Public Land Occupation File (Skips / Scaffolding) & Temporary Signage Diagrams (Standard VSS 40 886)

The municipal application to occupy the public domain and the site signage diagrams.

Interactive tool: lead time and list of required signs and markings

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

PDFDOCX

Public Land Occupation & Signage VSS 40 886 File

The municipal application to occupy the public domain and the site signage diagrams.

  • Application template (skip, scaffolding, crane)
  • Indicative deadlines and rates by city
  • Barrier diagrams for pavement and carriageway

Printable PDF document · Editable Word template (.docx)

1. Procedures, notice periods (10 to 30 days) and rates per m²/day in Swiss cities

Occupying a pavement or a parking space for a skip or scaffolding requires a municipal permit, fees and a lead time. Only the Geneva range was re-read; the other profiles are assumptions.

1.1 Why forgetting to include road fees and the hire of parking spaces in your quote directly cuts into your net margin

Occupation fees (of the order of 3 to 5 CHF/m² per week in Geneva, with a monthly cap) and the suspension of parking spaces are priced separately. If you do not build them into the offer, the municipality invoices directly the company that filed the application.

1.2 How to re-invoice by change order (avenant) the extension of pavement fees when the site is delayed because of another lot

Request the extension of the permit before it expires and re-invoice it by change order (avenant), with the delay letter of the preceding lot as supporting document. An extension that has not been requested exposes you to a fine and a stoppage.

2. Rules for barriers and site signage on the public road under the Swiss standard VSS 40 886

A skip or scaffolding on the pavement is an obstacle: barriers and lighting answer for it.

2.1 Minimum width of the pedestrian walkway, protection of passers-by and mandatory night lighting of skips and scaffolding

Maintain a protected and signposted pedestrian walkway, with sufficient passage width, protection against falling objects, and working night lighting on skips and scaffolding (warning lights, reflective strips). Check the required width in the standard.

3. Frequently asked questions about road permits and the VSS 40 886 standard (FAQ)

3.1 Who is civilly and criminally liable if a cyclist or pedestrian hits a badly lit skip at night?

Whoever operates and signs the obstacle (the company that obtained the permit) is in principle liable for inadequate barriers, civilly (Art. 41 CO) and sometimes criminally. Photograph the barriers by day and by night to prove your diligence.

3.2 How many days in advance must the no-parking signs be put up by the municipal police (72 to 96 hours)?

The lead time for putting up the signs is set by the municipality; 72 to 96 hours are common practice, to be confirmed with the municipal police. The deadline for filing the application is 10 to 15 working days in our template.

3.3 Are municipal fees for occupying public land subject to VAT (TVA) when re-invoiced to the client?

Re-invoicing fees advanced on behalf of the client may follow a particular VAT (TVA) treatment (disbursements); it depends on how you present it. Ask your fiduciary or the AFC before invoicing it.

Keywords covered: application permit placing skip scaffolding pavement lausanne geneva · rate occupation public land site m2 day Switzerland · Swiss standard temporary signage site VSS 40 886 · suspension parking spaces site municipality · who pays road fee extension site delay · liability night barriers scaffolding pavement.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.