Aller au contenu
Website
👷 Trade guides 94 guides 3 sections

Employment and recruitment

Working and recruiting in the Swiss construction industry: collective labour agreement, salary and social charges, permits and cross-border workers, notice periods and protection, from both candidate and employer perspectives.

  • 94guides
  • 3sections
  • 489pages in other sections
  • 78hub tools

📘 Guides · candidate 45

Guides · candidate

10 Mistakes That Get a Foreign or Cross-Border CV Rejected in 15 Seconds by a Swiss SME

Discover the 10 CV mistakes that disqualify cross-border workers in Swiss construction and the rules to get hired by Swiss SMEs.

Guides · candidate

Family Allowances in Switzerland (LAFam) and Differential Top-Up for Cross-Border Workers

Practical guide to LAFam family allowances and differential top-ups in Switzerland for cross-border construction workers. Steps, CHF amounts and…

Guides · candidate

Sick Leave or SUVA Accident in Swiss Temp Work: Indemnity Duration & Waiting Period

Daily allowances (IJM & SUVA) for Swiss temp construction workers. Waiting periods, coverage, and rules under LSE and CO.

Guides · candidate

SUVA Non-Occupational Accident Insurance (NPA from 8h/Week) and 6-Month Extension by Agreement

Practical SUVA guide: 8h/week threshold for non-occupational accidents, NPA cover and extension through 6-month interim accident insurance.

Guides · candidate

Withholding Tax in French-Speaking Switzerland (VD, GE, VS, FR, NE, JU, BE): Understanding Tariffs A, B, C and H

Swiss Romandie withholding tax guide for construction (VD, GE, VS, FR, NE, JU, BE): tariffs A, B, C, H, compliant wages and tax deductions.

Guides · candidate

Staff Leasing CLA: Why Temporary Staffing Agencies Must Comply with Construction Site Minimum Wages

Construction site minimum wages & Staff Leasing CLA: temporary staffing agency obligations, local rules, and joint commission audits in Switzerland.

Guides · candidate

Obtaining an Adult Construction CFC (OFPr) after 5 Years of Experience: Procedure and Salary Increase

Obtain an adult construction CFC under OFPr after 5 years of experience: cantonal steps, qualification, and salary progression in Switzerland.

Guides · candidate

Application File for Swiss Construction Executives (Site Manager, Draftsperson, Architect): SIA References

Swiss guide for applying as a site manager, draftsperson or architect. Showcase your project references under SIA 118 and art. 330a CO.

Guides · candidate

Swiss CV, Cover Letter and Interview in Construction: The Complete Guide to Landing a Job

Draft an impactful Swiss CV, prepare your cover letter and ace your construction interviews. Practical advice and Swiss norms to land your job.

Guides · candidate

13th Month Pay in Swiss Construction: Prorated Calculation on Arrival or Departure During the Year

Swiss guide to prorated 13th month pay in construction: hiring, departure, illness and National Collective Agreement rules.

Guides · candidate

Spontaneous Applications in Romand Swiss Construction: Targeting Local SMEs vs General Contractors

Spontaneous applications in Swiss construction: target SMEs, general contractors, or staffing agencies based on your profile and Romand CLA rules.

Guides · candidate

Work Certificates and Telephone Reference Checks: Why Swiss Recruiters Verify Everything

Learn why Swiss construction recruiters require full work certificates (art. 330a CO) and how telephone reference checks are conducted lawfully.

Guides · candidate

CN Wage Scale (C, B, A, Q): How to Have Your Seniority Recognised and Advance to a Higher Grade

Wage progression across CN classes C, B, A and Q in Swiss construction. Seniority criteria, grade reclassification and building worker rights.

Guides · candidate

Opening a CHF Salary Account and Transferring Your Pay Without Hidden FX Fees

Guide to opening a CHF account, avoiding hidden FX fees, and transferring your construction site salary in compliance with Swiss rules.

