Aller au contenu
Website
SIA 331 / SIGaB 002 Tool 6.14 Online

Windows Thermal Calculator Uw (SIA 331) & Safety Glazing (SIGaB 002)

Uw/Ug checker, fall-protection safety glass and RAL airtight installation.

Interactive tool

Standardised calculation, estimated perimeter. Uw = (Ag·Ug + Af·Uf + lg·Ψg) / (Ag + Af) (SN EN ISO 10077-1); the glazing perimeter is estimated by similarity (each sash has the window's height / width ratio). Thresholds Uw ≤ 1,0 and Ug ≤ 0,7 W/m²K and the 1,00 m rule: specifications (SIA 331, SIGaB 002 and SIA 358 not consulted).

A Thermal coefficient Uw of the window

m
m

3 Number of sashes

%

Uw value

Window areas
Uw coefficient
Contribution of the spacer

B Glazing safety checker (SIGaB 002 and SIA 358)

cm
m

Safety glass

Rule in the specifications: sill below 100 cm with a fall height of at least 1,00 m, VSG mandatory on the interior side; sill below 100 cm without a fall, ESG or VSG against cuts.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.14"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 331 and MoPEC: how to achieve Uw ≤ 1,0 W/m2K (the decisive importance of the Warm Edge spacer Ψg)

The calculation of the window coefficient Uw from Ug, Uf and spacer Psi follows the formula of standard SN EN ISO 10077-1: Uw = (Ag × Ug + Af × Uf + lg × Ψg) / (Ag + Af). The glazing (Ug), the frame (Uf) and the spacer (Ψg, linear thermal bridge at the glazing edge) each contribute to the result. The maximum Uw value for a Swiss window under MoPEC of 1.0 W/m2K is the one used in the specifications, with Ug of at most 0,7 W/m²K (MoPEC and Buildings Programme / Programme Bâtiments). For the example window (1,20 × 1,45 m, 28 % frame), depending on the glazing and the spacer:

Uw of the example window depending on the glazing and the spacer, with a frame of Uf = 1,0
GlazingWarm Edge spacer (Ψg 0,032)Aluminium spacer (Ψg 0,075)
Triple glazing Ug = 0.5 W/m²K0,723 W/m²K (compliant)0,834 W/m²K (compliant)
Standard triple glazing Ug = 0.6 W/m²K0,795 W/m²K (compliant)0,906 W/m²K (compliant)
Triple glazing Ug = 0.7 W/m²K0,867 W/m²K (compliant)0,978 W/m²K (compliant)
Renovation double glazing Ug = 1.1 W/m²K1,155 W/m²K (non-compliant)1,266 W/m²K (non-compliant)

The warm-edge spacer gains about 0,11 W/m²K compared with an aluminium spacer: on a multi-sash window, richer in glazing perimeter, the difference is greater. For the U-value of opaque walls, see the U-value calculator; for window replacement subsidies, the Buildings Programme (Programme Bâtiments) simulator.

Note on the text of the standard. The formula is that of the standard, but the glazing perimeter lg is estimated by similarity (each sash keeps the height / width ratio of the window): the exact calculation depends on the profile. The limits Uw ≤ 1,0 and Ug ≤ 0,7 W/m²K are those of the specifications; they were not re-verified in the MoPEC, the Buildings Programme (Programme Bâtiments) or SIA 331 (paid standard, not consulted). ⚡ Price your windows in Soumission

Directive SIGaB 002 and SIA 358: when is safety glass (ESG or laminated VSG) mandatory on your windows?

