Depreciation & Internal Re-invoicing Rate Calculator for the Machine Fleet (SSE)

Calculate the depreciation of your machines and the internal re-invoicing rate using the SSE method.

Interactive tool

A Your machine

CHF
years
days / year
h / year
% of depreciation

4 Re-invoicing and purchase options

CHF / h
CHF / h
CHF / day

Internal rental rates (excluding fuel and operator)

Internal daily rate
Internal hourly rate (machine only)
Client daywork rate excl. TVA (HT, per hour)
Annual ownership cost

Breakdown of the machine's annual ownership cost
Line itemAnnual amount (CHF)Share of the total

Buy or rent: break-even point

The rental rate is an editorial estimate: replace it with a rental company's quote (transport, deductible and insurance included).

Embed this calculator on a website page

Paste this code into the page, or write [outil code="4.2"] in the content of a page on the site.

📄 Files and templates linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Why a machine that is already paid for never costs “zero francs” on your sites

A machine paid in cash or fully depreciated keeps costing money: it ties up capital, needs repairs, insurance and storage, whether it works or not. For a 2.5 t tracked mini-excavator worth 42'000 CHF used 140 days a year, the ownership cost is 10'185.00 CHF per year, i.e. 72.75 CHF per day. The internal rental rate site equipment SSE is used to re-invoice this cost to each site, instead of letting it get lost in overheads.

The Swiss SSE calculation method: depreciation, interest on capital and repair provision

The SSE construction machinery catalogue of the Swiss Contractors' Association provides reference values for machinery; the tool takes up its method with average values that you can replace with your own. For the mini-excavator crane depreciation calculation Switzerland, three annual items are added together:

  • Depreciation and interest: new value / service life, plus 60% of the new value at a rate of 3.75% (average interest on the capital tied up). For the 2.5 t tracked mini-excavator: 5'250.00 + 945.00 = 6'195.00 CHF.
  • Repair provision: straight-line depreciation multiplied by a repair coefficient of 60%: 3'150.00 CHF. The repair and maintenance costs building machinery follow use: the more the machine works, the more they weigh.
  • Insurance, machinery breakage and storage: 2% of the new value: 840.00 CHF.

The total annual cost (10'185.00 CHF) is divided by the invoiced days for the daily rate (72.75 CHF) or by the productive hours for the hourly rate (14.55 CHF). The site machine hourly rate daywork invoiced to the client adds 15% to this hourly rate: 16.73 CHF per hour, before fuel and operator.

Difference between hours present on site (made available) and engine running hours

A machine is on site all day, but its engine runs only part of the time. The 2.5 t tracked mini-excavator in the table runs 700 h per year over 140 days, i.e. 5 h per site day. The tool's hourly rate divides the annual cost by the running hours; the daily rate divides the same cost by the days made available.

Invoicing by running hour covers the cost only if the hour meter is read correctly; invoicing by the day protects against days when “machine present, engine off”. At 8.25 h of presence per day, the cost of an hour of presence is 8.82 CHF. For the labour that operates the machine, see the real cost of a worker simulator.

2026 reference table of daily and hourly costs of the 12 common construction machines

Values calculated with the tool's default parameters (3.75% interest on 60% of the new value, 2% insurance, daywork marked up by 15%). These are averages inspired by the SSE method: replace them with the values of your own fleet.

Annual cost, daily rate, hourly rate and client daywork rate for the 12 machines
MachineNew valueDays / hours per yearAnnual costDaily rateHourly rateClient daywork excl. TVA (HT) / h
Tracked mini excavator 2.5 t42'000 CHF140 d / 700 h10'185.00 CHF72.75 CHF14.55 CHF16.73 CHF
Hydraulic excavator 8.5 t115'000 CHF150 d / 850 h25'970.84 CHF173.14 CHF30.55 CHF35.13 CHF
Excavator 15 t195'000 CHF160 d / 1'000 h41'437.50 CHF258.98 CHF41.44 CHF47.66 CHF
Wheeled dumper 3.0 t38'000 CHF130 d / 600 h8'977.50 CHF69.06 CHF14.96 CHF17.20 CHF
Plate compactor 400 kg9'500 CHF110 d / 400 h3'016.25 CHF27.42 CHF7.54 CHF8.67 CHF
Vibratory roller 2.5 t45'000 CHF100 d / 450 h10'631.25 CHF106.31 CHF23.63 CHF27.17 CHF
GMR crane 26 m135'000 CHF180 d / 900 h22'050.00 CHF122.50 CHF24.50 CHF28.18 CHF
Rotating telehandler 18 m145'000 CHF160 d / 900 h31'940.28 CHF199.63 CHF35.49 CHF40.81 CHF
Mobile compressor 4 m3/min18'500 CHF120 d / 500 h4'255.00 CHF35.46 CHF8.51 CHF9.79 CHF
Scissor lift 10 m24'000 CHF130 d / 500 h5'370.00 CHF41.31 CHF10.74 CHF12.35 CHF
Floor saw / core drill6'800 CHF90 d / 300 h2'601.00 CHF28.90 CHF8.67 CHF9.97 CHF
Rotating laser + level3'200 CHF160 d / 600 h1'000.00 CHF6.25 CHF1.67 CHF1.92 CHF

