SIA 263 / EN 1090 Tool 6.08 Online

Steel Calculator (SIA 263 / EN 1090) & Guardrail Checker (SIA 358 Standard)

Execution class selector EXC1–EXC3, SIA 358 guardrails & corrosion protection.

Interactive tool

Rules from the specifications. Guardrails: threshold of 1,00 m, height of 100 cm (110 cm above 12 m), opening of 12 cm, climbing zone (SIA 358 not consulted; confirmed by secondary sources from the bpa and Suva, except climbing). The masses of IPE, HEA and HEB sections are those of standard EN 10365; those of tubes are calculated.

A Guardrail compliance checker (SIA 358)

m

3 Fall height > 12 m, public staircase or walkway

cm
cm

Guardrail verdict

The 4 vital rules

    The "Yes" box forces the height of 110 cm (public staircase or walkway). Openings of 12 cm at most are checked for all uses. The site guardrail comes under the OTConst (art. 22), not the SIA 358.

    B Weight of steel sections and execution class (SN EN 1090-2)

    ml

    Weight, surface area and execution class

    Mass per metre
    Total steel weight
    Area for painting, powder coating or galvanising
    Corrosivity categories ISO 12944
    CategoryEnvironment
    C2: lowRural atmosphere with little pollution; unheated buildings where condensation may form (warehouses, sports halls).
    C3: mediumUrban and industrial atmosphere with moderate pollution; production premises with high humidity (laundries, dairies, breweries).
    C4: highIndustrial and coastal zones with moderate salinity; chemical plants, swimming pools.
    C5: very highIndustrial zones with permanent humidity and an aggressive atmosphere; coasts with high salinity.

    Weight = mass per metre × length. Tubes: round exact, rectangular with sharp corners (2 to 3 % more than the catalogue). There is also an EXC4 class.

    Embed this calculator on a website page

    Paste this code into the page, or write [outil code="6.08"] in the content of a page on the site.

    📄 File linked to this tool (free)

    Move from calculation to full management

    Keep your references at hand, then automate them in your quotes, bids and final statements.

    ⚡ Automate this calculation in our ERP / Soumission software (Trial)

    Technical reference guide

    SIA 358 standard and BPA recommendations: the 4 vital rules of a compliant guardrail in Switzerland

    The guardrail standard SIA 358 height 100cm steel construction sets the requirements for guardrails and parapets of buildings. According to the brochure of the Swiss Council for Accident Prevention (bpa) and Suva, a protective element is required from 1.00 m fall height. The four rules the tool uses are:

    1. a guardrail from 1.00 m fall height;
    2. a minimum height of 100 cm above the walkable surface, 110 cm beyond a 12 m fall;
    3. an opening of 12 cm at most between balusters (test sphere);
    4. no horizontal element that makes climbing easier between 12 and 65 cm in a building accessible to children.

    Minimum height of 100 cm (110 cm from 12 m), maximum spacing of 12 cm and a ban on the ladder effect

    The baluster spacing guardrail 12 cm SIA 358 is that of a sphere 12 cm in diameter that must not pass through any opening: a child's head cannot get through. The ladder effect appears when horizontal elements (rails, cables) allow a child to climb: in a building accessible to children, the specification forbids these elements between 12 and 65 cm, except with an inner flap or a solid panel up to 65–75 cm.

    Guardrail infill and requirements checked by the tool
    Infill12 cm openingLadder effect (building with children)
    Vertical barsTo be checkedNo ladder effect
    Solid panel or VSG glassNot applicableNo ladder effect
    Horizontal elements or cablesTo be checkedNon-compliant

    Clarification on the text of the standard. The 1.00 m threshold, the 100 cm height, the 110 cm beyond 12 m and the 12 cm sphere are confirmed by secondary sources (bpa brochure, Suva); the SIA 358 itself was not consulted. The climbing zone of 12 to 65 cm is a rule of the specification, not verified. The tool checks the 12 cm opening for all uses, as a precaution. On a site, the perimeter guardrail comes under the OTConst (art. 22: 100 cm, 15 cm toe board, 47 cm between rails): see the OTConst safety plan.

    SIA 263 standard and SN EN 1090 certification: why execution class EXC2 is the standard on Swiss sites

    The EN 1090 EXC2 execution class steel construction Switzerland sets the level of fabrication, welding and traceability checks of a steel structure (SN EN 1090-2). The SIA 263 is the design standard for steel structures; execution is certified according to SN EN 1090. The specification distinguishes three cases:

    Execution classes EXC1 to EXC3 of the specification
    ClassType of structureRemark
    EXC1Simple metalwork, agriculturalSimple metalwork and agricultural structures: the lowest execution requirements of SN EN 1090-2.
    EXC2Standard steel framework for buildingsStandard class for building steel frames (the specification states "90 % of buildings in Switzerland", not verified).
    EXC3Engineering structure, fatigue loadingEngineering structures and elements subject to fatigue: reinforced checks. A fourth class, EXC4, exists for heavily stressed structures.

