Visual Configurator of the Mandatory SIA 500 Dimensions (Barrier-Free Construction)
View the mandatory dimensions of the SIA 500 standard: WCs, doors, corridors and ramps.
Interactive tool
A SIA 500 standard category
1 Building category
B Dimensions measured or planned on your drawings
2 Doors and thresholds
3 Corridors and wheelchair turning area
4 Access ramp
5 Bathroom or WC
6 Lift
Check of the dimensions of the SIA 500 standard
| Zone and dimension | Entered | Required | Verdict |
|---|
Dimensions from the tool's specification, based on the SIA 500 standard (barrier-free construction). The mention "limit" flags a corridor of 100 to 119 cm allowed only over a short narrowing, or a ramp of 6 to 12 % allowed in constrained renovation. A turning area or a room is checked in both directions (width and depth).
C Ramp length calculator
Required ramp length
- Required horizontal length (height / slope)
- Resting landings
- Total developed length with the intermediate landings
Embed this calculator on a website page
Paste this code into the page, or write [outil code="5.8"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
SIA 500 standard in Switzerland: the crucial difference between Category I (Public buildings) and Category II (Adaptable dwellings)
The SIA 500 standard defines the dimensions of a building that is accessible to any person with reduced mobility (PMR). The barrier-free construction category I and II SIA 500 differ in the level of direct accessibility. Category I covers buildings open to the public and workplaces: everything must be usable as it stands, with the widest dimensions (60 cm side clearance, 165 × 180 cm WC, 90 cm lift door). Category II targets multi-unit residential buildings: the dwellings remain adaptable, that is, they can be fitted out for a wheelchair user with simple works (removing the bath wall, fitting grab rails on reinforcements provided in the walls).
From how many apartments must a new building comply with the SIA 500 standard and have a lift?
Federal law (Disability Discrimination Act, art. 3 let. c) subjects multi-unit residential buildings of more than 8 dwellings to accessibility requirements, which in practice requires barrier-free access and a lift. The cantons may set a lower threshold in their building law: the tool's specification states 4 to 8 dwellings depending on cantonal law.
| Legal basis | Threshold | Verification status |
|---|---|---|
| Vaud (LATC) | from 5 dwellings, according to the specification: 4 to 8 depending on the canton | Not verified |
| Geneva (LCI, RACI) | according to the specification: 4 to 8 depending on the canton | Not verified |
| Valais (LC) | according to the specification: 4 to 8 depending on the canton | Not verified |
| Federal law (LHand, Art. 3 let. c) | more than 8 dwellings | Verified |
Only the federal threshold was verified. The thresholds in the laws of Vaud (LATC), Geneva (LCI, RACI) and Valais (LC) vary and evolve: consult the cantonal law in force and the permit office before sizing the lift.
Summary table of the mandatory SIA 500 dimensions (Doors 80 cm, Thresholds 25 mm, Corridors 120 cm, Turning 140 cm)
This table reproduces the SIA 500 standard accessible WC door corridor dimensions: the dimensions that the tool checks for each category. The clear passage of a door is 800 mm; the maximum threshold height 25 mm window French door also applies to the entrance door, the balcony and the shower. The wheelchair turning circle 140x140 cm is the free manoeuvring area of a wheelchair: 140 × 140 cm in category II, 140 × 170 cm or a circle of 150 cm diameter in category I.
| Zone | Dimension | Category I | Category II |
|---|---|---|---|
| Doors and thresholds | Net clear passage | ≥ 800 mm | ≥ 800 mm |
| Doors and thresholds | Clear side space on the handle side | ≥ 60 cm | ≥ 50 cm |
| Doors and thresholds | Threshold height | ≤ 25 mm | ≤ 25 mm |
| Corridors | Clear width of the corridor | ≥ 120 cm (100 cm over a short narrowing) | ≥ 120 cm (100 cm over a short narrowing) |
| Turning area | Wheelchair manoeuvring | 140 × 170 cm or circle of 150 cm | 140 × 140 cm |
| Ramps | Longitudinal slope | ≤ 6.0 % (up to 10 to 12 % in constrained renovation, over a very short distance) | |
| Ramps | Clear width and resting landing | ≥ 120 cm; landing of 140 cm every 15 m or per 0.80 m of level difference | |
| WC or bathroom | Room dimensions | 165 × 180 cm | 120 × 120 cm adaptable |
| Lift | Car | ≥ 110 × 140 cm | |
| Lift | Door and landing | ≥ 90 cm; landing ≥ 140 × 140 cm | ≥ 80 cm; landing ≥ 140 × 140 cm |
Clarification on the text of the standard. These dimensions and the classification into two categories come from the tool's specification; they were not taken from the text of the SIA 500 standard (2009 edition). The tool checks the circle of 150 cm diameter with a free square of 150 × 150 cm, which is more demanding, and checks the turning area and the rooms in both directions (width and depth).
