SIA 370.001 / SIA 500 Tool 6.31 Online

Lift Configurator (Car Dimensions 110x140 cm, Shaft & SIA 500 Standard)

Checker for the minimum dimensions of the car (110x140 cm) and of the shaft/pit.

Interactive tool

Car, door and landing: SIA 500, per the summary of the canton of Zurich; other values from the specifications, not verified. Car of 1,10 × 1,40 m, door of 80 cm and area of 1,40 × 1,40 m in front of the doors: confirmed. Shaft, pit, headroom, plumb tolerance of SIA 414 (± 25 mm), shaft wall and level L_H,tot of SIA 181: specifications; texts of SN EN 81-70, SN EN 81-20, SIA 181 and AEAI directive 23-15 not consulted. Button height (85 to 110 cm) not found in SIA 500. Type 1: car of 100 × 125 cm (2003 edition of EN 81-70); no shaft given by the specifications.

A Type of lift: load, car and concrete shaft

Car and shaft

Load, car and door
Net internal concrete shaft
Opening with plumb tolerance

Indicative shaft from the specifications: type 2 of 160 to 165 × 175 to 185 cm, type 3 of 175 × 240 to 250 cm. The manufacturer's sheet prevails.

B Levels, pit and shaft headroom

stops
m

Shaft heights

Pit depth
Clear height under slab at shaft head
Total shaft height
Average storey height

Total height = pit + travel + height under slab. Pit of 110 to 130 cm (35 to 60 cm in renovation, by derogation); head of 340 to 360 cm.

C Landing and acoustics of the shaft (SIA 500, SIA 181)

cm

Landing and acoustic protection

Manoeuvring space on the landing

Shaft wall of 20 to 25 cm of reinforced concrete and L_H,tot of 25 to 30 dB(A): specifications. Smoke extraction at the shaft head: AEAI (VKF) guideline 23-15, text not consulted.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.31"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 500 and SN EN 81-70: why the 110 x 140 cm car (630 kg / 8 persons) is the minimum standard in Switzerland

The minimum dimensions of an accessible lift according to standard SIA 500 are those of the standard «Barrier-free construction» (2009 edition). According to the summary of the Canton of Zurich that reproduces it, the car of a lift measures at least 110 cm wide by 140 cm deep, the door at least 80 cm clear width, and a free area of 140 × 140 cm must precede the car doors. The lift car 110x140 cm 630 kg 8 persons corresponds to type 2 of the European standard: one wheelchair and its accompanying person. The three types in the specifications:

Lift types according to SN EN 81-70: load, car, door and shaft
TypeLoadInterior carClear door openingIndicative concrete shaft
Type 2: residential630 kg (8 persons)110 × 140 cm≥ 80 cm160 to 165 × 175 to 185 cm
Type 3: public, medical1000 kg (13 persons)110 × 210 cm≥ 90 cm175 × 240 to 250 cm
Type 1: constrained renovation450 kg (6 persons)100 × 125 cm≥ 80 cmto be requested from the manufacturer

The standard SN EN 81-20 EN 81-70 for Swiss lifts designates two complementary texts: SN EN 81-20 sets the safety rules for the construction and installation of lifts, SN EN 81-70 (SIA 370.070) the accessibility for people with disabilities. For a wheelchair and its accompanying person, manufacturers state a door of 90 cm, which the specifications recommend in addition to the minimum of 80 cm.

Note on the texts. Standards SN EN 81-20, SN EN 81-70 and SIA 500 (paid) were not consulted: the car, door and landing come from the Zurich summary, the types from manufacturers' sheets. For type 1, the specifications cite a car of 100 × 125 cm (2003 edition) whereas, according to a manufacturer, the 2018 edition provides 100 × 130 cm with a door of 80 cm. The specifications give no shaft dimension for type 1. For the general configurator of SIA 500, see the barrier-free dimensions tool.

Opening dimensions of the reinforced concrete shaft, pit depth (1,10 m) and shaft head height (3,50 m)

The concrete shaft, pit and shaft head dimensions of a lift in the specifications, for a type 2: net internal shaft of 160 to 165 cm wide by 175 to 185 cm deep, i.e. 165 to 170 × 180 to 190 cm with the plumb tolerance of ± 25 mm of SIA 414; pit of 110 to 130 cm (35 to 60 cm in a reduced renovation pit); height under slab at the shaft head of 340 to 360 cm from the last level served. The total height of the shaft is the sum of the pit, the travel and the head:

Total shaft height of a type 2 lift according to the number of stops
StopsTravelAverage storey heightTotal shaft height
36,0 m3,00 m1'050 to 1'090 cm
49,0 m3,00 m1'350 to 1'390 cm
512,0 m3,00 m1'650 to 1'690 cm
718,0 m3,00 m2'250 to 2'290 cm

Note on the values. Shaft, pit, shaft head and tolerance are those of the specifications, of an order of magnitude consistent with a tender consulted (630 kg: shaft of 1,60 × 1,78 m, pit of 1,10 m, head of 3,25 m) but not verified: the sheet of the chosen manufacturer prevails, as does SN EN 81-20.

