Aller au contenu
Website
Pillar 516 tools 7 PDF

Engineering, Building Physics, PPE & Urban Planning

Areas and volumes, fees, overall budget, PPE, thermal, acoustics, earthquake resistance, accessibility, fire safety, urban planning, permits, subsidies, public land and safety: sixteen tools for construction and renovation projects.

The 16 tools of the pillar

Tool 5.1 Online

Areas & Volumes (SIA 416 / 380/1)

Calculate areas (SP, SBP, SN, SRE) and the built volume according to the SIA 416 standard.

SIA 416 · SIA 380/1
Tool 5.2 Online

Architect & Engineer Fees (SIA 102)

Break down architect and engineer fees by phase (31 to 53) according to the SIA 102 and 103 standards.

SIA 102 · SIA 103
Tool 5.3 Online

Overall Project Budget (CFC 0 to 9)

Estimate the overall budget of a project (CFC 0 to 9) and the secondary costs of CFC 5.

CFC 0 to 9
Tool 5.4 Online

PPE Condominium Renovation: Votes & Rents (OBLF)

Simulate the voting majorities for a renovation in PPE and the impact on rents under the OBLF.

Art. 647 CC · OBLF
Tool 5.5 Online

Thermal (U-value MoPEC) & Dew Point

Size the insulation thickness according to the required U-value (MoPEC) and check the condensation risk.

MoPEC · SIA 380/1 · SIA 180
Tool 5.6 Online

Acoustics (SIA 181) & Cercle Bruit Heat Pump (PAC)

Check the acoustic requirements of SIA 181 and simulate the noise circle (“cercle de bruit”) of a heat pump.

SIA 181
Tool 5.7 Online

Seismic Assessment (SIA 261 / 269/8)

Find the seismic zone of a municipality and the obligations when renovating (SIA 269/8).

SIA 261 · SIA 269/8
Tool 5.8 Online

Accessibility Configurator (PMR) 'Barrier-free'

View the mandatory dimensions of the SIA 500 standard: WCs, doors, corridors and ramps.

SIA 500
Tool 5.9 Online

Fire Protection (AEAI) & Snow Load SIA 261

Check the AEAI fire-resistance requirements (REI 30/60/90) and calculate the snow load by altitude.

AEAI · SIA 261
Tool 5.10 Online

Cantonal Laws & IBUS / IOS Indices

Convert the land-use indices (CUS/COS to IBUS/IOS) and compare the cantonal rules.

IBUS · IOS · CUS · COS
Tool 5.11 Online

Public Notice vs Permit Exemption

Answer in three clicks: building permit, public notice of the application or exemption, depending on your canton.

Building permit · Public notice of the application
Tool 5.12 Online

Radon Zones (300 Bq), Water Protection S1–S3 & Floods

Identify the constraints linked to radon, water protection zones (S1 to S3) and natural hazards.

ORaP · Water zones S1–S3
Tool 5.13 Online

'Buildings Programme 2026' Subsidies

Estimate the 2026 energy subsidies by canton: heat pump, insulation, CECB.

Buildings Programme · MoPEC
Tool 5.14 Online

Public Land Fees (Skips / Cranes)

Estimate the costs and time limits for occupying public land by city: skips, scaffolding, cranes.

Public land
Tool 5.15 Online

Price Index for the 26 Cantons & 40 Cities

Compare construction prices between the 26 cantons and 40 cities or resorts (ACIP index).

ACIP index
Tool 5.16 Online

SUVA / OTConst Safety Plan Generator

Generate the written site safety plan on a single page (Art. 4 OTConst, SUVA) in PDF format.

OTConst · SUVA

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.