Aller au contenu
Website
SIA 232/1 Tool 6.10 Online

Roof Covering Calculator (Tiles, Battens) & Underlay according to SIA 232/1 Standard

Calculator for minimum tile pitch, underlay and snow hooks by altitude.

Interactive tool

Rules from the specification. Minimum pitches: clay tile 22°, plain tile 25 to 30°, steel sheet 3 to 7°; slate and fibre cement: minimum pitch (25°) and exposure (20 cm) are assumptions of the tool. Underlay class: specification rule, SIA 232/1 not consulted. Ventilation: rule of thumb (2 ‰ at the eaves, 0.5 ‰ at the ridge), not the SIA 232/1.

A The pitched roof

m²
°
%
m

Pitch, tiles, battens and underlay

Actual pitch area
Tiles or pieces to order
Roof battens
Ventilation counter-battens
Minimum pitch of the model
Ventilation cross-section (rule of thumb)

Roof surface = horizontal area / cos(angle); tiles = roof surface × number per m² × 1,05; battens = roof surface / gauge; underlay according to the margin of the slope over the model's minimum slope (specifications' rule).

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.10"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 232/1 (Pitched roofs): minimum slopes for tiles and choice of underlay class

The standard SIA 232/1 on minimum slope, tiled roof and underlay links the slope of a pitched roof to the type of covering and the underlay required: the lower the slope, the more the roof depends on the underlay to stay watertight. Minimum slopes adopted by the specifications:

Minimum slopes, tiles per m² and gauge by roofing model
RoofingMinimum pitchPieces per m²Exposure (lap)
Standard interlocking clay tile22°12,534 cm
Plain tile / beavertail25° to 30°32,016 cm
Slate / fibre cement25°18 to 2520 cm
Steel trapezoidal sheet / metal standing seam3° to 7°——

Note on the text of the standard. SIA 232/1 is a paid standard, not consulted. The minimum slopes of the clay tile (22°), the plain tile (25 to 30°) and the profiled steel sheet (3 to 7°) are those of the specifications; for slate and fibre cement, the specifications give neither a minimum slope nor a gauge: the tool adopts 25° and 20 cm, assumptions of the tool. In practice, the tile manufacturer states the minimum slope of its product.

When should you move from a normal underlay to an underlay for increased or extraordinary stresses?

The normal, increased, watertight underlay SIA 232/1 exists in three categories. According to professional guides, an underlay for normal stresses only has to drain water that runs off freely; for increased stresses it must be watertight against water rising up to 50 mm; for extraordinary stresses it is also watertight against water beyond 50 mm. The rule applied by the tool is that of the specifications:

Underlay according to the margin of the slope over the model's minimum slope
SituationSelected underlay
Slope at least equal to the minimum slope, normal stress (altitude below 800 m)Normal loading (overlapped joints)
Slope at least equal to the minimum slope, high stress (above 800 m, habitable attic, low slope)Increased loading (bonded or welded)
Slope below the minimum slope, by at most 5°Extraordinary loading (watertight, sealed counter-battens)
Slope more than 5° below the minimum slopePitch too low for this roofing

Note on the text of the standard. The rule «up to 5° below the minimum slope» is that of the specifications, not verified in SIA 232/1. The same guides give other triggers that the tool does not apply: an underlay for extraordinary stresses as soon as the slope of an insulated roof is below 15°, and above 800 m altitude. For a real project, apply the text of the standard and the manufacturer's sheet.

Conversion formula Slope (%) ↔ Degrees (°) and calculation of the actual roof surface, battens and tiles per m2

The calculation of the surface of a pitched roof from the horizontal projection divides the area measured on the plan by the cosine of the angle. The conversion is: slope in % = tan(angle) × 100, and angle = arctan(slope / 100). For the roof in the example (140 m² projected):

Conversion of pitch and pitch area by angle
AnglePitchPitch area for 140 m²Markup
10°17,6 %142,2 m²+1,5 %
15°26,8 %144,9 m²+3,5 %
22°40,4 %151,0 m²+7,9 %
30°57,7 %161,7 m²+15,5 %
35°70,0 %170,9 m²+22,1 %
45°100,0 %198,0 m²+41,4 %

The number of tiles per m2 and gauge of the battens is deduced from the roof surface: with an interlocking clay tile (12,5 tiles per m², gauge of 34 cm), 151 m² of roof surface require 1'982 tiles with 5 % breakage and cuts, and 444 lm of battens (roof surface divided by the gauge). The ventilation counter-battening amounts to 252 lm at 60 cm centres. ⚡ Price your roofing in Soumission

Tiles per m², gauge and 5 % breakage: values from the specifications, not verified; the manufacturer gives the exact values for its tile. The centre spacing of the counter-battening is an assumption (rafter centres).

Ventilation of the underlay and obligation for snow guard hooks (SIA 232/1 and SIA 261)

Under the roofing, a ventilated air space removes moisture and heat: it requires an air inlet at the eaves and an outlet at the ridge. For the roof in the example, a rule of thumb gives an inlet of at least 3'020 cm² (2 ‰ of the roof surface, with at least 200 cm² per metre of eaves) and an outlet of at least 755 cm² (0,5 ‰). The snow guard hooks on Swiss roofs hold back sliding snow: they are generally required above walkways, entrances and squares by municipal and cantonal regulations, taking the snow load into account (SIA 261). For the snow load at the location, see the fire protection and snow load calculator.

Note on the text of the standard. The ventilation areas above do not come from SIA 232/1 (not consulted): they are rules of thumb taken from a German information site (2 ‰ at the eaves, 0,5 ‰ at the ridge), with no Swiss normative value; other sources give different values. The obligation for snow guard hooks depends on the municipal and cantonal regulation and is not quantified by the tool.

Frequently Asked Questions about Roofing, Slope and Underlay (FAQ)

1. How do you convert a roof slope in percent into degrees?

The slope in percent is the tangent of the angle multiplied by 100, and the angle is the arctangent of the slope divided by 100. A roof of 22° therefore has a slope of 40,4 %; a roof of 30° has a slope of 57,7 %. The tool converts both ways: enter either of the two values and the other updates.

Minimum roofing slopes are often given in degrees, specifications in percent: convert before comparing.

2. How do you calculate the actual surface of a pitched roof?

The actual roof surface is the area projected on the ground divided by the cosine of the angle. For 140 m² projected and a slope of 22°, the roof surface measures 150,99 m². This is the area used to order tiles, battens and underlay.

The horizontal projection, measured on the plans, is always smaller than the actual area; the difference grows with the slope.

3. How many tiles per m² and what gauge for the battens?

The specifications assume about 12,5 tiles per m² and a gauge of 34 cm for an interlocking clay tile. For 151 m² of roof surface, with 5 % breakage and cuts, you need 1'982 tiles and 444 lm of battens (roof surface divided by the gauge). For a plain tile, allow about 32 tiles per m² and a gauge of 16 cm.

These figures are usual values from the specifications: the manufacturer states the exact gauge of its tile.

Indicative information prepared from the tool's specifications and professional guides; it replaces neither SIA 232/1 nor the roofing manufacturer's data sheet.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.