Guides · candidate

ES Site Manager and DFDT Construction Director Pathways in French-Speaking Switzerland: Prerequisites and Career Prospects

ES site manager and DFDT construction director pathways in French-speaking Switzerland: entry requirements, CFC, salaries, and management…

Guides · candidate

Framework and Assignment Contracts in Switzerland: Checking Clauses Before Starting on the Construction Site

Check your framework and temporary assignment contracts in Swiss construction: mandatory LSE clauses, CLA wages and statutory notice periods.

Guides · candidate

Becoming a Team Leader then Site Foreman with a Federal Diploma in Switzerland: Schools, Parifonds Funding and Salaries

Career path to team leader and site foreman with federal diploma in Switzerland: schools, Parifonds funding, CLA salaries and VPETA framework.

Guides · candidate

All Swiss Construction Payslip Deductions Explained Line by Line (AVS, AC, LPP, SUVA ANP)

Understand Swiss construction payslip deductions: AVS, AC, LPP, SUVA ANP and joint contributions under the CO and collective agreements.

Guides · candidate

Succeeding in Your Interview with a Swiss Contractor or Site Manager and Your Trial Day on Site

Swiss legal framework and expert advice to pass your interview with a site manager and succeed during your practical trial day on a construction site.

Guides · candidate

Reading and Checking Your Swiss Construction Payslip: Social Deductions, 13th-Month Pay, and CLA Rights

Understand your Swiss construction payslip in 2026: AVS, AC, LPP contributions, 13th-month salary, holidays and CLA rules under the CC.

Guides · candidate

Ending a Temporary Assignment in Switzerland: Rules for 2-Day, 7-Day, and 1-Month Notice Periods

Swiss notice periods for temporary construction work: notice of 2 days, 7 days or one month under the LSE and the Staff Leasing CLA.

Guides · candidate

Holiday Pay on Hourly Wages (8.33%, 10.64%, or 13.04%): When Are You Entitled to 5 or 6 Weeks?

Holiday pay calculation on hourly wages in Swiss construction (8.33%, 10.64%, 13.04%). Entitlements under the CO and collective labour agreements.

Guides · candidate

Meal Allowances, Mileage Reimbursements and Depot-to-Site Travel Time under the CN and CCT SOR

CN and CCT SOR guide: calculating meal allowances, mileage reimbursements and tracking depot-to-site travel time in Swiss construction.

Guides · candidate

Site Shutdown for Bad Weather (Frost, Rain, Heatwave): Continued Pay and Compensation Rules

Frost, heavy rain or heatwaves: discover your rights to pay continuation, CN rules and employer duties on Swiss construction sites.

Guides · candidate

Temporary Work in Swiss Construction: Staff Leasing CLA, Rights, and the temptraining Fund

Complete guide to temp work in Swiss construction: CLA wages, assignment contracts, daily sickness benefits and temptraining grants up to 5,000 CHF.

Guides · candidate

Irrevocable Choice Between Swiss LAMal and Cross-Border CMU: Comparative Calculation and Strict 3-Month Deadline

Swiss cross-border construction worker: compare LAMal vs CMU, meet the strict 3-month deadline, and avoid automatic enrolment. Guide & calculations…

Guides · candidate

LPP (2nd Pillar) Contributions in Temporary Work: Your Rights with Dependent Children or Cumulated Assignments

LPP affiliation for temporary workers in Switzerland: entitlements from the 1st hour with dependent children or cumulated assignments under LSE and…

Guides · candidate

Franco-Swiss Technical Construction Glossary (SIA, CFC, CAN, Raft Slab, Pad Footings) Essential for Supervising a Crew

Master Swiss technical vocabulary (SIA, CFC, CAN, raft slab) to supervise on Romandie construction sites and advance your career.

Guides · candidate

Swiss Construction CV Template for CFC Workers and Foremen: Key Differences with a European CV

Learn the key differences of a Swiss CV for CFC workers and foremen. Tailor your application to Swiss construction recruiter expectations.