Calculating a compliant PMR ramp at 6 % and sizing a barrier-free WC without losing floor area
The slope PMR ramp max Switzerland 6% gives the length of the ramp: horizontal length = height to overcome / slope. For 45 cm at 6 %, 7.50 m of ramp is needed, plus an access landing of 140 cm at the top and bottom. An intermediate landing of 140 cm is added every 15 m of ramp or per 0.80 m of level difference.
| Height to overcome | Length at 6 % | Intermediate landings at 6 % | Length at 10 % (constrained case) |
|---|---|---|---|
| 15 cm | 2,50 m | 0 | 1,50 m |
| 30 cm | 5,00 m | 0 | 3,00 m |
| 45 cm | 7,50 m | 0 | 4,50 m |
| 60 cm | 10,00 m | 0 | 6,00 m |
| 80 cm | 13,33 m | 0 | 8,00 m |
| 120 cm | 20,00 m | 1 | 12,00 m |
A slope of 10 % to 12 % is allowed only in a constrained renovation case, over a very short distance and with assistance; in new construction, the ramp is drawn at 6 % at most, and the lift or a platform lift replaces the ramp when the level difference is large.
For the WC, floor area is not lost if you choose the right principle. In category I, a publicly accessible WC measures at least 165 × 180 cm (or 180 × 180 cm), with a fold-down grab rail at a height of 75 cm and the axis of the toilet bowl 45 cm from the wall. In category II, the dwelling remains adaptable: the free space of 120 × 120 cm to 140 × 140 cm in front of the WC, the washbasin and the shower is obtained by simply removing the bath or shower wall, and the walls receive reinforcements at construction for fitting the grab rails. A sliding door or an outward-opening door avoids reserving swing space in the room.
To estimate the floor area that these fittings represent in your project, see the SIA 416 areas and volumes calculator.
Frequently Asked Questions on the SIA 500 Standard and PMR Accessibility (FAQ)
1. What is the minimum width of a door under the SIA 500 standard?
The net clear passage of a door must reach 80 cm (800 mm with the door open at 90°), with a free side space on the handle side of at least 50 cm in category II and 60 cm in category I. The threshold does not exceed 25 mm in height (entrance door, balcony French door, shower).
These dimensions are those of the tool's specification; they were not verified in the text of the SIA 500 standard (2009 edition). The clear passage is measured between the open leaf and the opposite jamb, not between the reveals of the opening.
2. What is the maximum slope of a wheelchair ramp?
The longitudinal slope does not exceed 6 % for a ramp with a net width of at least 120 cm. In constrained renovation, the specification allows 10 to 12 % over a very short distance and with assistance. To overcome 45 cm at 6 %, the horizontal length is 7.50 m; for 120 cm of level difference, 20.00 m and 1 intermediate landing(s) of 140 cm are needed.
A resting landing of 140 cm is provided every 15 m of ramp or per 0.80 m of level difference; the access landing at the top and bottom of the ramp is added to it. The values are those of the specification, not verified in the standard.
3. From how many dwellings must a building be adaptable, depending on the canton?
Federal law (Disability Discrimination Act, art. 3 let. c) concerns multi-unit residential buildings of more than 8 dwellings. Cantonal building laws may set a lower threshold: the tool's specification mentions 4 to 8 dwellings depending on cantonal law (LATC for Vaud, LCI for Geneva, LC for Valais). In an adaptable building, the access, the lift (cabin of 110 × 140 cm, door of at least 80 cm) and the wet rooms must allow adaptation.
The precise thresholds of each canton were not verified: consult the cantonal law in force and the permit office before sizing a lift. The tool gives the dimensions of the standard, not the obligation for your project.
Indicative information based on the SIA 500 standard and the federal Disability Discrimination Act; it does not replace cantonal law or the check by the permit office.