The SIA 331 standard on windows, glazing and safety under SIGaB 002 is completed, for glass, by directive SIGaB 002: it protects against cuts and against falls. Laminated safety glass (VSG) holds the splinters and stays in place if it breaks; toughened glass (ESG) shatters into small, not very sharp pieces. Rules in the specifications:

Safety glass according to sill height and fall height
ParapetFall height on the outsideGlass required
Less than 100 cm1,00 m or moreVSG mandatory on the interior side (the glazing acts as a fall-protection guardrail)
Less than 100 cmLess than 1,00 m (ground floor, level-access French window)ESG or VSG mandatory on surfaces accessible less than 1,00 m above the ground
100 cm or moreRegardless of the fall heightNo safety glass requirement in the rules of the specifications

The rule of 1,00 metre from the finished floor (protection against injury vs fall-protection guardrail function)

The sill below 1 metre laminated glass VSG is the criterion that triggers the requirement: below 100 cm from the finished interior floor, a person may knock against or lean on the pane. Two functions are added: preventing cuts from broken glass (ESG or VSG), and holding back the person who falls when the fall height reaches 1,00 m, which requires a properly sized VSG, often double VSG or ESG + VSG for a triple glazing. For the example window (sill of 40 cm, fall of 3,0 m), VSG is mandatory on the interior side.

Note on the text of the standard. The 1,00 m rule is that of the specifications; directive SIGaB 002 and SIA 358 (paid) were not consulted. The glazing manufacturer and the engineer confirm the glass composition.

The golden installation rule of SIA 331 with the 3 sealing levels: «more vapour-tight on the inside than on the outside»

The rule of the 3 sealing planes in window installation, inside tighter than outside organises the joint between the window and the wall into three zones. On the inside, a plane that is airtight and vapour-tight prevents moisture from the room from entering the joint. In the middle, the thermal insulation plane fills the joint. On the outside, a rain-tight plane that is open to vapour diffusion lets the joint dry towards the outside. The principle is that the inner plane must always be more vapour-tight than the outer plane, otherwise moisture builds up and causes mould and damage.

Note on the text of the standard. This description is the general principle of window installation («RAL» installation): SIA 331 was not consulted, and neither the text nor the values of the standard are reproduced. Tapes and membranes are chosen according to the manufacturer's data sheet.

Frequently Asked Questions about Windows, the Uw Value and Safety Glass (FAQ)

1. How is the Uw coefficient of a window calculated?

The Uw coefficient of the complete window is calculated with the formula of standard SN EN ISO 10077-1: Uw = (Ag × Ug + Af × Uf + lg × Ψg) / (Ag + Af), where Ag is the area of the glazing, Ug its coefficient, Af the area of the frame, Uf its coefficient, lg the perimeter of the glazing and Ψg the linear coefficient of the spacer. For a window of 1,20 × 1,45 m with a triple glazing of Ug 0,6, a frame of Uf 1,0 and a Warm Edge spacer, the tool gives Uw = 0,795 W/m²K.

The glazing perimeter is estimated by similarity: the exact calculation depends on the profile. The limit of 1,0 W/m²K (with Ug of at most 0,7) is that of the specifications, MoPEC and Buildings Programme (Programme Bâtiments).

2. Why does the Warm Edge spacer matter so much?

The spacer is the edge of the glazing: in aluminium, it forms a thermal bridge around the pane (Ψg of 0,075 W/mK), whereas a warm-edge spacer drops to 0,032 W/mK. For the example window, the Uw goes from 0,906 with aluminium to 0,795 with warm edge, a gain of 0,111 W/m²K, and tips some windows below the limit of 1,0.

The gain is greater on small multi-sash windows, which have proportionally more glazing perimeter.

3. When is safety glass (VSG or ESG) needed on a window?

Under the rules in the specifications (directive SIGaB 002 and SIA 358), when the sill is below 100 cm and the fall height on the exterior side reaches 1,00 m, the glazing acts as a guardrail and must be laminated safety glass (VSG) on the interior side. When the sill is below 100 cm without a fall risk (ground floor, level-access French window), toughened (ESG) or laminated (VSG) safety glass protects against cuts on surfaces accessible less than 1,00 m above the ground.

These rules are those of the specifications, not verified (SIGaB 002 and SIA 358 not consulted): the glazing manufacturer and the engineer confirm the composition.

Indicative information prepared from the formula of standard SN EN ISO 10077-1 and the tool's specifications; it replaces neither SIA 331, nor directive SIGaB 002, nor the manufacturer's data sheet.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.