Geographic Construction Price Comparator (26 Cantons & 40 Cities / Resorts)

Compare construction prices between the 26 cantons and 40 cities or resorts (ACIP index).

Interactive tool

A Your quote and the two locations to compare

CHF
%

Amount adjusted for the site location

Index of the starting location
Index of the site location
Adjusted quote amount
Difference in CHF and in %
of which labour
of which materials

The three factors of geographic variation

  1. Cantonal wages and social charges. The wage scales of the collective agreements (CCT, CAF, RESOR) and social charges differ from one canton to another.
  2. Access logistics, travel and parking. Travel time between the depot and the site, parking in town and access restrictions push unit prices up.
  3. Climate and altitude constraints. In the mountains the execution period is shorter, and crane hire or special transport weighs on the cost.

Index = 100 + ACIP percentage relative to the Swiss average; adjusted amount = amount × site index / starting index. The numerical split between the three factors is not provided: the tool does not quantify it. Average regional indices of Pillar 2 (tool 2.2), to be compared with your local prices.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="5.15"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Why the same building site costs up to 18 % more in Geneva or Zurich than on the Valais plain or in the Jura

The difference in construction prices by Swiss canton comes from a mix of wages, logistics and local constraints. The tool measures this difference with the hub's ACIP database: an index equal to 100 plus the regional percentage relative to the Swiss average. A quote of 100'000 CHF drawn up at the Swiss average becomes 112'000 CHF in Geneva and 95'000 CHF in Valais. The construction cost in Geneva, Zurich, Vaud and Valais compares as follows:

Gap between an expensive canton and a less expensive canton in the ACIP database
Expensive canton or cityCheaper cantonDifference for a 100'000 CHF quote
Geneva (canton) (index 112,0)Valais (canton) (index 95,0)+17,9%, i.e. 17'895 CHF
Zurich (canton) (index 114,0)Valais (canton) (index 95,0)+20,0%, i.e. 20'000 CHF
Geneva (canton) (index 112,0)Jura (canton) (index 94,0)+19,2%, i.e. 19'149 CHF
Zurich (canton) (index 114,0)Jura (canton) (index 94,0)+21,3%, i.e. 21'277 CHF
Zurich City (ZH) (index 118,0)Jura (canton) (index 94,0)+25,5%, i.e. 25'532 CHF

Note on the text of the standard. The 18 % gap in the title corresponds to Geneva against Valais (17,9 %); it is higher for the city of Zurich against the Jura. The tool uses the ACIP database of Pillar 2 (26 cantons and 51 localities), whose percentages differ by a few points from the examples in brackets in this tool's specifications (for example Geneva +8 to +10 %): the hub's ACIP values are kept so as to remain consistent with the charges comparator.

Combined impact of cantonal wage scales, urban logistics and parking costs

Three factors explain the geographic variation:

  1. Cantonal wages and social charges. The wage scales of the collective agreements (CCT, CAF, RESOR) and social charges differ from one canton to another.
  2. Access logistics, travel and parking. Travel time between the depot and the site, parking in town and access restrictions push unit prices up.
  3. Climate and altitude constraints. In the mountains the execution period is shorter, and crane hire or special transport weighs on the cost.

The numerical split between these three factors is not provided: the tool gives the total gap and its qualitative breakdown. For wages and social charges by canton, see the comparator of social charges in the 26 cantons and the worker cost simulator. For the time dimension, consult the Observatory of construction price trends in Switzerland (2008-2026), which shows the inflation ranges of the ACIP index by trade.

High-altitude sites and car-free resorts (Zermatt, Verbier, Gstaad): calculating the logistics surcharge coefficient

The extra cost of a mountain building site in an alpine resort such as Zermatt or Verbier is explained by an execution period shortened by snow and frost, by crane hire and special transport and, in a car-free resort like Zermatt, by electric logistics or helicopter lifting. In the ACIP database, high-altitude localities show the following surcharges relative to the Swiss average:

Markup for high-altitude resorts in the ACIP database
ResortMarkupQuote of 100'000 CHF at the Swiss average
Villars (VD)+10 %110'000 CHF
Crans-Montana (VS)+12 %112'000 CHF
Verbier (VS)+18 %118'000 CHF
Zermatt (VS)+25 %125'000 CHF
Gstaad (BE)+20 %120'000 CHF
Engelberg (OW)+10 %110'000 CHF
Andermatt (UR)+18 %118'000 CHF
Saint-Moritz (GR)+25 %125'000 CHF
Davos / Arosa (GR)+16 %116'000 CHF

The logistics surcharge coefficient of a resort is the resort's index divided by the index of the neighbouring lowland canton: for example Zermatt (VS) against Valais (canton): 1,316. These indices are averages: the actual configuration of the site (access, storage area, season) may exceed them.

How the ACIP database automatically adjusts your unit prices across the 26 Swiss cantons

The ACIP regional building price index assigns to each of the 26 cantons a percentage modifier, and to 51 localities (towns and resorts) a percentage of their own. To adjust a works quote according to the canton, the tool applies the following formula: adjusted amount = amount × site index / starting-location index. A bill of quantities drawn up at the Swiss average is thus corrected by the modifier of the site's canton.

Use the tool to compare two offers from different regions or to revise a budget when the project changes location. For a detailed item-by-item estimate with local unit prices, see the Soumission pricing offer.

Frequently Asked Questions about Construction Prices by Canton and High-Altitude Resorts (FAQ)

1. Which is the most expensive canton to build in Switzerland?

In the hub's ACIP database, the most expensive canton is Zug (+15 % relative to the Swiss average), followed by Zurich (+14 %) and Geneva (+12 %). The least expensive is Ticino (-7 %). The same quote of 100'000 CHF goes from 95'000 CHF in Valais to 112'000 CHF in Geneva, i.e. 17,9 % more.

These indices are regional averages (ACIP database of Pillar 2): the actual price depends on the site, the season and local competition.

2. Why does a building site in a ski resort cost 15 to 30 % more?

In the mountains the execution period is shortened by snow and frost, crane hire and special transport weigh on the cost, and access is sometimes limited. In the ACIP database, Zermatt (VS) shows +25 % relative to the Swiss average, i.e. 125'000 CHF for a quote of 100'000 CHF.

In a car-free resort, electric logistics or helicopter lifting are added. The tool does not quantify the three gap factors (wages, logistics, altitude) separately: their split is not provided.

3. How do you adjust a bill of prices from one canton to another?

Divide the index of the site location by the index of the original location and multiply the prices: adjusted amount = amount × index B / index A. Example: a quote of 100'000 CHF drawn up at the Swiss average (index 100,0) becomes 117'895 CHF in Geneva (index 112,0).

Applying the same coefficient to the whole bill is an approximation: labour reacts more strongly than materials. For a precise quote, use local unit prices.

Indicative information prepared from the hub's ACIP database; actual prices depend on the site, the season and local competition.