Seismic Zone Checker (Z1 to Z3b) & Renovation Obligations (SIA 269/8)
Find the seismic zone of a municipality and the obligations when renovating (SIA 269/8).
Interactive tool
A Seismic design acceleration (SIA 261 standard)
Design acceleration
- Horizontal acceleration of the zone agd
- Effective acceleration agd,eff = agd × γf × S
- Relative seismic demand
B Renovation or conversion (SIA 269/8 standard)
SIA 269/8 verdict and cantonal practice
- Financial intervention ratio (works / insurance value)
- Conformity factor threshold for this class
αeff < 0.25 (ordinary classes I and II): retrofit mandatory; from 0.25 to 0.40: mandatory if the measures are proportionate; from 0.40: compliant for an existing building. The factor αeff is calculated by a specialised civil engineer. The zone by municipality is indicative: the official SIA 261 map prevails.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="5.7"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Map and acceleration values of the 4 Swiss seismic zones according to the SIA 261 standard (Z1, Z2, Z3a, Z3b)
The Swiss seismic zone map SIA 261 Valais Vaud places each municipality in one of the four zones of the SIA 261 standard: Z1, Z2, Z3a and Z3b. Each zone corresponds to a reference horizontal acceleration agd SIA 261 in m/s², that is, the ground acceleration the structure must be able to withstand on rock. The risk does not follow cantonal borders: Valais, Vaud and Basel have several zones, and the official map prevails for each municipality.
| Zone | Acceleration agd | Typical municipalities (indicative) |
|---|---|---|
| Zone Z1 | 0,6 m/s² | Geneva, Lausanne, Morges, Nyon, Fribourg, Neuchâtel, Bern, Zurich |
| Zone Z2 | 1,0 m/s² | Vevey, Montreux, Yverdon, Delémont, Basel-Country, Schaffhausen |
| Zone Z3a | 1,3 m/s² | Aigle, Bex, Villeneuve, Lower Valais (Monthey, Saint-Maurice), Basel-City, Graubünden |
| Zone Z3b (highest risk in Switzerland) | 1,6 m/s² | Central Valais and Upper Valais (Sion, Martigny, Sierre, Visp, Brig, Zermatt) |
The assignment of municipalities to zones is that of the tool's specification: it is indicative. Check the zone on the official map of the SIA 261 standard or with the cantonal permit office before sizing the structure.
Why the Chablais (Aigle, Monthey) and Valais (Sion, Martigny, Brig) are subject to the Z3a and Z3b requirements
Valais is the most exposed region of Switzerland: it experienced the 1946 Valais earthquake, of magnitude close to 6, and its seismicity remains regular. The standard therefore places the Chablais and Lower Valais in Z3a (1.3 m/s²) and Central Valais and Upper Valais in Z3b (1.6 m/s²), that is 2.7 times the acceleration of zone Z1 in Geneva or Lausanne.
The Rhône plain adds a second factor: its soft alluvial deposits amplify seismic waves and fall into ground classes D or E, which increase the loading further (see below). For a project in Sion, Martigny or Brig, a geotechnical study that determines the ground class is therefore essential before fixing the shear walls and the foundations.
The major impact of the ground class (Classes A to E) and the building class (CO I to CO III)
The effective design acceleration is calculated as agd,eff = agd × γf × S: agd depends on the zone, γf on the building class CO I CO II CO III earthquake (importance of the building for the safety of people and crisis management) and S on the ground class. The tool's coefficients are as follows.
| Ground class | S |
|---|---|
| Class A (sound rock) | 1,00 |
| Class B (dense gravel/sand deposits) | 1,20 |
| Class C (medium-dense sands/gravels) | 1,15 |
| Class D (fine soils / soft alluvial deposits of the Rhône plain) | 1,35 |
| Class E (soft alluvium layer over rock) | 1,40 |
| Structure class | γf |
|---|---|
| CO I (housing, offices, standard shops) | 1,0 |
| CO II (schools, large gatherings > 200 people, public buildings) | 1,2 |
| CO III (hospitals, fire stations, vital infrastructure) | 1,4 |
The combination of these three factors changes the order of magnitude of the loading:
| Zone | Floor | Work | agd,eff | Relative to Z1, ground A, CO I |
|---|---|---|---|---|
| Zone Z1 | A | CO 1 | 0,600 m/s² | × 1,00 |
| Zone Z2 | C | CO 1 | 1,150 m/s² | × 1,92 |
| Zone Z3a | B | CO 2 | 1,872 m/s² | × 3,12 |
| Zone Z3b (highest risk in Switzerland) | D | CO 1 | 2,160 m/s² | × 3,60 |
| Zone Z3b (highest risk in Switzerland) | E | CO 3 | 3,136 m/s² | × 5,23 |
Conversion, additional storey or opening of a load-bearing wall: when does the SIA 269/8 standard apply?
The seismic obligation renovation SIA 269/8 does not concern every renovation. The SIA 269/8 standard governs the seismic assessment of existing buildings, and it becomes decisive when the project affects the structure: removal or opening of a load-bearing wall, an additional storey, a change of use that increases the risk, or a heavy conversion. A renovation of the facade, the kitchen or the installations generally does not fall under it. The tool measures the scale of the work by the ratio between the cost of the works and the fire insurance value of the building: 450'000 CHF of works for 2'000'000 CHF of cantonal building insurance (ECA) value represent 22.5 %.