Guides · candidate

Negotiating Your Hourly or Monthly Construction Salary in Switzerland Using CLA Pay Classes

How to negotiate your Swiss construction salary using CLA wage grids, professional classes, and industry reference scales.

Guides · candidate

Permis L (Short-Term) vs Permis B (Residence): Swiss Rules and Changing Employer

Key differences between L and B permits in Swiss construction: granting rules, employer procedures, and job changes under the LEI.

Guides · candidate

Work Permits in Switzerland (G, B, L), Cross-Border Status, Withholding Tax and LAMal: 2026 Construction Guide

2026 Swiss construction work permit guide: G, B, L permits, withholding tax in Romandy, and choosing your LAMal health insurance.

Guides · candidate

Securing the Cross-Border G Permit in Construction: Criteria, Weekly Return, and Cantonal Procedures

Requirements for the cross-border G permit in Swiss construction: weekly return, cantonal procedures, and employment contract obligations under the…

Guides · candidate

Crane Operator (Cat. A/B), Plant Operator M1-M7, Forklift and MEWP Licences: CACES Equivalences and SUVA-Recognised Exams

SUVA rules for Cat. A/B crane drivers, M1-M7 plant operators, forklifts and MEWPs: CACES equivalence, work safety and compliance on Swiss sites.

Guides · candidate

Debt Enforcement and Criminal Records: When Can a Swiss Employer Require Them?

Debt register and criminal records in Swiss construction: when can you ask for them? LPD framework, proportionality rules, and applicant rights.

Guides · candidate

90-Day Notification Procedure (SECO): How to Start a Short-Term Mission Legally in Switzerland

2026 guide to the Swiss 90-day notification: SECO rules, employment contract under art. 319 CO, construction CLA, and short-term mission formalities.

Guides · candidate

Quasi-Resident Status and Subsequent Ordinary Assessment (TOU): The 90% Swiss Income Rule

Understand Geneva's quasi-resident status, TOU, and the 90% Swiss income rule. Optimise your withholding tax in the construction sector.

Guides · candidate

Early Retirement from Age 60 in Swiss Construction: How the FAR and RESOR Foundations Work

How FAR and RESOR early retirement pensions from age 60 work in Switzerland: eligibility rules, CLA procedures, and pension calculations for the…

Guides · candidate

Late Wages or Unpaid Overtime: Free Legal Remedies (Paritary Commission & Labour Court)

Late wages or unpaid overtime on Swiss construction sites: procedures, paritary commissions, and labour courts to recover what you are owed.

Guides · candidate

Moving from Temp to Perm (Open-Ended) with a Client: 3-Month LSE Rule and Ban on Restrictive Clauses

Moving from temp to perm with a client in Switzerland: discover the 3-month rule under the LSE and why restrictive hiring clauses are null and void.

Guides · candidate

How to Check that a Construction Staffing Agency Holds Cantonal and SECO Licences (LSE)

Verify SECO and cantonal LSE licences of Swiss staffing agencies in French-speaking Switzerland to safeguard your contracts and site wages.

Guides · candidate

temptraining Joint Fund: How to Obtain up to 5,000 CHF in Funded Training and Licences

Secure up to 5,000 CHF through temptraining to fund crane operator licences, plant machinery, or language courses in Swiss temporary construction…

Guides · candidate

Working as a Foreign Electrician in Switzerland: ESTI Equivalence and OIBT Authorisations

Guide to ESTI equivalence and OIBT permits for foreign electricians in Switzerland: application steps, minimum wages, and legal compliance.

Guides · candidate

How to Have a Foreign CAP, Bac Pro, BTS, or Engineering Degree Recognised by SEFRI in Switzerland

SEFRI procedure for foreign construction diplomas in Switzerland: equivalences, wage brackets, and cantonal steps for CAP, Bac Pro, and engineers.

Guides · candidate

Career Progression in Swiss Construction: Adult CFC, Team Leader, or Site Manager

Career progression in Swiss construction: adult CFC, CLA pay scale upgrades, team leader federal certificate, site foreman, and site manager diplomas.

