Balanced Ventilation Flow Rates Calculator & Duct Sizing (SIA 382)

Calculator for the required fresh-air flow rates (m³/h) per room.

Interactive tool

Flow rates from the specifications, SIA 382 not consulted. Flow rates per room (the proposed value is the middle of the specifications' range, editable), air change rate of 0,40 to 0,60 vol/h and velocities of 2,0 to 2,5 m/s (branch ducts) and 3,5 to 4,0 m/s (main duct): specifications (SIA 382/1 and 382/5, paid standards). The specifications give no minimum heat-recovery efficiency: the tool does not invent one.

A Airflow balancing of the dwelling

Supply rooms (fresh air supplied)

Supply rooms
RoomNumberFlow rate per room
Master bedrooms / large bedrooms (30 m³/h) m³/h
Children's bedrooms / offices (25 m³/h) m³/h
Living room / lounge (30 to 40 m³/h) m³/h

Extract rooms (stale air removed)

Extract rooms
RoomNumberFlow rate per room
Kitchen (excluding activated-carbon hood) (40 to 60 m³/h) m³/h
Bathrooms / showers with WC (30 to 40 m³/h) m³/h
Separate WCs (20 to 25 m³/h) m³/h
Laundry / internal storeroom (20 m³/h) m³/h
m³
m³/h

Balance and velocity in the duct

Total supply
Total extract
Balanced nominal flow rate of the unit
Hourly air change rate
Air velocity in the duct

Nominal flow = max(supply, extract); the balance is evened out by transferring the excess through the transfer zones (corridor, living room). Rate = nominal flow / habitable volume. Velocity = (flow / 3600) / (π × (D / 2)²).

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.17"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standards SIA 382/5 and SIA 382/1: official table of air flows (m3/h) per room in a dwelling in Switzerland

The double-flow ventilation flow for a dwelling standard SIA 382/1 is determined room by room: fresh air is blown in (supply) to the bedrooms and the living room, and stale air is drawn out (extract) from the kitchen, bathroom and WC. The standard SIA 382/5 mechanical ventilation of dwellings flows m3/h sets the basic flows for dwellings; the table below reproduces the values from the tool's specifications.

Air flows per room adopted by the specifications
RoomDirectionFlow rate (m³/h)
Master bedrooms / large bedroomsSupply (fresh air)30
Children's bedrooms / officesSupply (fresh air)25
Living room / loungeSupply (fresh air)30 to 40
Kitchen (excluding activated-carbon hood)Extract (stale air)40 to 60
Bathrooms / showers with WCExtract (stale air)30 to 40
Separate WCsExtract (stale air)20 to 25
Laundry / internal storeroomExtract (stale air)20

For a typical dwelling (one parents' bedroom, two children's bedrooms, one living room, one kitchen, one bathroom and one WC), with the middle of each range, the supply is 115,0 m³/h and the extract 107,5 m³/h. The double-flow unit is sized on the larger of the two, i.e. 115,0 m³/h: the balanced nominal flow is max(supply, extract).

Note on the text of the standard. The title of this section, taken from the specifications, speaks of an «official table»: the flows above are those of the specifications, and standards SIA 382/1 and SIA 382/5 (paid) were not consulted. The ranges (living room, kitchen, bathroom, WC) are left editable, with the middle of the range by default. For the insulation of the building, see the U value calculator.

The sweeping principle: supply in the bedrooms and living room, transfer under the doors (undercut) and extract in the wet rooms

Fresh air is blown into the living areas and bedrooms, passes through the dwelling under the doors (undercut) or through transfer grilles, then is drawn out in the wet rooms: kitchen, bathroom, WC. This sweeping avoids carrying humidity and odours towards the bedrooms. The supply extract balancing bedroom living room bathroom consists of adjusting the flows of each valve so that the total blown in equals the total drawn out; the difference of 7,5 m³/h in the example is made up by transfer, in the corridor and living room zone.

Sizing of PEHD ducts (Ø 75 mm / Ø 90 mm) and spiral manifolds: respecting the limit velocity of 2,5 m/s

The maximum air velocity in a ventilation duct for acoustics 2.5 m/s avoids airflow noise at the valves: the specifications adopt at most 2,0 to 2,5 m/s in secondary distribution ducts made of high-density polyethylene (PEHD), and at most 3,5 to 4,0 m/s in the main manifold. The velocity is v = (flow / 3600) / (π × (D / 2)²), with D the inside diameter in metres.

