SIA 102 · SIA 103 Tool 5.2 Online

Architect Fees & Site Supervision Simulator by Phase (SIA 102 / 103)

Break down architect and engineer fees by phase (31 to 53) according to the SIA 102 and 103 standards.

Interactive tool

A Your assignment

1 Discipline

Nature of works (architect)

CHF
%
CHF / h

3 Phases entrusted

Fees per phase

Full mission (100 %), excl. TVA (HT)
Phases entrusted, excl. TVA (HT)
Estimated hours of the phases entrusted
Total incl. TVA 8,1 % (TTC)

Amount and hours for each SIA phase
SIA phaseShareAmount excl. TVA (HT, CHF)Hours

Breakdown in the specification (SIA 102): project design 32.5 % (phases 31 to 33), tendering 18 % (phase 41), implementation 49.5 % (phases 51 to 53). The same breakdown is applied to the civil engineer (SIA 103). Fees are freely negotiable: this simulator is a budgeting aid.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="5.2"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

The official breakdown of architect services by phase under the SIA 102 regulation

The calculation architect fees SIA 102 per phase starts from an overall fee, expressed as a percentage of the construction cost, which is divided between the phases of the commission. The breakdown phases 31 32 33 41 51 52 53 SIA in the tool's specification gives: phase 31 preliminary design 9 %, phase 32 building design 21 %, phase 33 permit procedure 2.5 %, phase 41 tendering 18 %, phase 51 detailed design 16 %, phase 52 construction 29 % and phase 53 commissioning 4.5 %. The total is 100 %. For a construction cost of 1'200'000 CHF and an overall rate of 13.5 %, the complete commission is worth 162'000.00 CHF excl. VAT (HT).

Amount and hours of each SIA phase for a complete architect commission
SIA phaseShareAmount excl. TVA (HT)Hours at 155 CHF / h
Phase 31: Preliminary design9,0 %14'580.00 CHF94,1 h
Phase 32: Construction design21,0 %34'020.00 CHF219,5 h
Phase 33: Permit application procedure (Permit)2,5 %4'050.00 CHF26,1 h
Phase 41: Tendering, comparison of bids, award recommendations18,0 %29'160.00 CHF188,1 h
Phase 51: Detailed design (Construction drawings)16,0 %25'920.00 CHF167,2 h
Phase 52: Construction (Site management (DT) & cost control)29,0 %46'980.00 CHF303,1 h
Phase 53: Commissioning, completion, final account and defects-liability site management4,5 %7'290.00 CHF47,0 h
Mission total100 %162'000.00 CHF1045,1 h

Phases 31, 32 and 33 (Project design: 32.5 %): from the sketch to obtaining the building permit

Project design accounts for 32.5 % of the commission: 52'650.00 CHF excl. VAT (HT) in the example. It includes the preliminary design (phase 31: brief, sketches, first cost estimate), the building design (phase 32: plans, specifications, more precise cost estimate) and the permit application procedure (phase 33: public notice file, response to objections). Phase 33 represents only 4'050.00 CHF excl. VAT (HT), but it conditions everything else: a refused or delayed permit shifts the site and the financing.

Phase 41 (Tendering and bids: 18 %) and Phases 51 to 53 (Construction and Site management: 49.5 %)

Phase 41 (tendering, comparison of bids, award recommendations) is worth 18 %. Implementation accounts for 49.5 %: detailed design (phase 51, 16 %), construction with site management and cost control (phase 52, 29 %), then commissioning, final account and defects-liability site management (phase 53, 4.5 %). It is in these phases that the quality of the bids received and the control of the final account are decided: for progress statements and daywork, see the daywork report, and for the overall budget of the project, the CFC 0 to 9 budget simulator.

For a civil engineer, the fee civil engineer SIA 103 Switzerland follows the same phase logic: the tool's starting rate is 7.5 % of the cost of the load-bearing share, and the breakdown by phase in the specification is identical. It was not verified in the SIA 103 regulation: confirm it in the contract.

How much does a Site Management (DT - Phase 52) commission alone cost in Switzerland?

The percentage site management phase 52 is 29 % of the overall commission. At 13.5 % of the construction cost, this represents 3.92 % of the construction cost: on 1'200'000 CHF of works, site management alone costs 46'980.00 CHF excl. VAT (HT), that is about 303.1 hours at 155 CHF per hour. For renovation, at the rate of 16 %, the same commission costs 55'680.00 CHF excl. VAT (HT).

