Photovoltaic Simulator: kWp Output, Pronovo Payment (PRU) & Standards (SIA 2057 / AEAI)
Simulator for kWp production, PRU (Pronovo) one-off payment & fire-safety distances on the roof.
Interactive tool
Indicative Pronovo tariff, values partly unverified. Tariff in force: 360 CHF/kW (added system) and 400 CHF/kW (integrated) up to 30 kW, according to the OFEN explanatory note announcing an increase of 40 CHF/kW on 1 April 2027. The amount above 30 kW, the base contribution (Grundbeitrag) and the tilt bonus for façades are not verified: they are editable. Yields, tariffs, self-consumption, cost (2 200 CHF/kWp) and tax: specifications or assumptions.
A Solar simulator and one-off payment
B One-off payment rates and financial assumptions
Production, payment and profitability
- Panels
- Installed peak power
- Estimated annual production
- Pronovo one-off payment (indicative)
- Annual financial gain
- Investment
- Payback period
Panels = floor(area / 2,0). Output = panels × Wp / 1000. Production = kWp × yield × orientation. Gain = self-consumption × avoided price + feed-in × buy-back tariff. Payback = (investment − one-off payment) × (1 − tax) / annual gain.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.19"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
One-off Payment (PRU) from Pronovo in Switzerland: how is the federal subsidy per installed kWp calculated?
The Pronovo photovoltaic subsidy Switzerland 2026 PRU is a one-off payment made by Pronovo, the body responsible for implementing federal support for renewable electricity, to owners of a photovoltaic installation. It is calculated from the installed capacity. The calculation of kWp output of solar panels from the area in m2 starts with the number of panels: the floor of the area divided by 2,0 m², then peak output = panels × unit output / 1000. With 60 m² and panels of 440 Wp: 30 panels, i.e. 13,20 kWp, and 13'860 kWh per year facing due south on the Plateau.
Note on the text of the standard. The specifications speak of a tier of 0 to 30 kWp at about 360 CHF/kWp for an add-on installation. An explanatory note from the Federal Office of Energy (November 2026) raises by 40 CHF/kW, on 1 April 2027, the contribution linked to the capacity of installations under 30 kW: 400 CHF/kW for an add-on or stand-alone installation and 440 CHF/kW for an integrated installation. The scale in force before that date is therefore 360 and 400 CHF/kW: the tool offers both scales. The amount of the 30 to 100 kW tier (300 CHF/kW), the base contribution (Grundbeitrag, 0 by default) and the inclination bonus for facades (0 by default) were not verified: they are editable, and only Pronovo prevails. The applicable scale is that of the date of the application.
Scale difference between add-on panels (surface-mounted), integrated panels (BIPV) and facade bonus (≥ 75°)
An add-on installation is mounted on top of the existing roofing (tiles, profiled steel sheet); an integrated installation (BIPV, building-integrated photovoltaics) replaces the roofing and ensures watertightness. The scale for the integrated installation is higher (400 against 360 CHF/kW). The specifications also provide for an inclination bonus for facade installations (75° or more); its amount was not verified, and the tool offers it with 0 CHF/kW by default, to be entered according to Pronovo.
| Power | Added (current rate) | Integrated (current rate) | Added (from 1 April 2027) | Integrated (from 1 April 2027) |
|---|---|---|---|---|
| 5 kWp | 1'800 CHF | 2'000 CHF | 2'000 CHF | 2'200 CHF |
| 10 kWp | 3'600 CHF | 4'000 CHF | 4'000 CHF | 4'400 CHF |
| 30 kWp | 10'800 CHF | 12'000 CHF | 12'000 CHF | 13'200 CHF |
| 40 kWp | 13'800 CHF | 15'000 CHF | 15'000 CHF | 16'200 CHF |
| 80 kWp | 25'800 CHF | 27'000 CHF | 27'000 CHF | 28'200 CHF |
Above 30 kWp, the upper tier is calculated at 300 CHF/kW (unverified assumption). To estimate the cantonal grants that may be added, see the Buildings Programme simulator (Programme Bâtiments).
Standard SIA 2057 and AEAI (VKF) Information Sheet: hail resistance (HW3 to HW5), reaction to fire RF1 and firefighter access on the roof
The standard SIA 2057 for solar installations and the «Solar installations» information sheet of the Association of Cantonal Fire Insurance Institutions (AEAI, VKF) frame the safety of roof installations. The specifications adopt three requirements:
- Hail. Cantonal insurers recommend hail resistance HW3 HW4 HW5 of solar panels in Switzerland: class HW 3 to HW 4 at least, HW 4 or HW 5 strongly recommended.
