Damage and Cracks to Neighbouring Buildings (Art. 679 CC): Legal Liabilities & Joint Inspection Report Template

Complete 6-page guide (PDF) and Word template. Documenting neighbours' cracks before the works: owner's liability, invitation letter, joint inspection record, photographic survey and RC (liability) insurance.

Interactive tool: which insurance steps in, and header of the inspection report

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

PDFDOCX ⚖️ 'Pure Law' File

Joint Inspection Report Template for the Condition of Neighbouring Buildings

Complete 6-page guide (PDF) and Word template. Documenting neighbours' cracks before the works: owner's liability, invitation letter, joint inspection record, photographic survey and RC (liability) insurance.

  • Liability of the owner (Art. 679 and 684 CC) and proof
  • Invitation letter, inspection report and photographic survey to be signed by the neighbours
  • Business liability (RC) of the company and RC of the client, evidence checklist, frequent mistakes, practical case and cases where a lawyer should be consulted

Printable PDF document · Editable Word template (.docx)

1. Article 679 of the Swiss Civil Code: why the neighbour does not even need to prove fault to be compensated

Neighbour law protects against the excesses of the owner who builds, regardless of any fault. This is the logic of strict liability, which surprises clients.

1.1 The strict, fault-independent liability of the owner of the land under works towards his neighbours (Art. 679 & 684 CC)

A person who is affected or threatened by damage because an owner exceeds his right may take action against him (Art. 679 CC). The owner must refrain from any excess to the detriment of the neighbour, in particular through noise and vibrations exceeding the usual tolerance (Art. 684 CC). No fault is required.

1.2 The cascade recourse against the contractor and the civil engineer in the event of breach of the rules of care (Art. 110 SIA 118 / Art. 41 CO)

The client that has been ordered to pay can have recourse against the contractor and the civil engineer if a fault in execution or design is shown (Art. 41 CO; precautions regarding neighbouring structures, Art. 110 SIA 118, to be checked). The client's RC covers unavoidable damage, the company's RC covers execution faults: read your policies.

Consequences by party involved

Party involvedWhat the law says for them
Main contractorAnswers for its execution faults (CO 41; business liability RC); protects its position through a dated inspection report before the works.
SubcontractorSame regime for its package (sawing, piles); makes sure an inspection report is made before its own works.
ClientStrict liability towards neighbours without fault (CC 679 and 684); its RC covers unavoidable damage.

2. The absolute shield: make a joint photographic inspection report of the surrounding properties BEFORE the first spade is put in the ground

A neighbour who claims that his cracks are new and a site that claims they are old: only a document dated before the works settles it.

2.1 Why the absence of a prior condition survey condemns you to pay for cracks that had already existed for 20 years at the neighbour's

Without a survey dated before the first saw cut, it is impossible to prove that the cracks pre-existed. The judge then draws the consequences of the uncertainty against the one who should have taken the precautions: the site pays.

2.2 How to invoice the joint inspection report before works as a professional service in your quote (CHF 350 to 600)

Price the inspection report in the quote: room-by-room survey, dated photos with a graduated scale, crack-gauge markers if useful, signed copy handed to the neighbour. A range of CHF 350 to 600 is an order of magnitude to be adapted to the size of the neighbouring building.

3. Frequently asked questions about damage to neighbours during a building site (FAQ)

3.1 What should you do if the neighbour refuses to let us into his property before the works to draw up the joint condition survey?

Document the refusal in writing (registered letter proposing several dates), photograph what is visible from the street and from outside, and inform the client. The neighbour's refusal weakens his position if cracks are later alleged.

3.2 Who pays for the cracks at the neighbour's if the contractor worked perfectly according to the rules of the art (client's RC)?

The owner of the land under works is in principle liable without fault (Art. 679 CC); it is the client's RC, or a construction works insurance, that covers the damage that is unavoidable despite work done to the rules of the art. Check the policy.

3.3 Should a bailiff or an independent expert be called in for sites with a high vibration risk?

For high-risk sites (sawing, heavy demolition, piles nearby), an independent expert is advisable: he draws up a neutral inspection report and can install measuring devices. A bailiff is not compulsory; the signed joint inspection report is enough in most cases.

Keywords covered: crack house works neighbour Switzerland law · article 679 civil code owner liability · joint inspection report condition survey before works pdf word · article 110 SIA 118 precautions neighbouring structures · difference client RC and company RC cracks · vibrations site sawing demolition recourse neighbour.

General information based on Swiss law in force — does not replace personalised legal advice.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.