Maximum flow per duct diameter according to the permitted velocity
DuctRoleFlow rate at the recommended velocityFlow rate at the limit velocity
Ø 63 mm PEHDBranch duct22 m³/h (2,0 m/s)28 m³/h (2,5 m/s)
Ø 75 mm PEHDBranch duct32 m³/h (2,0 m/s)40 m³/h (2,5 m/s)
Ø 90 mm PEHDBranch duct46 m³/h (2,0 m/s)57 m³/h (2,5 m/s)
Galvanised steel main duct Ø 125 mmMain collector155 m³/h (3,5 m/s)177 m³/h (4,0 m/s)
Main duct Ø 160 mmMain collector253 m³/h (3,5 m/s)290 m³/h (4,0 m/s)
Main duct Ø 200 mmMain collector396 m³/h (3,5 m/s)452 m³/h (4,0 m/s)

A Ø 75 mm duct suits a bedroom: it carries up to 32 m³/h at the recommended velocity. The living room at 35 m³/h exceeds this recommended velocity while staying under the limit of 2,5 m/s, and the kitchen at 50 m³/h exceeds the limit: for these rooms, a larger diameter is preferable. A Ø 160 mm manifold absorbs the 115,0 m³/h of the unit without noise. The tool asks for the flow of the chosen duct: the flow of a room for a secondary duct, the nominal flow of the unit for a manifold.

Note on the text of the standard. The velocities of 2,0 to 2,5 m/s and 3,5 to 4,0 m/s are those of the specifications (acoustic verdict SIA 181 and SIA 382) and were not re-verified in these standards. The diameters are nominal inside diameters; the «spiral manifolds» in the title correspond to the Ø 125, 160 and 200 mm manifolds in the tool. For noise outside, see the SIA 181 standard tool.

MoPEC energy requirements: minimum thermal efficiency of the heat recovery unit and filter maintenance (ePM1 / F7 and G4)

The heat recovery unit efficiency for double-flow ventilation MoPEC measures the share of the heat of the stale air passed on to the fresh air. The cantons' model energy provisions (MoPEC) set requirements for ventilation installations with heat recovery; the tool's specifications give no minimum efficiency value, and the tool does not invent one: the ventilation designer and your canton's energy law set the figure to be met.

Filters are classified by efficiency: the specifications cite classes ePM1 / F7 (fine filter) and G4 (coarse filter). In practice, the fine filter protects the fresh air blown into the dwelling and the coarse filter protects the unit on the extract-air side; filters clog and are replaced according to the manufacturer's instructions, which maintains flows and air quality.

Note on the text of the standard. MoPEC, SIA 382/1 and the filter classes were not consulted: the location of the filters is general practice information, not verified in a standard. Follow the unit manufacturer's instructions. ⚡ Price the ventilation of your projects in Soumission

Frequently Asked Questions about Double-Flow Ventilation, Flows and Ducts (FAQ)

1. What air flows to allow per room in a dwelling's double-flow ventilation?

The specifications adopt, for fresh air (supply), 30 m³/h per parents' bedroom, 25 m³/h per child's bedroom or office and 30 to 40 m³/h for the living room; for stale air (extract), 40 to 60 m³/h for the kitchen, 30 to 40 m³/h per bathroom with WC, 20 to 25 m³/h per separate WC and 20 m³/h for a utility room. For a dwelling with 1 parents' bedroom, 2 children's bedrooms, 1 living room, 1 kitchen, 1 bathroom and 1 WC (middle of the ranges), the supply is 115,0 m³/h and the extract 107,5 m³/h: the unit is chosen on the larger of the two, 115,0 m³/h.

The balance must be even: the difference of 7,5 m³/h is made up by air transfer (door undercuts, corridor / living room zone). The flows are those of the specifications; standards SIA 382/1 and 382/5 were not consulted.

2. What maximum air velocity in the ducts to avoid noise?

The specifications require at most 2,0 to 2,5 m/s in secondary distribution ducts (high-density polyethylene, PEHD) and at most 3,5 to 4,0 m/s in the main manifold. The velocity is the flow divided by the cross-section: (flow / 3600) / (π × (D / 2)²). A Ø 75 mm duct at 30 m³/h (one bedroom) gives 1,89 m/s; at 50 m³/h (the kitchen), 3,14 m/s, too high; a Ø 90 mm duct at 50 m³/h, 2,18 m/s; a Ø 160 mm manifold for the 115,0 m³/h of the unit, 1,59 m/s.

The flow to enter depends on the duct: the flow of a room for a secondary duct, the nominal flow of the unit for a manifold. The thresholds are those of the specifications; they were not re-verified in SIA 382 or SIA 181.

3. What air change rate to aim for in a dwelling and what efficiency for the heat recovery unit?

The hourly air change rate is the nominal flow divided by the habitable volume. The specifications aim for 0,40 to 0,60 volumes per hour for housing: for a volume of 280 m³ and 115,0 m³/h, the rate is 0,41 vol/h, at the bottom of the target. A very airtight and little-occupied dwelling makes do with the bottom of the range; a heavily occupied dwelling requires more.

The specifications give no value for the minimum efficiency of the heat recovery unit required by MoPEC, and the tool does not invent one: the ventilation designer and the text of your canton's MoPEC set this requirement.

Indicative information prepared from the tool's specifications; it replaces neither standards SIA 382/1 and 382/5, nor the ventilation designer's calculation.