- Fire. The AEAI (VKF) guideline on solar panels on the roof, fire barrier distance concerns the distances and separations from fire walls, and the reaction to fire of materials is expressed by the RF indices of the AEAI (VKF), RF1 designating a material that does not contribute to fire.
- Firefighter intervention. A disconnection of the direct-current installation, accessible to firefighters, and circulation routes and safety clearances on the roof.
Note on the text of the standard. These requirements are those of the specifications: standard SIA 2057, the AEAI (VKF) information sheet «Solar installations» and the register of hail classes were not consulted, and no distance, dimension or value is reproduced. The installer, the cantonal building insurer and the fire service confirm the measures to be provided. The tool does not check these points; for the fire resistance of a wall and the snow load on the roof, see the AEAI (VKF) and snow tool.
Optimising the profitability of a photovoltaic installation: self-consumption, coupling with a Heat Pump / EV (VE) Charging Point and RCP
Electricity consumed on site avoids a purchase at the grid price (29 ct./kWh in the example), whereas the surplus fed in is bought back at a much lower tariff (11 ct./kWh). Increasing the self-consumption share therefore improves profitability. For the installation in the example (13,20 kWp, 2'200 CHF/kWp, 25 % tax):
| Self-consumption | Annual gain | Net investment | Payback time |
|---|---|---|---|
| Without battery: approx. 35 % | 2'398 CHF | 18'216 CHF | 7,6 years |
| With heat pump and charging point: about 50 % | 2'772 CHF | 18'216 CHF | 6,6 years |
| With storage battery: approx. 70 % | 3'271 CHF | 18'216 CHF | 5,6 years |
Coupling the installation with a heat pump or an electric vehicle charging point shifts part of the consumption to production hours, which raises self-consumption from 35 % to about 50 % in the specifications. A grouping for own consumption (RCP) allows several consumers on the same site, for example the tenants or co-owners of a building, to share the solar electricity produced on site.
Note on the values. The investment of 2'200 CHF/kWp, the tax of 25 %, the tariffs and the self-consumption rates (35, 50 and 70 %) are assumptions of the specifications, editable. The cost of a battery is not included: with 70 % self-consumption, the payback time in the table only holds if the battery cost is added to the cost per kWp. The conditions of an RCP (production capacity, accounting) were not verified here: see federal energy legislation and the grid operator. ⚡ Price your solar installations in Soumission
Frequently Asked Questions about Photovoltaics, Pronovo Payment and Profitability (FAQ)
1. How many kWp and kWh does a roof of 60 m² produce?
The specifications count about 2,0 m² per panel: 60 m² carry 30 panels of 440 Wp, i.e. 13,20 kWp. Annual production is the capacity multiplied by the regional yield (1'050 kWh per kWp per year on the Plateau, 1'250 in central Valais and Ticino) and by the orientation factor: 13'860 kWh per year facing due south on the Plateau, 12'197 kWh per year with east-west orientation on a flat roof (88 %).
The yields, the orientation factors and the area of 2,0 m² per panel are those of the specifications; they are indicative, and an installer's study takes account of shading, inclination and losses.
2. What amount of one-off payment (PRU) from Pronovo can be expected?
For an installation under 30 kW, the scale in force is 360 CHF per kW for an add-on installation and 400 CHF per kW for an integrated installation: 4'752 CHF for 13,20 kWp as an add-on, 5'280 CHF as integrated. An explanatory note from the Federal Office of Energy announces a rise of 40 CHF per kW on 1 April 2027 (400 and 440 CHF per kW), i.e. 5'280 and 5'808 CHF for this installation. Above 30 kW, the tool applies a tier of 300 CHF per kW: 13'800 CHF for 40 kWp.
The amount of 300 CHF per kW above 30 kW, the base contribution (0 by default) and the inclination bonus for facades (0 by default) were not verified: enter Pronovo's values. The applicable scale is that of the date of the application.
3. What is the payback time of a photovoltaic installation?
The tool divides the investment, reduced by the one-off payment and the tax deduction, by the annual gain. With 2'200 CHF per kWp and 25 % tax, the net investment is 18'216 CHF for 13,20 kWp. The annual gain depends on the share of electricity consumed on site, paid at the avoided price of 29 ct./kWh rather than at the buy-back tariff of 11 ct./kWh: about 35 % without battery (2'398 CHF per year, payback in 7,6 years), 50 % with heat pump and charging point (2'772 CHF per year, 6,6 years).
The cost of 2'200 CHF per kWp, the tax of 25 %, the tariffs and the self-consumption rates are editable assumptions. The cost of a battery is not included: with 70 % self-consumption, the payback of 5,6 years only holds if the battery is added to the cost per kWp.
Indicative information prepared from the tool's specifications and an SFOE (OFEN) note; it replaces neither Pronovo's decision, nor standard SIA 2057, nor the AEAI (VKF) information sheet.