Site monitoring

Managing a construction site in Switzerland: construction management, minutes, force majeure (régie), amendments, acceptance, defects and guarantees, in accordance with SIA 118 standard and the Code of Obligations.

  • 48guides
  • 8sections
  • 535pages in other sections
  • 78hub tools

📘 Swiss Construction Management: DGP, DLT and SIA 118 6

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

Master Swiss site management under SIA 112, 102:2026, and SIA 118: DGP and DLT roles, legal obligations, and site risk management.

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

DGP vs DLT vs Site Manager: Division of Civil and Criminal Liabilities (RPH SIA 2026)

Understand the division of civil and criminal liability between DGP, DLT, and site managers under SIA 112 and the Swiss Code of Obligations.

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

Contractor Duty to Notify (SIA 118 / CO): Reporting Design Errors

Master the contractor's duty to notify under the Code of Obligations (CO) and SIA 118. Protect your margins against design errors on Swiss…

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

Discrepancy Between Plans and CAN Quote: Order of Precedence of Contract Documents (SIA 118)

When plans conflict with the CAN quote on a Swiss construction site, discover the priority order of contract documents under standard SIA 118.

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

Representation of the Client by Site Management: Financial and Legal Limits (SIA 118)

What are the representation powers of site management under SIA 118 and the CO? An analysis of financial and legal limits.

Site Management in Switzerland: DGP/DLT Roles, SIA 118 Contracts, and Governance (RPH 2026)

Joint Liability of Subcontractors (LDét / LTN) and Statutory Mortgage Lien of Craftsmen (CC)

Master joint liability under the LDét and craftsmen's statutory liens under the CC. Duty of due diligence and site risk management in Switzerland.

📘 Site Installation in Switzerland: OTConst, SUVA and OLED 6

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Expert guide to site installations in Switzerland: OTConst safety, OLED waste management, SUVA requirements and site management supervision.

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Asbestos, PCB, Lead Survey and Construction Waste Disposal Concept (OLED / OMoD)

Management of asbestos, PCB, lead, and OLED construction waste in Switzerland. Compliance with OTConst and OMoD rules for site management.

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Site Alkaline Wastewater Management, Soil Protection, and Noise (OPB) and Air (OPair) Directives

Swiss rules for managing alkaline wastewater (SIA 431, LEaux), soil protection and noise (OPB) and air (OPair) control on construction sites.

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Dimensioning the Site Layout Plan (PIC): Cranes, LTr Accommodation and ESTI Connections

Dimensioning the site layout plan in Switzerland: tower crane location, site accommodation under OLT 3 and temporary ESTI electrical connections.

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Safety and Health Protection Plan (PSST - OTConst): Mandatory Legal Content

Safety and health protection plan under Art. 4 OTConst in Switzerland. Legal requirements, first aid, and construction site risk management.

Site Preparation and Installation in Switzerland: OTConst Safety, SUVA and OLED Waste

Scaffolding, Edge Protection from 2.00 m, and Shored Excavations from 1.50 m: OTConst & SUVA Rules

OTConst and SUVA rules in Switzerland: edge protection from 2 m, trench shoring from 1.50 m, and scaffolding safety compliant with SIA 222.

📘 Swiss Site Planning: Gantt, Deadlines and SIA 118 6

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

Master Swiss site scheduling: Gantt charts, CFC work rates, drying times and delay management under SIA 118 standard and the Code of Obligations (CO).

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

Average Execution Rates by CFC Trade in Switzerland: Realistic Benchmark for Site Managers

Average execution rates by CFC trade in Switzerland. Realistic benchmarks for site managers under standard SIA 118 and the Swiss Code of Obligations.

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

Bad Weather (Rain, Frost, Heatwaves, Crane Wind): Right to an Extension of Time Under Norm SIA 118

Swiss practical guide to bad weather on construction sites: rain, frost, crane wind, heatwaves, time extensions under norm SIA 118 and the CO.

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

From Master Schedule to Execution Schedule: Critical Path and Concrete / Screed Drying Times

Master the critical path between master and execution schedules in Switzerland. Factor in concrete and screed drying per SIA 112, SIA 251 and SIA 26.