📘 Guides · recruiter 45

Guides · recruiter

Managing Absences, Untimely Dismissal (CO) and Work Certificates

Swiss contractor guide: managing sick leave, statutory protection against untimely dismissal, contract termination and work certificates under the CO.

Guides · recruiter

Employer Day 1 Obligation (CFST 6508 Directive & SUVA): Signed Safety Briefing and Handover of PPE

Employer Day 1 obligations on Swiss sites: PPE issue, safety induction under CFST 6508 directive, and SUVA safety rules.

Guides · recruiter

Mandatory SUVA (LAA) Affiliation in Construction: AP/ANP Tariff Classes and the Bonus-Malus System

Swiss guide to mandatory SUVA LAA building affiliation: calculate UI and NUI premiums, tariff risk classes, and the bonus-malus experience rating…

Guides · recruiter

Chain Fixed-Term Contracts: Federal Supreme Court Sanctions for Circumventing Notice Periods

Successive fixed-term contracts and reclassification in Switzerland: notice periods, financial sanctions, and dismissal protection under the CO.

Guides · recruiter

Monthly CDI, Hourly CDI, CDD or On-Call Contract: Which One Fits Your SME's Activity?

Monthly or hourly CDI, CDD, on-call work: CO framework and collective agreements to pick the right contract for your Swiss construction SME.

Guides · recruiter

LPP 2nd Pillar in Construction: Entry Threshold, Coordinated Salary, and Old-Age Credits by Age

Swiss construction HR guide: LPP entry threshold, coordination deduction, coordinated salary, and old-age credits by age bracket.

Guides · recruiter

Drafting a Swiss Work Certificate (CO): Balancing Truth, Goodwill, and Coded Phrasing

Drafting a compliant Swiss work certificate: balance truth and benevolence under art. 330a CO while avoiding unlawful coded language.

Guides · recruiter

Employer Social Security Contributions in Swiss Construction: AVS, LPP, SUVA, IJM, FAR/RESOR, and Joint Committee Audits

Swiss construction employer guide: AVS, LPP, SUVA, IJM, FAR/RESOR and joint committee audits. Master your wage bill and ensure full compliance.

Guides · recruiter

Construction Employee Exit Checklist: Final Settlement, 31-Day SUVA ANP Notice and Vested Benefits

Swiss construction departure checklist: holiday & overtime balances, 31-day SUVA LAA duty of information, and LPP vested benefits transfer for…

Guides · recruiter

Non-Compete Clauses for Site Managers and Cost Estimators (CO): When Do They Apply?

Validity of non-compete clauses for Swiss construction managers: CO requirements, customer base, trade secrets and enforceable limits.

Guides · recruiter

Abusive Dismissal (CO) vs Mutual Termination Agreement: Strict Validity Conditions

Abusive dismissal vs termination agreement under Swiss law: compensation risks under the Code of Obligations (CO) for construction sector employers.

Guides · recruiter

The Swiss CO Trap: Notice Nullity (30/90/180 Days) and Calculating Extensions for Illness during Notice

Protection against untimely dismissal under Art. 336c CO: 30, 90 and 180-day periods, nullity of notice and calculating notice period extensions.

Guides · recruiter

Swiss Construction Employment Contracts (Permanent, Fixed-Term, Hourly), AVS Bogus Self-Employment Risks, and Day-1 Safety

Swiss construction HR guide: permanent, fixed-term, hourly, AVS bogus self-employment reclassification risks, and day-one occupational safety…

Guides · recruiter

Joint Commission Audits: Verified Documents, Back-Pay Calculations, and Contractual Penalties

Guide to Swiss construction joint commission audits: mandatory records, salary back-pay calculations, and contractual penalties.

Guides · recruiter

Employer Due Diligence Before Signing: Checking Permits, CFC Authenticity, Crane Licences and References

Swiss protocol for checking work permits, CFC diplomas, crane licences and references to secure your construction hires under LEI, LFPr and LPD.

