Aller au contenu
Website
Format: DOCX / PDF Standard: Word · PDF · OTConst DOC 22

Template for a Written Safety and Health Protection Plan (Compliant with Art. 4 OTConst & SUVA)

The written safety plan on 2 pages, to be kept on site from day one.

Interactive tool: OTConst and SUVA obligations to tick off according to your works

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

DOCXPDF

Site Safety Pack OTConst Art. 4

The written safety plan on 2 pages, to be kept on site from day one.

  • Emergency numbers and protection thresholds (guardrails, nets, shoring)
  • Visual inspection checklist for scaffolding
  • Workers' attendance signature sheet

Editable Word template (.docx) · Printable PDF document

1. Why Article 4 of the revised OTConst requires a written safety plan BEFORE the start of every building site

Safety measures are not improvised on the morning of the first day. The ordinance on the safety and health protection of workers in construction work requires that hazards be analysed and measures planned before the site is opened.

1.1 Mandatory content of the 2-page Word/PDF template: emergency organisation (144, 118, Rega 1414), analysis of the hazards specific to the site and the team's signature sheet

The template begins with the emergency numbers (ambulance 144, fire brigade 118, police 117, Rega 1414, poison centre 145), continues with the analysis of hazards and of measures for this site (height, roof, excavation, scaffolding, dust) and ends with a signature sheet proving that each employee has been instructed.

1.2 The mandatory physical thresholds of the OTConst: fall protection from 2 m, roof edges from 3 m and shoring of excavations from 1.50 m

The reference thresholds of our sheets: guardrail or protection from 2.00 m of fall height (Art. 22 and 23), facade scaffolding from 3.00 m (Art. 26), protection of roof edges under Art. 41 to 46, shoring or sloping of excavations deeper than 1.50 m (Art. 68 para. 2). Confirm them in the text in force.

2. How to price and invoice collective safety measures in your CFC quotes

Safety has a cost. A quote that ignores it makes the margin absorb it.

2.1 Perimeter guardrails, roofers' platforms, nets and shoring: full CFC items in their own right and not free overheads

Price the collective protections (edge guardrails, roofers' platforms, nets, shoring, barriers) as separate items, with their installation, hire and removal. They are indispensable to the site: including them in overheads amounts to giving them to the client.

3. Frequently asked questions about the OTConst safety plan (FAQ)

3.1 Is a generic company safety plan enough, or is a specific sheet needed for each site?

The company's general concept is not enough: the analysis must take into account the hazards specific to each site (height, excavations, neighbours, co-activity). Keep a base plan and complete it with a 2-page sheet per site.

3.2 What is the « 2 person-days » rule for roof work in the OTConst?

This name circulates in site meetings: it refers to a reduced working time on a roof for which lighter measures are sometimes tolerated. We have not confirmed this rule in the text of the OTConst: apply the protections provided for roof work and check with SUVA before deviating from them.

3.3 Who must draw up the safety plan when several companies work on the same site?

Each employer remains responsible for its workers and its measures; the client or the site management coordinates the common measures (scaffolding, access, collective protections). Set down in writing who installs and checks the common protections.

Keywords covered: template site safety plan OTConst art 4 free · written safety concept SUVA word pdf · scaffolding shoring excavation checklist SUVA · guardrail height 2m roof 3m OTConst · rule of 2 person-days roof work · site closure SUVA inspection.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.