the box, and the SIA 342 standard ("sun protection") sets the requirements for the work.
Clarification on the values. Only the 240 to 260 mm and 130 to 150 mm at 2.20 m come from the specification; the 230 mm below 1.25 m come from an extract of Schenker's planning document (document not opened), and the interpolation between the two is an assumption of the tool. Beyond 2.20 m, the stack grows: the tool shows "at least 240 mm". For a blind with fine slats, a roller shutter or a fabric blind, the specification gives no value: manufacturer's sheet. SIA 342 was not consulted.
How to avoid the thermal bridge behind the blind box in an insulated façade (ITE)
A blind box opens a cavity in the envelope at the lintel: if the insulation stops behind the box, heat passes through this thermal bridge. The specification provides a niche depth excluding insulation of the box base, that is, the box base is insulated and the façade insulation stays continuous. The usual good practices are to choose an insulated box, not to reduce the insulation thickness behind it, to place the box in the plane of the insulation rather than in the masonry, and to insulate the access hatch. The calculation of the linear thermal bridge is not quantified here. For façade insulation, see the external insulation (ITE) tool SIA 243, and for the window itself the windows tool SIA 331.
Wind resistance of slat blinds (EN 13659 classes): at what speed in km/h should the safety anemometer be set?
The SIA 342 standard slat blind BSO wind resistance classifies sun protection from 0 to 6 according to the wind it withstands (tests under the product standard EN 13659 for slat blinds and roller shutters, EN 13561 for façade blinds). The maximum wind speed anemometer blind km/h to set is that of the class reached: above it, the blind must be retracted. Wind sensor settings, as reproduced by a Swiss manufacturer (Griesser):
| Class | Slat blinds and shutters: m/s | km/h | Façade blinds and fabric awnings: m/s | km/h |
|---|---|---|---|---|
| Class 1 | 9 | 32,5 | 7,8 | 28 |
| Class 2 | 10,7 | 38,5 | 10,6 | 38 |
| Class 3 | 12,8 | 46 | 13,3 | 48 |
| Class 4 | 16,7 | 60 | 16,7 | 60 |
| Class 5 | 21 | 76 | 21,1 | 76 |
| Class 6 | 25,6 | 92 | 25,6 | 92 |
The class reached depends on the width of the blind and on the product. Manufacturer examples (Griesser), permitted classes according to width; the VR 90 / Z 90 and AV 70 / 80 products of the specification are other products, whose data sheet prevails:
| Example product | Width up to | Class |
|---|---|---|
| Griesser Lamisol III 90 (90 mm slat blind) | 150 cm | class 6 |
| 200 cm | class 6 | |
| 250 cm | class 6 | |
| 300 cm | class 5 | |
| 350 cm | class 5 | |
| 400 cm | class 5 | |
| 450 cm | class 3 | |
| 500 cm | outside the table | |
| Griesser Lamisol III 70 (70 mm slat blind) | 150 cm | class 6 |
| 200 cm | class 6 | |
| 250 cm | class 5 | |
| 300 cm | class 4 | |
| 350 cm | class 4 | |
| 400 cm | class 4 | |
| 450 cm | class 3 | |
| 500 cm | outside the table | |
| Griesser Rollpac III (aluminium roller shutter) | 100 cm | class 6 |
| 150 cm | class 6 | |
| 200 cm | class 4 | |
| 250 cm | class 3 | |
| 300 cm | class 2 | |
| 350 cm | outside the table | |
| 400 cm | outside the table | |
| 450 cm | outside the table | |
| 500 cm | outside the table | |
| Griesser Solozip (fabric blind with zip guides) | 150 cm | class 6 |
| 200 cm | class 6 | |
| 250 cm | class 6 | |
| 300 cm | class 6 | |
| 350 cm | class 5 | |
| 400 cm | class 5 | |
| 450 cm | class 5 | |
| 500 cm | class 4 | |
| 600 cm | class 4 |
For the blind in the example (180 cm wide), the example product reaches class 6, that is a setting of 92 km/h at most (25.6 m/s). The specification quotes 45 to 65 km/h for a slat blind on guide rails, values of classes 3 and 4 (46 and 60 km/h), and 80 to 90 km/h for a Zip-Screen, values of classes 5 and 6 (76 and 92 km/h). The class drops by one step if the work is 100–300 mm from the façade, by two steps at 300–500 mm. Class required according to zone, terrain (SIA 261) and mounting height:
| Zone and terrain | Up to 6 m | Up to 18 m | Up to 28 m | Up to 50 m |
|---|---|---|---|---|
| Swiss Plateau (up to 600 m) and valleys (up to 850 m) | ||||
| II · Lake shores | 5 | 5 | 5 | 6 |
| IIa · Large plain | 4 | 5 | 5 | 5 |
| III · Localities, open terrain | 4 | 4 | 5 | 5 |
| IV · Large urban areas | 3 | 4 | 4 | 5 |
| Pre-Alps (up to 1100 m) | ||||
| II · Lake shores | 5 | 6 | 6 | 6 |
| IIa · Large plain | 5 | 5 | 5 | 6 |
| III · Localities, open terrain | 4 | 5 | 5 | 5 |
| IV · Large urban areas | 4 | 4 | 5 | 5 |
| Foehn valleys (up to 850 m) | ||||
| II · Lake shores | 6 | 6 | 6 | over 6 |
| IIa · Large plain | 5 | 6 | 6 | 6 |
| III · Localities, open terrain | 5 | 5 | 5 | 6 |
| IV · Large urban areas | 4 | 5 | 5 | 6 |
Clarification on the values. These tables are those of a Swiss manufacturer, taken as an example: SIA 342 was not consulted. At the corners of a building, on a building without a square plan or above 1100 m, a separate justification is needed. A wind sensor does not protect against sudden gusts: retract the blinds when a storm approaches. A VR 90 manufacturer document (extract) limits blinds of more than 9 m² to 38.5 km/h (class 2).