Fees for site management alone according to the construction cost
Construction cost excl. TVA (HT)Full mission (13,5 %)Site management (29 %)Estimated hoursTTC (TVA 8,1 %)
500'000 CHF67'500.00 CHF19'575.00 CHF126,3 h21'160.58 CHF
1'200'000 CHF162'000.00 CHF46'980.00 CHF303,1 h50'785.38 CHF
3'000'000 CHF405'000.00 CHF117'450.00 CHF757,7 h126'963.45 CHF

The hourly rate architect Switzerland of 155 CHF per hour is the tool's starting value (average rate of an office): enter the real rate of your office. Site management entrusted on its own is generally more expensive than its theoretical share, because the site manager takes over plans that he did not draw: ask for a quote or a capped hourly rate.

Repeal of the SIA 102 fee formulas by the COMCO: how to negotiate your architect's contract

The SIA standards only bind the parties that have expressly submitted to them. In terms of competition, the secretariat of the Competition Commission (COMCO) considered in 2017 that the KBOB fee recommendations constituted an unlawful agreement, and the SIA 102:2020 revision aims at compliance with the requirements of the COMCO. According to the tool's specification, the fee formulas of SIA 102 are repealed: the calculation of fees is no longer imposed and is freely agreed between the client and the appointed professional.

  • Choose the method: percentage of the construction cost, fees based on time spent (capped hourly rate) or overall lump sum; the tool calculates the first and deduces hours from it.
  • Set the cost basis: relevant construction cost (CFC 2), cost variations, daywork or work at an overall price.
  • Choose the phases: entrust everything, or only the design and permits (52'650.00 CHF excl. VAT (HT) in the example), or only the site management.
  • Provide for project abandonment: fees due for services already provided, calculated on the last cost estimate.
  • Cap additional services: hourly rate, prior written agreement.

The percentages per phase are those of the specification; their correspondence with the current edition of the regulation was not verified. The amounts do not replace a quote: request several quotes and compare them phase by phase.

⚡ Track the costs of your sites in Soumission

Frequently Asked Questions on Architect and Engineer Fees by Phase (FAQ)

1. How are an architect's fees divided between phases 31 to 53?

The breakdown in the specification, based on the SIA 102 regulation, is: phase 31 preliminary design 9 %, phase 32 building design 21 %, phase 33 permit procedure 2.5 % (project design: 32.5 %), phase 41 tendering 18 %, then phase 51 detailed design 16 %, phase 52 construction and site management 29 % and phase 53 commissioning and completion 4.5 % (implementation: 49.5 %). On a construction cost of 1'200'000 CHF at 13.5 %, the overall commission is 162'000.00 CHF excl. VAT (HT), that is 175'122.00 CHF incl. VAT (TTC) at 8.1 %.

These percentages were not verified in the current edition of the regulation: confirm them in your contract. The same breakdown is applied to the civil engineer (SIA 103) as the specification requires.

2. How much does a site management commission alone cost (phase 52)?

Phase 52 accounts for 29 % of the overall commission. On 1'200'000 CHF of works at 13.5 %, site management alone costs 46'980.00 CHF excl. VAT (HT), that is 3.92 % of the construction cost, and represents about 303.1 hours at 155 CHF per hour.

Site management on its own is generally more expensive than its theoretical share, because the architect takes over plans that he did not draw and no longer benefits from the economies of scale of the complete commission: ask for a quote or a capped hourly rate.

3. Why are SIA 102 fees negotiated today, and how do you negotiate an architect's contract?

The SIA standards only bind the parties that have expressly submitted to them. The Competition Commission considered in 2017 that the KBOB fee recommendations constituted an unlawful agreement, and the SIA 102:2020 revision aims at compliance with the requirements of the COMCO: the calculation of fees is no longer imposed and is freely agreed, as a percentage of the construction cost, based on time spent or as a lump sum.

To negotiate: set out in writing the calculation method, the cost basis, the phases entrusted (for example 52'650.00 CHF excl. VAT (HT) for phases 31 to 33 alone), the hourly rate for additional services and the fate of the fees if the project is not carried out.

Indicative information based on the SIA 102 and SIA 103 regulations; it does not replace your contract or legal advice.