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

Delay Penalties (CO Contractual Penalties) vs Actual Damages: Calculation and Withholding

Delay penalties, CO contractual penalties and actual damages on Swiss sites. Calculation and deduction rules under the CO and SIA 118.

Construction Site Scheduling in Switzerland: Gantt Management, CFC Work Rates and Delays (SIA 118)

Construction Site Delays (SIA 118 / CO): Formal Notice and Third-Party Performance

Managing Swiss site delays under SIA 118 and CO: formal notice procedures, grace period setting, and third-party substitute performance.

📘 Site Minutes and Daily Log in Switzerland: SIA 118 and C 6

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

Master daily site log keeping and the evidentiary weight of site meeting minutes under norm SIA 118, the CO and the Swiss CPC.

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

Deadline to Challenge Site Meeting Minutes: Legal Effect of Silence and Contract Clauses

Legal effect of silence and deadlines to challenge site meeting minutes in Switzerland. Rules under standard SIA 118 and the Code of Obligations (CO).

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

Keeping the Daily Site Log by Site Management and the Foreman: Mandatory Entries

Mandatory entries for the daily site log in Switzerland: site management, foreman records, weather, workforce, OTConst safety, and SIA compliance.

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

Late Client Variation Requests in Site Meetings: Securing Costs and Deadlines Live

Manage late change requests from the client during construction site meetings: lock in addenda, extra costs in CHF and deadlines under the standard.

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

How to Draft Legally Watertight Site Meeting Minutes in Switzerland

Master the probative value of site meeting minutes in Switzerland: requirements under SIA 118 and the Code of Obligations to protect your rights.

Weekly Meetings, Daily Logs and the Evidentiary Value of Site Minutes in Switzerland

Spatial Coordination and MEP / Structural Synthesis: Pre-Pour Conflict Prevention Protocol

MEP and structural spatial coordination protocol before pouring in Switzerland: slab blockouts, compliance with SIA norms and dispute prevention.

📘 SIA 118 Site Financial Management: Measurements & Régie 6

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

Master construction site financial management in Switzerland: joint site measurements, daywork, SIA 118 addenda, and final accounts under trade rules.

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

Verification of Advance Payments, Retention Money (10% / 5% - SIA 118), and KBOB Price Adjustments

Verification of advance payments, 10% or 5% retention money under standard SIA 118, and KBOB price adjustments on Swiss construction sites.

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

SIA 118 Final Account: 2-Month Deadline, 30-Day Check & the Discharge Trap

Master the final account under SIA 118: submission and verification deadlines, balance management and dispute prevention on Swiss building sites.

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

Joint Site Measurement vs Measurement on Plans (SIA 118): Procedures and Forfeiture

Procedures for joint site measurement and plans under SIA 118: quantity traceability, CAN rules, and preventing forfeiture on Swiss construction…

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

Daywork (SIA 118): Daily Sign-Off of Reports and Unordered Work

Master daywork under standard SIA 118: daily report sign-off procedures, handling unordered daywork, and avoiding payment rejections on Swiss sites.

Site Financial Management: Joint Site Measurements, Daywork, and Addenda (SIA 118 / ACIP)

Change Orders & ± 20% Rule on CAN Quantities (SIA 118): Renegotiating a Unit Price

Master the SIA 118 ± 20% rule: renegotiate CAN CRB unit prices, handle addenda, and safeguard construction site margins.

📘 SIA Structural & Finishing Work Site Quality Control 6

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

Swiss quality control guide by CFC: SIA 414 tolerances, concrete, waterproofing, SIA 181 acoustics and management of acceptance of the work.

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

Floating Screeds and Underfloor Heating (SIA 251): Commissioning Protocol and CM Moisture Testing

Commissioning protocol under SIA 251 and CM carbide moisture testing for heated screeds in Switzerland. Acceptance rules, curing times and technical…

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

SIA 181 Acoustic Testing and MEP Embedments: Soundproofing Stairs, Shafts, and Screeds

Acoustic testing protocol under SIA 181: decoupling MEP shafts, stair flights, and floating screeds on Swiss construction sites.

