1. Standard SIA 181: why a renovation in a condominium (PPE) requires a completely different acoustic costing from a rental dwelling
SIA 181:2020 distinguishes minimum requirements and enhanced requirements. The enhanced level must be agreed by contract; in a condominium (PPE) it is often demanded. The values in our sheets are to be checked in the standard.
1.1 Comparison table in decibels (dB): minimum requirements vs enhanced requirements (+3 dB stricter in a condominium (PPE) for airborne noise, impact noise and sanitary pipes)
For a rental dwelling, our sheets take Di ≥ 52 dB, L'nT ≤ 53 dB, equipment LH ≤ 33 dB; in a condominium (PPE; enhanced requirements) Di ≥ 55 dB, L'nT ≤ 50 dB, LH ≤ 30 dB. In terraced houses, Di ≥ 57 dB and L'nT ≤ 48 dB. The 3 dB gap corresponds to a clearly perceptible difference.
1.2 The obligation to send a written warning (Art. 25 SIA 118) if a co-owner replaces carpet with tiles or parquet without an acoustic underlay
Replacing carpet with tiles or parquet without an acoustic underlay degrades impact-sound insulation and may breach the condominium (PPE) regulations. The craftsman who notices this must inform the client in writing before laying (Art. 25 SIA 118 and Art. 365 para. 3 CO).
2. Siting an external heat pump (PAC): avoiding permit refusal and neighbours' objections (OPB / Cercle Bruit)
A PAC is judged by the noise it produces at the neighbour's, not in the client's garden. The location does almost everything.
2.1 The night-time limit of 45 dB(A) in a residential zone (Sensitivity Level ES II (DS II)) at the open window of the nearest neighbour
In a residential zone (ES II (DS II)), the planning value used in our sheets is 45 dB(A) at night and 55 dB(A) by day (50 and 60 dB(A) in a mixed zone DS III). The assessment level is calculated at the nearest neighbour's window: Lr = LwA + Dc + K − (20·log10(d) + 11).
2.2 The corner-effect trap: why placing a PAC against 2 walls (+6 dB) or under an eave in a corner (+9 dB) derails the public notice
A PAC in free field adds 3 dB (hemisphere), against a facade 6 dB, in a corner or under an eave 9 dB. These directivity corrections can be enough to exceed the planning value: moving the machine or adding an enclosure is simpler than pleading before the municipality.
3. Frequently asked questions about the SIA 181 standard and PAC noise (FAQ)
3.1 Why is acoustics the leading cause of court-appointed expert reports in condominium (PPE) buildings in Switzerland?
We have no reliable statistic that confirms this claim. What is certain is that the agreed acoustic requirement level (minimum or enhanced) is often poorly defined in contracts, which feeds disputes. Specify the SIA 181 level aimed at in writing.
3.2 At what minimum distance from the neighbour's window must a PAC of 55 dB(A) sound power (LWA) be placed?
With our formula, the minimum distance can be calculated: for a PAC of 55 dB(A) against a facade (Dc = 6) and Ke = 6, the level at the neighbour's window reaches 45 dB(A) at about 3.6 m (zone ES II (DS II), night). Use our calculator for your case; the authority remains competent.
3.3 Is the « night silent mode » of a heat pump accepted by the cantonal environment departments?
It depends on the canton and the file: silent mode reduces the sound power, but the authority may demand proof (manufacturer's sheet) and guaranteed operation at night. Attach the LwA value of the silent mode to the application.
Keywords covered: standard SIA 181 acoustics dB values pdf · difference minimum and enhanced acoustic requirements PPE SIA 181 · noise validation heat pump neighbourhood Cercle Bruit OPB · 45 dB(A) night threshold sensitivity level DS II PAC · penalty reverberation facade corner +6 dB +9 dB PAC · impact-noise insulation floating screed parquet tiles PPE.
The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.