Aller au contenu
Website
SIA 243 / SIA 233 / AEAI Tool 6.12 Online

External Wall Insulation Calculator (ITE SIA 243) & AEAI Fire Barriers

Calculator for anchors/m², AEAI fire barriers & measurement rules.

Interactive tool

Consumption and fire rules from the specification, not verified. SIA 243 and AEAI guidelines not consulted. Primer consumption (0.25 kg/m²) and the reveal profile are assumptions of the tool. The fire rules concern combustible insulation (EPS, wood fibre, RF3).

A The façade to be insulated

m²
ml
%

Quantities and fire protection

Material quantities for the external insulation
Line itemQuantity

Insulation area with 5 % waste; mesh with a 10 cm overlap (+12 %); render buckets of 25 kg. Rules in the specifications: EPS up to 11 m; 20 cm RF1 bands from 11 to 30 m; non-combustible insulation above 30 m or in care facilities.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.12"] in the content of a page on the site.

📄 Files and templates linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 243 (insulated rendered façades): exact consumption per m2 (adhesive, base coat, mesh, anchors and render)

The SIA 243 standard on rendered external insulation and AEAI fire protection covers rendered external thermal insulation systems (ITE). A system consists of an insulation board that is bonded and anchored, a base coat reinforced with a mesh and a finishing render. The consumption of adhesive, base coat and scratch-textured render in kg/m2 used in the specifications is: adhesive mortar 5,0 kg/m², base-coat mortar 5,5 kg/m², glass-fibre mesh with a 10 cm overlap (+12 % area), and render of 2,5 to 4,2 kg/m² depending on grain size. The number of anchors per m2 of façade insulation in wind is 6 in the standard zone and 8 to 10 in the edge zone or in strong wind. For the example façade (220 m²):

Material quantities for the example façade
Line itemConsumptionQuantity for 220 m²
Insulation (+5% offcuts)1,05 m²/m²231,0 m²
Adhesive mortar5,0 kg/m²1'100 kg
Reinforced embedding mortar5,5 kg/m²1'210 kg
Glass-fibre mesh+12 %246,4 m²
Disc anchors (standard zone / edge zone)6 / 8 to 10 per m²1'320 / 1'760 to 2'200
2,0 mm finishing render3,0 kg/m²660 kg, 27 buckets of 25 kg

Note on the text of the standard. All these consumption figures are those of the specifications, not verified in SIA 243 (paid standard, not consulted): the technical data sheets of the system manufacturer prevail. The specifications give no primer consumption: the tool uses 0,25 kg/m², an assumption of the tool. ⚡ Price your façade insulation in Soumission

AEAI fire directives on façades: when are rock-wool fire barrier bands (RF1) mandatory with EPS?

A combustible insulation such as expanded polystyrene (EPS, RF3) or wood fibre can spread a fire along the façade. The AEAI fire protection rules therefore limit its use according to the height of the building. The rock-wool fire barrier with EPS on medium-rise buildings under AEAI is a horizontal band of non-combustible rock wool (RF1) that interrupts the combustible insulation. Rules used in the specifications:

Fire protection of the façade according to height and insulation
Building heightCombustible insulation (EPS, wood fibre)Non-combustible insulation (stone wool)
Low height, 11 m at mostPermitted without a fire barrier (protected plinth)Permitted
Medium height, 11 to 30 mHorizontal RF1 fire barrier bands of at least 20 cm, at every floor or every second floor, or RF1 reveal lintels according to an approved systemPermitted
More than 30 m, or care facility or hospitalProhibited: 100% non-combustible insulation mandatoryPermitted (stone wool, cellular glass)

Note on the text of the standard. These rules are those of the specifications, not verified in the AEAI fire protection directives (the sources found come from Germany or from manufacturers and do not allow the height thresholds to be confirmed). Consult the directive in force and the cantonal authority; see also the AEAI fire protection calculator for the fire-resistance requirements of the elements.

Dark colours on façades (light reflectance value HBW < 20) and measurement rules for reveals (SIA 118/243)

The light reflectance index TSR/HBW of the façade measures the share of sunlight that a colour reflects: the HBW (Hellbezugswert) ranges from 0 (black) to 100 (white). A dark colour absorbs the sun's energy and heats the base coat of the insulation, which then suffers thermal stresses. The specifications require an HBW of at least 20 %; below that, avoid black or anthracite renders on thick insulation, unless a special formulation is used («TSR» solar-radiation reflection technology): the surface can exceed 70 °C. The tool flags the colour as soon as the HBW entered is below 20 %.

For the measurement of reveals, the tool counts the corner and reveal profiles on the perimeter entered (95 lm in the example). How reveals are measured and openings deducted depends on the bill of quantities and the contract.

Note on the text of the standard. The HBW threshold of 20 % and the 70 °C limit are those of the specifications, not verified. The reveal measurement rules of SIA 118 and SIA 243 were not consulted: the tool does not apply them, it only counts the perimeter entered. The manufacturer's data sheets give the minimum colour permitted for its system.

Frequently Asked Questions about External Insulation, Anchors and Fire Barriers (FAQ)

1. How many anchors per m² for façade insulation?

The specifications use 6 anchors per m² in the standard zone and 8 to 10 anchors per m² in edge zones or zones exposed to strong wind. For 220 m² of façade, this means 1'320 disc anchors in the standard zone, and 1'760 to 2'200 in the edge zone.

The exact number depends on the approval of the system, the height of the building and the exposure: follow the manufacturer's instructions.

2. What consumption of adhesive, base coat and render per m²?

The specifications use about 5,0 kg/m² of adhesive mortar, 5,5 kg/m² of reinforced base-coat mortar, a glass-fibre mesh with a 10 cm overlap (i.e. 12 % more area) and, for the finishing render, 2,5 kg/m² at 1,5 mm, 3,0 kg/m² at 2,0 mm and 4,2 kg/m² at 3,0 mm. For 220 m²: 1'100 kg of adhesive, 1'210 kg of base coat and 27 buckets of 25 kg of render at 2,0 mm.

These are average consumption figures from the specifications, not verified in SIA 243; the technical data sheets of the manufacturer prevail.

3. When are rock-wool fire barriers mandatory with EPS?

Under the rules of the specifications, a combustible insulation (EPS or wood fibre, RF3) is allowed up to 11 m in height without a fire barrier; between 11 and 30 m, horizontal RF1 rock-wool fire barrier bands of at least 20 cm are needed at every floor or every second floor, or RF1 reveal lintels according to an approved system; above 30 m, and in care facilities, the insulation must be entirely non-combustible (RF1).

These rules are those of the specifications, not verified in the AEAI fire protection directives: consult the directive in force and the cantonal authority; see also the fire protection tool (5.9).

Indicative information prepared from the tool's specifications; it replaces neither SIA 243, nor the AEAI directives, nor the data sheets of the system manufacturer.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.