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

Structural Work Inspection (CFC 211): Reinforcement Acceptance, Concrete Cover (SIA 262) and SIA 414 Tolerances

Swiss protocol for inspecting CFC 211 structural work: reinforcement, concrete cover to SIA 262 and SIA 414 tolerances on the construction site.

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

External Joinery and Facades (CFC 221 / 226): Installation in Insulation and Thermal Bridges (SIA 331 / 180)

Installation directives for windows in external insulation (CFC 221/226), weathertightness, and thermal bridging under SIA 331 and SIA 180 standards.

On-Site Technical Quality Control by CFC: Structural, MEP and Finishing Work (SIA 414 / 180 / 181)

Waterproofing Flat Roofs (SIA 271) and Basements (SIA 272): Critical Details and Quality Control

Swiss technical guide for SIA 271 flat roofs and SIA 272 basement tanking: detail points, execution checks, and construction site responsibilities.

📘 SIA 118 Work Acceptance and Defect Management 6

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

Swiss guide to acceptance of the work, defect classification, and commissioning under SIA 118 and the revised Code of Obligations.

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

Compiling As-Built Documentation (DOE) in Switzerland: As-Built Drawings and Certificates

Swiss guide to as-built records (DOE): as-built drawings, certificates, warranties, and SIA 112 and SIA 400 standards on site.

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

Minor vs Major Defects Precluding Acceptance (SIA 118): Criteria and Federal Supreme Court Case Law

Distinguish minor from major defects under SIA 118 and the CO: acceptance criteria, Federal Supreme Court rulings and client rights.

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

The 3 Rights of the Client Facing a Defect (SIA 118 / CO 2026): Remediation, Price Reduction or Cancellation

Swiss guide for clients and site managers: defect remediation, price reduction, or cancellation under standard SIA 118 and the Code of Obligations.

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

SIA Phase 52 (Commissioning): MEP Functional Testing, Hydraulic Balancing and Handover of Keys

Commissioning under SIA 112 Phase 52: MEP testing, hydraulic balancing and building handover for site management in Switzerland.

Acceptance of the Work, Defect Classification, and Commissioning (SIA Phases 52 & 53 / SIA 118)

Works Acceptance Procedure (SIA 118): Notice of Completion, One-Month Period and Tacit Acceptance

Master acceptance under SIA 118: notice of completion, one-month verification period, tacit acceptance, and rigorous defect management.

📘 SIA 118 2-Year and 5-Year Guarantee: Defects and Surety 6

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

Master the 2-year and 5-year warranty periods under SIA 118 and the revised 2026 CO. Defect notices, retentions, and joint and several guarantees.

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

Joint and Several Performance Guarantee (SIA 118): Amount (5% to 10%), Duration and Release Conditions

Guarantee amounts of 5% to 10%, warranty periods and release conditions for joint and several guarantees under SIA 118 and the Swiss Code of…

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

Hidden Defects Between Year 2 and Year 5 (SIA 118 / CO 2026): Valid Notice Requirements

Swiss rules for giving notice of hidden defects between 2 and 5 years under SIA 118 and the CO 2026. Practical guide for site management and clients.

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

2-Year Notice Period (SIA 118) vs 60-Day Period under Revised CO 2026: Burden of Proof

SIA 118 2-year notification period vs 60 days under the 2026 revised CO. Burden of proof and notice of defects on Swiss construction sites.

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

Validly Interrupting the 5-Year Limitation Period in Switzerland: Payment Summons (LP) or Written Waiver

How to interrupt the 5-year limitation period for construction defects under Swiss law: payment summons and written waiver.

Site Management of Warranties in Switzerland: 2-Year / 5-Year Periods, Guarantees, and Hidden Defects (SIA 118 / CO 2026)

Joint Inspection Before the 2-Year Deadline: Complete Protocol to Protect the Client's Rights

Swiss protocol for the joint inspection before the 2-year warranty period expires under standard SIA 118: protect the client's rights against defects.

Other guide sections

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.