Requirements for the floor landing (140 x 140 cm), height of the call buttons (85 to 110 cm) and GSM emergency intercom

The landing in front of the lift 140x140 cm SIA 500 is a free area of at least 140 × 140 cm in front of the car doors, outside the swing of any landing door; the Zurich summary also asks for at least 60 cm between the car doors and the start of a staircase located at the side, and 140 cm if it is opposite. Germany requires 150 × 150 cm: that is another text.

The specifications place the call and control buttons between 85 and 110 cm in height and provide for an emergency intercom with GSM transmission, so that a trapped person can call for help. The information must be perceptible in two ways (sight and hearing). A Zurich decision mentions standard SN EN 81-80 for upgrading the alarms of existing lifts.

Note on the values. The height of 85 to 110 cm was not found in SIA 500: Germany adopts 85 cm for the call buttons, and manufacturers' sheets cite other ranges. The title of standard SN EN 81-80 was not verified. For the accessibility of the whole building, see the SIA 500 tool.

Acoustic protection of the lift shaft (Standard SIA 181) and ventilation/smoke extraction at the shaft head (AEAI)

The specifications require acoustic decoupling of the shaft or a shaft wall of reinforced concrete 20 to 25 cm thick, and forbid backing a bedroom directly onto a simple lift shaft without lining or a stricter requirement of SIA 181: the noise level of the installations in the sensitive room, L_H,tot, must stay at 25 to 30 dB(A). In the example (adjoining bedroom, 25 cm wall), the wall is within the range but a lining or decoupling remains necessary. For the acoustics of the building, see the SIA 181 tool.

The head of a lift shaft must also allow smoke to be extracted: AEAI (VKF) fire protection guideline 23-15 «Transport installations» covers lifts, in particular firefighters' lifts. Luxembourg documents cite an opening of 1 % of the shaft section at the head, but nothing proves that the AEAI adopts this value. For the fire protection concept, see the AEAI tool.

Note on the texts. The text of SIA 181:2020 was not consulted (a presentation of the 2006 edition cites L_H ≤ 28 dB(A) for installations); the level of 25 to 30 dB(A) and the wall of 20 to 25 cm are those of the specifications. The text of AEAI (VKF) guideline 23-15 could not be read: the tool does not calculate smoke extraction. ⚡ Price your lifts in Soumission

Frequently Asked Questions about Lifts, Shaft, Landing and Acoustics (FAQ)

1. Why is the 110 × 140 cm car (630 kg, 8 persons) the minimum standard in Switzerland?

According to the summary of the Canton of Zurich that reproduces standard SIA 500 («Barrier-free construction»), the car of a lift measures at least 110 cm wide by 140 cm deep, the door 80 cm clear width and the area in front of the doors 140 × 140 cm. This car corresponds to type 2 of standard SN EN 81-70 (SIA 370.070): 630 kg, 8 persons, one wheelchair with its accompanying person; manufacturers state a door of 90 cm for this type, which the specifications recommend.

The texts of SN EN 81-70 and SN EN 81-20 were not consulted. For type 1, the specifications cite a car of 100 × 125 cm (2003 edition) whereas, according to a manufacturer, the 2018 edition provides 100 × 130 cm with a door of 80 cm.

2. What shaft, pit and shaft head dimensions for 4 stops and 9,0 m of travel?

For a type 2 lift, the specifications give a net internal shaft of 160 to 165 cm wide by 175 to 185 cm deep, i.e. 165 to 170 × 180 to 190 cm with the plumb tolerance of ± 25 mm of SIA 414; a pit of 110 to 130 cm (35 to 60 cm in a reduced renovation pit); a head of 340 to 360 cm under slab. Total shaft height: 1'350 to 1'390 cm, with 3,00 m average height between two stops. Type 3 (1'000 kg) requires 175 cm by 240 to 250 cm.

These dimensions are those of the specifications, of an order of magnitude consistent with a tender consulted (630 kg: shaft of 1,60 × 1,78 m, pit of 1,10 m, head of 3,25 m), but not verified: the sheet of the chosen manufacturer prevails. The specifications give no shaft dimension for type 1.

3. What landing, control and acoustic requirements for a lift shaft?

In front of each door, SIA 500 requires a free area of at least 140 × 140 cm, outside the swing of any landing door (Germany requires 150 × 150 cm). The specifications place the call buttons between 85 and 110 cm and provide for a GSM emergency intercom; this height was not found in SIA 500 (85 cm in Germany). For acoustics, they require a reinforced concrete shaft wall of 20 to 25 cm and a lining or decoupling if a bedroom is adjoining (level L_H,tot of 25 to 30 dB(A) according to SIA 181).

The values of SIA 181:2020 were not verified (a presentation of the 2006 edition cites L_H ≤ 28 dB(A) for installations). AEAI (VKF) guideline 23-15 «transport installations» covers smoke extraction at the shaft head: its text could not be read.

Indicative information prepared from the tool's specifications; it replaces neither standards SIA 500, SN EN 81-20 and SN EN 81-70, nor the lift manufacturer's sheet, nor the fire protection concept.