Protection against summer overheating (SIA 180 standard): why only an exterior blind can reach g_tot ≤ 0.12
The solar factor g_tot summer thermal protection SIA 180 is the share of solar energy that enters the room through the glazing and its protection: g_tot = g × Fc, where g is the solar factor of the glazing and Fc the reduction factor of the device. An exterior blind stops the radiation before the glass; an interior blind lets it in and releases it into the room. With the tool's assumptions (Fc of 0.12 to 0.18 for an exterior slat blind, 0.70 for an interior blind):
| Glazing | Light exterior blind | Medium exterior blind | Dark exterior blind | Interior blind only |
|---|---|---|---|---|
| Standard triple glazing (g = 0,50) | 0,060 | 0,075 | 0,090 | 0,350 |
| Double glazing (g = 0,60) | 0,072 | 0,090 | 0,108 | 0,420 |
All the exterior blinds in the table are below the limit of 0.12; the interior blind alone (0.350 with triple glazing) exceeds it by a wide margin and also fails under 0.15.
Clarification on the values. The Fc values of 0.12, 0.15 and 0.18 are assumptions of the tool, calibrated on the g_tot range of 0.06 to 0.11 in the specification; a reference site quotes Fc = 0.25 for an exterior raffstore, that is g_tot = 0.125 with g = 0.50. Manufacturers declare their values (EN 14501, EN ISO 52022): these take precedence. The g_tot limit of 0.12 to 0.15 is that of the specification (SIA 180 and SIA 380/1): it was not found in SIA 180, and a FHNW slide deck (research extract, document not opened) mentions g_tot < 0.1 for an exterior class 6 blind. ⚡ Price your blinds in Soumission
Frequently Asked Questions on Slat Blinds, Wind Resistance and the Solar Factor (FAQ)
1. What lintel box height should be allowed for a VR 90 / Z 90 slat blind?
For an opening 220 cm high, the specification gives 240 to 260 mm in height (folded stack and motor mechanism) and at least 130 to 150 mm in depth, excluding insulation of the box base to avoid the thermal bridge. For a lower opening, a Schenker planning document for the VR 90 (extract) gives 230 mm up to 1.25 m clear height: the tool interpolates between the two points (235 to 244 mm for 170 cm, assumption) and shows "at least 240 mm" beyond 2.20 m, to be confirmed with the manufacturer.
For a blind with fine slats, a roller shutter or a fabric blind, the specification gives no value: ask the manufacturer for the height and depth of the niche. The recess tolerance is not quantified (SIA 342 not consulted).
2. At what speed in km/h should the safety anemometer of a slat blind be set?
SIA 342:2009 classifies wind resistance from 0 to 6; the corresponding sensor settings, as reproduced by a Swiss manufacturer for slat blinds and shutters, are: class 1: 32.5 km/h, class 2: 38.5 km/h, class 3: 46 km/h, class 4: 60 km/h, class 5: 76 km/h, class 6: 92 km/h. For a 180 cm blind, the manufacturer example used (Griesser Lamisol III 90 (90 mm slat blind)) reaches class 6, that is a setting of 92 km/h at most; a Zip-Screen from the same manufacturer reaches class 6 (92 km/h). The specification quotes 45 to 65 km/h for a blind on guide rails, which corresponds to classes 3 and 4. The class drops by one step if the distance from the façade is 100 to 300 mm and by two steps from 300 to 500 mm.
These classes come from manufacturer tables taken as examples: the VR 90 / Z 90 products of the specification are other products, whose limits are in their data sheet. A wind sensor does not protect against sudden gusts: retract the blinds when a storm approaches.
3. Why can only an exterior blind reach g_tot ≤ 0.12?
The total solar factor is g_tot = g × Fc, where g is that of the glazing and Fc the reduction factor of the protection device. With triple glazing of g = 0.50 and an exterior slat blind of medium colour (Fc = 0.15), g_tot = 0.075; with a light blind on double glazing of g = 0.60, 0.072; with a dark blind on the triple glazing, 0.090. An interior blind alone (Fc = 0.70) gives 0.350 and fails: it stops the radiation after the glass, whereas the exterior blind stops it before.
The Fc values are assumptions of the tool, calibrated on the g_tot range of 0.06 to 0.11 in the specification; a reference site quotes Fc = 0.25 for an exterior raffstore, that is g_tot = 0.125 with g = 0.50. The manufacturer's declared value prevails. The limit of 0.12 to 0.15 in the specification was not found in SIA 180.
Indicative information based on the tool's specification and manufacturer documents; it does not replace the SIA 342 and SIA 180 standards, the blind manufacturer's sheet or the engineering office's calculation.