Guides · recruiter

LTN (Undeclared Work) Site Inspections: Administrative Penalties and Public Procurement Exclusion

Swiss guide to LTN site inspections: employer duties, administrative penalties, and the risk of being excluded from public procurement tenders.

Guides · recruiter

1st Pillar and Unemployment (AVS/AI/APG 5.3% + AC 1.1% up to 148'200 CHF): Calculations and Annual Settlement

Calculating 1st pillar and unemployment insurance in Swiss construction: statutory rates, annual settlement and the 148'200 CHF LACI ceiling.

Guides · recruiter

FAR, RESOR, Parifonds and Cantonal Funds (FONPRO Vaud, etc.): Rates and Subject Liability

Master Swiss FAR, RESOR, Parifonds and FONPRO Vaud contributions: parity rates, site staff liability and CLA compliance in Swiss construction.

Guides · recruiter

Due Diligence (ODét): Exact List of Certificates to Require from Each Subcontractor Before the Construction Site

Exact list of AVS, SUVA and joint-committee certificates to demand from each subcontractor in Switzerland under the LDét and ODét to avoid liability.

Guides · recruiter

Hiring a Cross-Border Worker (EU/EFTA): Employer Steps for the G Permit and Withholding Tax

Employer steps to hire an EU/EFTA cross-border construction worker in Switzerland: G permit, cantonal registration, and withholding tax rules.

Guides · recruiter

Technical Interview Matrix and Site Trial Protocol (SUVA Test Day Cover)

Technical assessment protocol and trial day on Swiss construction sites: LAA cover, SUVA rules, and mitigating undeclared work risks.

Guides · recruiter

Statutory Exemptions from ORP Reporting: Internal Transfer, Assignment <= 14 Days, and Pre-Registered Candidates

Guide to statutory exemptions from ORP job reporting in construction: internal promotions, 14-day contracts, and candidates already registered under…

Guides · recruiter

Sole Proprietor Subcontractors: Preventing Bogus Self-Employment Reclassification by AVS and SUVA

Prevent AVS and SUVA reclassification of sole proprietor subcontractors on Swiss construction sites: criteria, financial risks, and employer…

Guides · recruiter

Overtime (CO) vs Statutory Overtime (LTr): +25% Premium, Compensation or Lump Sum

Swiss HR guide: difference between overtime (CO) and statutory overtime (LTr), 25% premium, compensatory leave and lump-sum pay for managers.

Guides · recruiter

Daily Sickness Benefits (IJM LCA) vs Bern Scale (CO): Construction CLA Requirements

IJM LCA daily sickness benefits or Bern scale under art. 324a CO: Swiss construction CLA duties and employer cost risks explained.

Guides · recruiter

Doubtful Incapacity for Work: Requiring a Certificate from Day 1 and Appointing a Medical Examiner in Switzerland

Require a doctor's certificate from day one and appoint a medical examiner in Switzerland. HR protocol for construction employers under the CO and…

Guides · recruiter

Staff Leasing (LSE), Temp Work vs Permanent Hiring, and Subcontractor Joint Liability (LDét)

Compliance guide for Swiss construction leaders: LSE rules, permanent hiring vs temp work, and joint liability under the LDét.

Guides · recruiter

Immediate Dismissal for Valid Reasons (CO): 2-3 Day Reaction Window and Risk of 6 Months' Indemnity

Immediate dismissal under the Swiss CO: 2 to 3 working days reaction time, valid reasons, and risk of compensation up to 6 months' salary.

Guides · recruiter

Serving an Ordinary Dismissal Without Formal Defects: The Month-End Receipt Rule and Witnesses

Master dismissal notification in Switzerland: receipt rule before month-end, proof by registered mail or witnesses, under the Code of Obligations…

Guides · recruiter

Mandatory Job Registration with ORPs in 2026: Construction Trades Subject to the 5% SECO Threshold

2026 list of construction trades subject to ORP job registration under the 5% SECO threshold (LEI). Practical guide for building contractors and HR…

Guides · recruiter

Starting a Swiss Construction Staffing Agency: LSE Permits, Deposits (CHF 50k–100k) and Manager Rules

LSE permits, CHF 50,000 to CHF 100,000 deposits and qualified manager requirements to open a construction staffing agency in Switzerland.

