Works Carried Out Without a Building Permit: The Craftsman's Duty to Advise (Art. 365 CO) & Legal Release Template
Complete 6-page guide (PDF) and Word template. Proving in writing that you warned the client that a permit is required: authorisation regime, duty to notify (devoir d'avis), protective clause for quotes, client's declaration and letters.
Interactive tool: risk of sharing demolition costs, and shield clause
Loading the tool…
📄 The « Brut de chantier » pack to download (free)
PDFDOCX⚖️ 'Pure Law' File
Legal Release « Works Without a Building Permit » & Duty to Advise
Complete 6-page guide (PDF) and Word template. Proving in writing that you warned the client that a permit is required: authorisation regime, duty to notify (devoir d'avis), protective clause for quotes, client's declaration and letters.
Art. 22 and 25 LAT, Art. 20 and 365 CO: what the document proves and what it does not
Shield clause for quotes and the client's release declaration
Three letters, evidence checklist, frequent mistakes, practical case and cases where a lawyer should be consulted
Printable PDF document · Editable Word template (.docx)
1. Why the sentence « The client told me the municipality agreed » will not save you in court
A novice client does not know the building rules: the craftsman, by contrast, is a professional. The law expects him to warn in writing before starting.
1.1 The case law of the Federal Court: towards a novice owner, the professional contractor has a written duty to inform (Art. 365 CO)
Art. 365 para. 3 CO obliges the contractor to inform the client immediately of any circumstance that jeopardises the proper execution of the work. Case law deduces from this that a professional craftsman who carries out works requiring a permit without warning an uninformed client may be held liable for part of the restoration costs.
1.2 Financial consequences of a municipal demolition and restoration order (Art. 25 LAT / LATC / LCI / LC)
No building or installation may be created or altered without authorisation from the competent authority (Art. 22 LAT). Without a permit, the authority may order a stop, restoration or demolition at the owner's expense, with a fine under cantonal law (LATC, LCI, LC): the client will try to turn against the craftsman.
Consequences by party involved
Party involved
What the law says for them
Contractor
Must warn in writing (CO 365 para. 3); risks part of the restoration costs if he carries out the work without warning an uninformed client.
Subcontractor
Same duty for his lot; does not start without a copy of the permit or a release.
Client / co-owner
Must obtain the permits (LAT 22) and the agreement of the community in condominium ownership (PPE) (CC 712a and 712b); bears the demolition order.
2. The trap of works ordered by a condominium (PPE) co-owner on common parts (Art. 712a et seq. CC)
In condominium ownership, the facade or the window does not belong to the co-owner who calls you: he has no power to decide alone.
2.1 Why windows, external blinds, the facade, terrace waterproofing and the load-bearing slab do not belong to your client
The elements that determine the external appearance or the strength of the building are common parts (Art. 712b CC): changing them requires the agreement of the community of co-owners and of the administrator. Check the PPE regulations before any quote.
2.2 The mandatory administrative release clause to be signed before any site without an architect
The administrative-permit release recalls that obtaining the permits is the client's responsibility, certifies that he has been informed and has him declare that he has made enquiries with the municipality. It does not exonerate you completely, but it proves that you informed him.
3. Frequently asked questions about works without a permit in Switzerland (FAQ)
3.1 Is the client entitled to refuse to pay my invoice if the municipality stops the site for lack of a permit (Art. 20 CO)?
He can try, by invoking the impossibility or illegality of the object of the contract (Art. 20 CO). The outcome depends on the facts: written warning, signed release, nature of the works. A release signed before the works begin clearly strengthens your claim.
3.2 Does the craftsman personally risk an administrative fine from the cantonal building police?
Under cantonal building laws, the fine may target the owner, the contractor and the persons who carried out the works. The risk varies from one canton to another: enquire with the municipality.
3.3 When am I completely relieved of my duty to advise on permits (presence of an architect or of site management)?
Never completely: the presence of an architect or of site management reduces your duty to advise, but does not erase it if you can see that the permit is missing. Ask for a copy of the permit before starting.
Keywords covered: works carried out without a building permit Switzerland who is liable · demolition order municipality restoration costs craftsman · contractor duty to advise art 365 CO permit · template release building permit client word pdf · works in PPE common parts without general meeting (AG) vote art 712a CC · fine building police LATC LCI LC.
General information based on Swiss law in force — does not replace personalised legal advice.
The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.