    Clarification on the text of the standard. The SN EN 1090-2 provides for four execution classes, from EXC1 to EXC4, whereas the specification names only three; the statement "EXC2 for 90 % of buildings in Switzerland" is that of the specification, not verified. The class is chosen according to the consequence class of the structure and the type of loading: the engineer sets it in the project.

    Table of weights per linear metre (kg/m) of HEA, HEB and IPE sections and anti-corrosion classes (ISO 12944 C2 to C5)

    The steel section weight calculation HEA HEB IPE kg/m is the product of the mass per metre from the table and the length; the surface to be treated is the developed surface per metre multiplied by the length. Masses from the tables (EN 10365 standard) and surface per metre:

    Mass per metre and surface per metre of IPE sections
    IPE section120140160180200220240270300
    Mass (kg/m)10,412,915,818,822,426,230,736,142,2
    Surface area (m²/m)0,4750,5510,6230,6980,7680,8480,9221,0401,160
    Mass per metre and surface per metre of HEA sections
    HEA section100120140160180200220240260280300
    Mass (kg/m)16,719,924,730,435,542,350,560,368,276,488,3
    Surface area (m²/m)0,5610,6770,7940,9061,0201,1401,2601,3701,4801,6001,720
    Mass per metre and surface per metre of HEB sections
    HEB section100120140160180200220240260280300
    Mass (kg/m)20,426,733,742,651,261,371,583,293,0103,0117,0
    Surface area (m²/m)0,5670,6860,8050,9181,0401,1501,2701,3801,5001,6201,730

    Corrosion protection is chosen according to the corrosivity category of the ISO 12944 standard; hot-dip galvanising C3 C4 anti-corrosion is the usual solution for the medium and high categories:

    Corrosivity categories ISO 12944
    CategoryEnvironment
    C2: lowRural atmosphere with little pollution; unheated buildings where condensation may form (warehouses, sports halls).
    C3: mediumUrban and industrial atmosphere with moderate pollution; production premises with high humidity (laundries, dairies, breweries).
    C4: highIndustrial and coastal zones with moderate salinity; chemical plants, swimming pools.
    C5: very highIndustrial zones with permanent humidity and an aggressive atmosphere; coasts with high salinity.

    Clarification on the text of the standard. The masses per metre of the IPE, HEA and HEB sections are those of the EN 10365 standard, checked in two independent tables; the surfaces per metre come from trade tables (rounded). The ROR and RKR tubes in the tool are calculated: exact for round tubes, with sharp corners for rectangular tubes (about 2 to 3 % more than the catalogue). The ISO 12944 standard also has a CX category; zinc thicknesses are not calculated. ⚡ Price your metalwork in Soumission

    Frequently Asked Questions on Guardrails, Steel and the EN 1090 Standard (FAQ)

    1. From what height is a guardrail mandatory and how high must it be?

    According to the brochure of the Swiss Council for Accident Prevention (bpa) and Suva, the SIA 358 standard requires protection from 1.00 m fall height. The tool uses a minimum height of 100 cm above the walkable surface, 110 cm if the fall height exceeds 12 m (or for certain public staircases and walkways), and an opening of 12 cm at most between balusters (test sphere, to prevent a child's head from passing through).

    On a site, the perimeter guardrail of the OTConst (art. 22) also has a top rail at least 100 cm high, a 15 cm toe board and at most 47 cm between rails. The climbing zone of 12 to 65 cm is a rule of the specification, not verified; the SIA 358 was not consulted.

    2. Which EN 1090 execution class should I choose: EXC1, EXC2 or EXC3?

    The SN EN 1090-2 standard defines execution classes that set the level of fabrication and welding checks. The specification uses EXC1 for simple and agricultural metalwork, EXC2 as the standard class for building steel frames, and EXC3 for engineering structures and elements subject to fatigue. There is a fourth class, EXC4, for heavily stressed structures, which the specification does not mention.

    The engineer chooses the class according to the consequence class and the type of loading. The statement that EXC2 covers 90 % of buildings in Switzerland is that of the specification, not verified.

    3. How much does an IPE 200 beam weigh and how do I calculate the surface to protect?

    An IPE 200 beam weighs 22.4 kg per metre (mass per metre from the EN 10365 standard) and has 0.768 m² per metre to paint, powder-coat or galvanise. For 12 m of length: 268.8 kg of steel and 9.22 m² of surface. The weight is the product of the mass per metre and the length, the surface that of the developed surface per metre and the length.

    Protection is chosen according to the corrosivity category of the ISO 12944 standard (C2 to C5): hot-dip galvanising is common for categories C3 and C4. The masses of the sections are those of the tables; those of the tubes are calculated.

    Indicative information based on the tool's specification, secondary sources (bpa, Suva) and the OTConst; it does not replace the SIA 358, SIA 263 and SN EN 1090 standards or the engineer's project.