Warranties for Defects & Limitation (2 years, 5 years, 10 years): CO 2026 vs SIA 118 Comparison Table & Rejection Letter
Complete 6-page guide (PDF) and Word template. Notice of defects (avis des défauts), warranty and limitation, before and after 1 January 2026: CO and SIA 118 table, three letters including the rejection of a late claim, evidence and procedure in case of dispute.
Interactive tool: claim valid, time-barred or prescribed, and burden of proof
Loading the tool…
📄 The « Brut de chantier » pack to download (free)
PDFDOCX⚖️ 'Pure Law' File
Synoptic Table of Warranties (CO 2026 vs SIA 118) & Rejection of a Late Claim
Complete 6-page guide (PDF) and Word template. Notice of defects (avis des défauts), warranty and limitation, before and after 1 January 2026: CO and SIA 118 table, three letters including the rejection of a late claim, evidence and procedure in case of dispute.
Table of warranties: former CO, CO revised on 1 January 2026 and SIA 118
Procedure when you receive a claim, three letters
Dispute over defects: evidence, expert report, preservation of evidence, prior conciliation
Printable PDF document · Editable Word template (.docx)
1. Full legal comparison: Former CO vs New Revised CO (01.01.2026) vs SIA 118 Standard
Three texts, three logics: the immediate notice of the former law, the 60-day period of the revised CO and the 2-year warranty period of SIA 118. The CO articles were re-read on Fedlex; those of SIA 118 must be checked in the applicable edition.
1.1 What the reform of the Code of Obligations on 1 January 2026 changes: the mandatory 60-day period for notice of defects (avis des défauts) (Art. 367 para. 1bis & Art. 370 para. 4 CO) and the mandatory right to free repair (Art. 368 para. 2bis CO)
For a building work, the client has 60 days from discovery of the defect to report it, and any shorter agreement is void. The reform also protects the right to have defects remedied: a clause that excludes or restricts it in advance is void for certain buildings. Read the exact text before drafting your conditions.
1.2 The regime of the SIA 118 standard (Art. 172 to 180): why the reversal of the burden of proof for 2 years (Art. 174) disadvantages the craftsman
During the 2-year warranty period, the client may report defects at any time (Art. 172 SIA 118) and, in the event of a dispute, it is for the contractor to prove that a recorded fact is not a defect (Art. 174 para. 3). From the third year, the proof reverts to the client. Check these articles in your edition.
Consequences by party involved
Party involved
What the law says for them
Main contractor
Answers for 5 years towards the client (CO 371); 2-year SIA 118 warranty with the burden of proof on it in the 1st period (Art. 174).
Subcontractor
Must cover itself with a warranty aligned with the one it owes to the main contractor.
Client
Must report defects within 60 days of discovery (CO 367 para. 1bis); burden of proof on it after 2 years.
2. How to lawfully dismiss an abusive, late client claim or one linked to lack of maintenance
A late claim or one outside the warranty is rejected in writing, within a reasonable period, citing the precise reason.
2.1 From day 1 of the 3rd year (up to 5 years): only hidden defects reported within the legal period are covered, and the client has to prove everything
After the 2-year warranty period of SIA 118, only hidden defects are covered, reported within the legal period, and the burden of proof is on the client. The 5-year limitation period of Art. 371 CO limits the action in time. Answer each notice in writing with the reason relied on.
2.2 The trap of the limitation gap (Art. 371 CO): your suppliers often guarantee you 2 years while you owe 5 years to the client
Your materials supplier may limit its warranty to 2 years while you answer for 5 years towards the client. Negotiate an aligned warranty in your purchases, or provision for the risk in your prices. Our table compares the durations to be checked.
3. Frequently asked questions about warranty periods in construction in Switzerland (FAQ)
3.1 In what case does the limitation period go from 5 years to 10 years in Switzerland (defect concealed by fraud)?
When the contractor has intentionally concealed a defect, the limitation period is no longer 5 years: SIA 118 takes 10 years for concealed defects. Fraud presupposes intent, which is hard for the client to prove: the concealment must be demonstrated.
3.2 Can a contractor shorten by contract the 5-year limitation period (Art. 371 CO) with a private client?
No, not to the client's detriment for a building work: Art. 371 CO forbids changing the 5-year period to the client's detriment. A clause that shortens it would be void.
3.3 Does a goodwill visit for a touch-up restart the 2-year or 5-year warranty period from zero?
Not necessarily: a goodwill touch-up is not an acknowledgement of a defect. But to avoid any ambiguity, state in writing « without acknowledgement of liability ». SIA 118, on the other hand, provides a new period for remedial works carried out under the warranty.
Keywords covered: warranty period building works Switzerland 2 years 5 years · reform code of obligations 2026 period notice of defect 60 days art 367 para 1bis 370 para 4 · reversal burden of proof SIA 118 art 174 · limitation 5 years building work art 371 CO · rejecting client claim outside warranty period letter template · supplier materials warranty 2 years vs 5 years client.
General information based on Swiss law in force — does not replace personalised legal advice.
The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.