When the structure is affected, the permit office generally asks for a seismic assessment of the existing structure, with a certificate or an opinion from a civil engineer specialised in earthquake engineering, to be attached to the building permit application. The cantons of Vaud and Valais have their own practice: ask the permit office or the cantonal insurance institution before filing the application.
Understanding the seismic compliance factor (alpha eff: thresholds at 0.25 and 0.40) and the principle of proportionality
The compliance factor alpha eff 0.25 0.40 compares the capacity of the existing structure with the loading of a new structure at the same location: αeff = 1 means that the building is as safe as a new one. It is calculated by a civil engineer. The tool's specification reads the result as follows:
| Factor αeff | Consequence |
|---|---|
| below 0,25 | Seismic retrofit mandatory. |
| from 0,25 to 0,40 | Mandatory measures if they are proportionate: their cost must remain reasonable in relation to the risk reduced (a capped cost per person saved). |
| 0,40 and above | Compliant for an existing building. |
The principle of proportionality means that a building is not required to be strengthened at any price: the longer the remaining period of use and the higher the occupancy, the more costly measures are justified.
Clarification on the text of the standard. The specification applies the thresholds 0.25 and 0.40 to all building classes. According to the sources consulted, the SIA 269/8 standard sets a minimum of 0.25 for ordinary building classes I and II and 0.40 for class II-s (schools) and II-i (important infrastructure) structures. The tool applies 0.40 to building class III and, when the box is ticked, to class II schools. The cap on cost per person saved was not found and is not quantified.
What structural-work extra cost should be allowed for in seismic zone Z3a / Z3b (reinforcement ratios and concrete shear walls)?
The extra cost of structural work in a seismic zone cannot be reduced to a reliable percentage. It depends on the zone, the ground class, the shape of the building and the bracing system: the higher the design acceleration, the more well-distributed reinforced concrete shear walls, dense and ductile reinforcement in the critical zones and interconnected foundations are needed. Conversely, a simple, regular plan with continuous bracing walls from the basement to the roof limits the extra cost.
The tool does not cost this extra: no verified source gives a reinforcement ratio (kg of steel per m³ of concrete) or a shear wall volume valid for all projects, and an invented figure would distort a budget. The order of magnitude of the loading is given by the effective acceleration of the tool (for example × 3.60 for an ordinary building in Z3b on ground D, compared with Z1 on rock); the real extra cost is determined by a preliminary study by a civil engineer at the preliminary design stage, when the shear walls can still be placed freely in the plans.
To include the structural work in a project budget, see the overall budget calculator CFC 0 to 9, and ask your engineer for a costing of the bracing options.
⚡ Price your earthquake-resistant structural work in Soumission
Frequently Asked Questions on the Seismic Zone, the SIA 261 Standard and the SIA 269/8 (FAQ)
1. Which seismic zone applies to my canton or my municipality?
The SIA 261 standard divides Switzerland into four zones: Z1 (agd = 0.6 m/s²), Z2 (1.0), Z3a (1.3) and Z3b (1.6). There is not one zone per canton: Vaud and Valais have several. According to the tool's specification, Geneva, Lausanne, Fribourg and Neuchâtel are in Z1; Vevey, Montreux and Yverdon in Z2; the Chablais (Aigle, Bex, Villeneuve) and Lower Valais in Z3a; Central Valais and Upper Valais (Sion, Martigny, Sierre, Brig) in Z3b.
This classification by municipality is indicative: the official map of the SIA 261 standard and the list of the cantonal authority prevail. On class D ground in Z3b for a class I structure, the design acceleration reaches 2.160 m/s², that is 3.60 times the reference (Z1, ground A: 0.600 m/s²).
2. Is a seismic assessment mandatory during a renovation (SIA 269/8)?
The SIA 269/8 standard governs the seismic assessment of existing buildings. It comes into play mainly when the conversion affects the structure: removal or opening of a load-bearing wall, an additional storey, a change of use that increases the risk. A light renovation (painting, kitchen, installations) generally does not fall under it. The financial scale helps to place the project: 450'000 CHF of works on 2'000'000 CHF of fire insurance value represent 22.5 %.
The exact obligation, the works threshold above which the permit application must contain a certificate from a civil engineer, and the practice vary by canton: ask the permit office or the cantonal insurance institution (Vaud, Valais). The tool sets no monetary threshold.
3. What does the compliance factor threshold of 0.25 mean?
The compliance factor αeff compares the capacity of the existing structure with the seismic loading of a new one: αeff = 1 means it is as safe as a new one. Below 0.25 (ordinary building class I and II), seismic retrofit is mandatory; from 0.25 to 0.40, the measures are required if their cost remains proportionate to the risk reduced; from 0.40, the building is considered compliant.
The specification applies 0.25 and 0.40 to all classes. According to the sources consulted, the minimum of 0.25 applies to ordinary building classes I and II, and 0.40 to schools and important infrastructure: the tool uses 0.40 for building class III and, when the box is ticked, for class II schools. The calculation of αeff is for a specialised civil engineer.
Indicative information based on the SIA 261 and SIA 269/8 standards; it does not replace the official zone map or the study of a civil engineer specialised in earthquake engineering.