Guides · recruiter

Mandatory Working Time Recording (OLT 1 & CLA): Site Clocking Requirements

Working time recording rules on Swiss construction sites under OLT 1 and CLAs: daily hours, breaks, and HR monitoring requirements.

Guides · recruiter

Step-by-Step Job-Room Procedure: Complying with the 5-Working-Day Embargo and Avoiding 40'000 CHF in Fines

Master Job-Room reporting for Swiss construction trades: observe the 5-working-day embargo and prevent fines under art. 117a LEI.

Guides · recruiter

Lending a Worker to a Colleague on a Construction Site: Beware of Unlawful Staff Leasing (LSE)

Lending staff between Swiss construction SMEs without an LSE permit carries criminal penalties. Legal framework, subcontracting differences and risks.

Guides · recruiter

Which CLA Applies to Your SME? Boundaries Between CN Structural Work, SOR, Suissetec and EIT.swiss

Determine your SME's CLA liability: allocation criteria between CN Structural Work, SOR, Suissetec and EIT.swiss under the LECCT and CO.

Guides · recruiter

Recruiting in the Swiss Construction Sector: Drafting CFC Job Ads and ORP / SECO (LEI) Reporting Obligations

Swiss construction employer guide: drafting CFC job ads, managing ORP reporting obligations, complying with SECO thresholds and legal hiring rules.

Guides · recruiter

Joint and Several Liability in Construction (LDét): How to Avoid Paying Subcontractor Debts

Master joint and several liability under the LDét on Swiss construction sites: contractor due diligence and how to prevent costly financial claims.

Guides · recruiter

Internal Regulations for Construction SMEs: SUVA Zero Alcohol, Van Use, and Damage Deductions

Swiss framework for SME internal rules: zero tolerance for alcohol under SUVA, site vans, phone use at the wheel and wage deductions under the CO.

Guides · recruiter

How to Write a Swiss Construction Job Offer that Attracts Qualified CFC Professionals

Draft compelling Swiss construction job offers for CFC trades and site managers: CLA compliance, salary brackets, and legal hiring rules in…

Guides · recruiter

Legal Holiday Reduction of One Twelfth (CO): Grace Periods for Illness (1 Month) vs Pregnancy (2 Months)

Legal holiday reduction under art. 329b CO: 1-month grace period for illness, 2 months for pregnancy. Swiss construction site HR guide.

Guides · recruiter

Permanent vs Temp Workers in Construction: Calculating the True Financial Breakeven Point (Agency Markups)

Calculating the financial breakeven between permanent and temp hires in Swiss construction: agency markups, CLAs, and trade-offs under the LSE.

Guides · recruiter

Second-Tier Subcontracting in Swiss Construction: Legal Restrictions, Public Procurement and KBOB Clauses

Legal rules on multi-tier subcontracting in Swiss public tenders: KBOB clauses, due diligence under LDét, and statutory compliance on building sites.

Guides · recruiter

Engaging a European Subcontractor in Switzerland: 8-Day Advance Notice and Joint Guarantee Deposits

8-day prior notification and joint deposit in Switzerland: LDét rules, minimum wages, and primary contractor liability.

Guides · recruiter

Probationary Period in Switzerland (CO & CLA): Maximum 3-Month Duration, 7-Day Notice, and Extension for Illness

Master probation under art. 335b CO and construction CLAs: 3-month maximum duration, 7-day notice period, and statutory extensions for illness.

Guides · recruiter

Recruitment and Swiss LPD (nLPD): Permitted Interview Questions and CV Retention Periods

nLPD guide for Swiss construction employers: permitted interview questions, application file retention periods, and HR data protection.

📘 Tools 4

Other guide sections

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.