Outdoor Works Calculator: Paving, Gravel, Retaining Walls & SIA 318 Standard

Calculator for gravel foundation, slabs on pedestals, retaining walls & fence heights.

Interactive tool

Values from the specifications, SIA 318 not consulted. Gravel thicknesses (20 to 25 / 35 to 45 / 50 to 60 cm), bedding layer of 3 to 5 cm, densities (2,15 and 1,65 t/m³), 1,05, bulking of 1,25, geotextile (+ 15 %), pedestals (3,5 to 4,0 per m²), joint sand (3 to 5 kg/m²) and slope of 1,5 to 2,5 %: not verified; Swiss documents cite at least 1,5 % (paving association) and 2 to 2,5 % (another technical document). Assumptions of the tool: lawn has neither gravel nor bedding layer (topsoil of 15 cm), a slab on pedestals has no bedding layer, the height of the pedestals is ignored.

A Structure, thicknesses and foundation

m²
cm
cm

Thicknesses and excavation

Total excavation depth (box-out)
Excavation volume

B Tonnages and supplies

per m²
kg/m²

Quantities to order

Compacted 0/45 gravel
4/8 grit for the bedding layer
Joint sand
Adjustable pedestals
Geotextile
Topsoil

Base gravel = area × thickness × 2.15 × 1.05; chippings = area × thickness × 1.65; geotextile = area × 1.15; excavation bulked by 25%.

C Drainage slope

%

Slope check

Slope outwards, away from the façade; drains and weep holes behind every retaining wall. L-element walls, rock revetments, heights of fences and hedges: cantonal rules, not priced.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.33"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

SIA 318 standard (Landscaping): what thickness of gravel foundation (0/45) and what bedding layer (4/8) to provide?

The SIA 318 standard landscaping garden slope paving («Garten- und Landschaftsbau», JardinSuisse, SN 507318) is one of the basic standards of the landscape gardener, with SIA 118/318 for the contract; the 2009 edition was completely revised on the basis of the CRB. The gravel foundation thickness terrace driveable area depends on the load and on frost: the specification recommends a 0/45 gravel foundation of:

Thickness of the gravel foundation by type of structure
Work0/45 gravel foundationBedding layer of crushed gravel 4/8
Pedestrian terrace or garden path (gravel of 20 to 25 cm)20 to 25 cm3 to 5 cm compacted
Car parking space or light garage access (gravel of 35 to 45 cm below frost depth)35 to 45 cm3 to 5 cm compacted
Driveable yard for trucks or fire engines (gravel of 50 to 60 cm)50 to 60 cm3 to 5 cm compacted

Note on the text of the standard. SIA 318 (paid) was not consulted: these thicknesses are those of the specification, not verified. The concrete quality of kerbs and foundations is checked with the reinforced concrete tool; pipes and asphalt surfacings are calculated in the civil engineering tool.

Why a minimum slope of 1.5% to 2.0% is mandatory on a slabbed or paved terrace

A flat surface retains water: it stands, seeps into the joints, freezes and dislodges the surfacing. The minimum slope outdoor terrace 1.5% 2% SIA 318 drains water outwards, away from the façade: the specification asks for at least 1.5%, from 1.5 to 2.5% (15 to 25 mm per metre). With 2.0%, a terrace drops 20 mm per metre, i.e. 8 cm over 4 m.

Note on the value. A presentation by the Swiss paving association cites at least 1.5% (laying without slope is possible if drainage is ensured in the sub-layer); a technical document cites 2% (SIA 248) and 2.5% for textured surfaces. These attributions are not verified in SIA 318: the “obligation” in the title is that of the specification. For outdoor tiling, see the tiling tool.

Calculating tonnages of gravel, bedding gravel, topsoil and the number of pedestals per m2 (20 mm porcelain stoneware slabs)

The bedding gravel 4/8 paving calculation m3 tonnes follows the specification's formulas: compacted 0/45 gravel = area × thickness × 2.15 t/m³ × 1.05; 4/8 bedding chippings without fines = area × thickness × 1.65 t/m³; excavation = area × total depth of the box-out, bulked by 25%; anti-contamination geotextile = area × 1.15; jointing sand of 3 to 5 kg/m²; pedestals of 3.5 to 4.0 per m² under slabs of 60 × 60 cm. For 60 m², 25 cm of gravel and 4.0 cm of bedding:

Quantities for 60 m² by surfacing
SurfacingExcavation (in situ / bulked)Gravel 0/45Grit 4/8Joint sandPedestalsTopsoil
2 cm concrete or porcelain stoneware slabs on a 4/8 gravel bed18,60 / 23,25 m³33,86 t3,96 t240 kg00,00 m³
2 cm concrete or porcelain stoneware slabs on adjustable pedestals16,20 / 20,25 m³33,86 t0,00 t0 kg2400,00 m³
6 cm interlocking concrete pavers on a 4/8 gravel bed21,00 / 26,25 m³33,86 t3,96 t240 kg00,00 m³
8 cm interlocking concrete pavers on a 4/8 gravel bed22,20 / 27,75 m³33,86 t3,96 t240 kg00,00 m³
Turf rolls or seeding, with 15 cm of topsoil added0,00 / 0,00 m³0,00 t0,00 t0 kg09,00 m³

Note on the values. Densities, the 1.05 factor, bulking, geotextile, jointing sand and pedestals are those of the specification, not verified. Tool assumptions: a lawn has neither gravel nor bedding and receives 15 cm of topsoil, a slab on pedestals has no bedding, the pedestal height is ignored. ⚡ Price your landscaping works in Soumission

Concrete L-element retaining walls, rock revetments and cantonal rules on the height of fences and hedges on the boundary

The retaining walls concrete L-elements drainage hold back a slope with a prefabricated L-shaped element or with rock blocks. Behind every retaining wall, the specification provides for drainage (drain, filter material) and weep holes, so that water does not build up behind the wall and load it. The design of a wall depends on its height, the earth pressure and the presence of water: beyond a low height, it is the job of an engineer.

The maximum heights of fences and hedges on the property boundary, the distances from the boundary and the permits for walls are set by cantonal and municipal law: they vary from one canton to another and the tool prices none of them. Check with the municipality before planting or building.

Note. The specification gives no value for retaining walls, rock revetments, fences and hedges: nothing was invented. Drainage and weep holes are a requirement of the specification, not verified in SIA 318.

Frequently Asked Questions on Landscaping, Gravel, Pedestals and Slope (FAQ)

1. What thickness of gravel (0/45) and bedding layer (4/8) according to use?

The specification recommends a gravel foundation of 20 to 25 cm for a terrace or path, 35 to 45 cm below frost depth for a parking space or light access, 50 to 60 cm for a driveable yard, and a bedding layer of crushed gravel 4/8 of 3 to 5 cm compacted (SIA 318 standard). For 60 m² of slabs with 25 cm of gravel and 4.0 cm of bedding: 33.86 t of gravel and 3.96 t of chippings; for a parking space with 40 cm of gravel, 54.18 t, and for a driveable yard with 55 cm, 74.50 t.

SIA 318 («Garten- und Landschaftsbau», JardinSuisse), completely revised on the basis of the CRB, was not consulted: these thicknesses are those of the specification, not verified.

2. How to calculate the tonnages of gravel, jointing sand, pedestals and geotextile?

Compacted 0/45 gravel = area × thickness × 2.15 t/m³ × 1.05; 4/8 chippings = area × thickness × 1.65 t/m³; geotextile = area × 1.15; excavation = area × total thickness (gravel + bedding + surfacing), bulked by 25%. For 60 m² of 2 cm slabs: 18.60 m³ excavation in place, i.e. 23.25 m³ bulked, 240 kg of jointing sand at 4 kg/m², 69.0 m² of geotextile. On pedestals, without bedding: 240 pedestals at 4.0 per m². A lawn requires 9.00 m³ of 15 cm topsoil, without gravel.

The densities, the 1.05 factor, bulking, geotextile, jointing sand (3 to 5 kg/m²) and pedestals (3.5 to 4.0 per m²) are those of the specification; the treatment of the lawn and of laying on pedestals is an assumption of the tool.

3. What minimum slope for a slabbed or paved terrace?

The specification asks for a drainage slope of at least 1.5%, from 1.5 to 2.5% (15 to 25 mm per metre), outwards and away from the façade, to avoid standing water and frost damage; 2.0% gives 20 mm per metre. Behind every retaining wall, drains and weep holes are needed.

A presentation by the Swiss paving association cites at least 1.5% (with drainage in the sub-layer), a technical document 2% (SIA 248) and 2.5% for textured surfaces: these figures are not verified in SIA 318. L-element retaining walls, rock revetments and the heights of fences and hedges fall under cantonal and municipal rules, which the tool does not price.

Indicative information drawn up from the tool's specification; it replaces neither the SIA 318 standard, nor the landscape contractor's advice, nor the cantonal and municipal rules.