Indicative information: these values are not the official rates of the SSE catalogue, whose current edition prevails. The client daywork rate includes neither fuel, nor operator, nor transport.

Buy or rent your site equipment (Avesco, Huppenkothen, Loxam): the break-even point in days/year

Rental companies such as Avesco, Huppenkothen or Loxam charge by the day, without tying up capital. Buying becomes cheaper than renting as soon as the number of days of use exceeds: fixed costs (depreciation, interest, insurance) / (rental rate per day − repairs per day). Below this threshold, renting is cheaper; above it, the machine you bought pays for itself.

Break-even point between buying and renting for the 12 machines
MachineEstimated rental per dayBreak-even pointPlanned useVerdict
Tracked mini excavator 2.5 t252 CHF30,7 days / year140 days / yearBuy
Hydraulic excavator 8.5 t690 CHF27,8 days / year150 days / yearBuy
Excavator 15 t1'170 CHF25,6 days / year160 days / yearBuy
Wheeled dumper 3.0 t228 CHF30,6 days / year130 days / yearBuy
Plate compactor 400 kg57 CHF41,7 days / year110 days / yearBuy
Vibratory roller 2.5 t270 CHF31,5 days / year100 days / yearBuy
GMR crane 26 m810 CHF21,7 days / year180 days / yearBuy
Rotating telehandler 18 m870 CHF27,5 days / year160 days / yearBuy
Mobile compressor 4 m3/min111 CHF30,6 days / year120 days / yearBuy
Scissor lift 10 m144 CHF30,1 days / year130 days / yearBuy
Floor saw / core drill41 CHF54,2 days / year90 days / yearBuy
Rotating laser + level19 CHF44,1 days / year160 days / yearBuy

The rental rate is an editorial estimate (0.6% of the new value per day), not a rental company's price: ask for a quote, transport, deductible and insurance included, then enter it in the calculator to get your own threshold.

⚡ Integrate your machine rates into Soumission

Frequently Asked Questions on the Cost and Internal Rental of Construction Machinery (FAQ)

1. How much does a construction machine that is already paid for really cost?

A depreciated or cash-paid machine is never free: it ties up capital, wears out, needs repairs and insurance even when it is not working. For a 2.5 t tracked mini-excavator worth 42'000 CHF depreciated over 8 years and used 140 days (700 h) per year, the annual ownership cost is 10'185.00 CHF: 72.75 CHF per day and 14.55 CHF per running hour.

Re-invoicing a machine you already own on a site at “zero francs” amounts to giving your clients these 10'185 CHF per year. The client daywork rate is 16.73 CHF per hour (internal hourly rate marked up by 15%), before fuel and operator.

2. How does the SSE method calculate depreciation, interest and repairs?

The calculation adds up three annual items. Depreciation and interest equal the new value divided by the service life, plus 60% of the new value at a rate of 3.75% (average interest on the capital tied up): for the 2.5 t tracked mini-excavator, 5'250.00 CHF + 945.00 CHF = 6'195.00 CHF. Repairs equal straight-line depreciation multiplied by a repair coefficient (60% here): 3'150.00 CHF. Insurance, machinery breakage and storage cost 2% of the new value: 840.00 CHF.

The total annual cost is then divided by the days made available for the daily rate, or by the engine running hours for the hourly rate. These values are averages inspired by the SSE catalogue method: replace them with your own fleet data.

3. From how many days per year is it better to buy than to rent a machine?

Fixed costs (depreciation, interest, insurance) fall due every year, repairs follow use. Buying becomes cheaper than renting as soon as: days = fixed costs / (rental rate per day − repairs per day). With an external rental estimated at 252 CHF per day (0.6% of the new value, the tool's order of magnitude), the threshold for the 2.5 t tracked mini-excavator is 30.7 days per year: beyond that, owning the machine is more profitable.

Replace this rate with the actual quote of a rental company (Avesco, Huppenkothen, Loxam or a local rental company), transport and deductibles included: the threshold changes greatly from one machine to another.

Indicative information inspired by the method of the SSE construction machinery catalogue; it replaces neither the official catalogue nor the advice of your accountant.