Template Subcontracting Agreement for Swiss Construction (Word) & Due-Diligence Checklist (Art. 5 LDet / Art. 8b ODet)

Complete 7-page guide (PDF) and Word template. A subcontracting agreement and the list of supporting documents to demand before letting a subcontractor on site: duty of care, wage-compliance clause, payment retention and letters.

Interactive tool: three key subcontracting contract articles ready to insert

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

DOCXPDF

Subcontractors' Joint Liability Pack (LDet)

Complete 7-page guide (PDF) and Word template. A subcontracting agreement and the list of supporting documents to demand before letting a subcontractor on site: duty of care, wage-compliance clause, payment retention and letters.

  • Duty of care of the contracting contractor (Art. 5 LDét)
  • Checklist of supporting documents to require before the first day and due-diligence file to keep
  • Subcontracting agreement and template letters, evidence checklist, frequent mistakes, practical case and cases where a lawyer should be consulted

Editable Word template (.docx) · Printable PDF document

1. How to draft a « Back-to-Back » subcontracting agreement that protects the main contractor

A « back-to-back » contract passes on to the subcontractor the obligations that you yourself owe to the client. What can be enforced against you must be enforceable against him as well.

1.1 Aligning the subcontractor's acceptance, warranty periods (2 years / 5 years SIA 118) and warranty retention (10% / 5%) with those of the client

The subcontractor must bear the same warranty periods as you: a shorter period for him leaves you alone exposed. Align the warranty retention (10% up to 500'000 CHF, 5% beyond) and the balance, paid after acceptance by the site management.

1.2 Formally prohibiting cascade subcontracting without prior written authorisation

Prohibit second-tier subcontracting without prior written agreement, and require the subcontractor to pass on to its own subcontractors the same obligations: wage compliance, supporting documents, checks. Without this clause, you answer for a chain that you do not know.

2. Exempting yourself from joint liability (Art. 5 LDet): the checklist of the 8 mandatory certificates

The contracting contractor is civilly liable for its subcontractors' compliance with minimum wages and working conditions. It can exempt itself by proving its diligence.

2.1 The documents to archive before the first day on site (ISAB/SIPAC, old-age insurance (AVS), SUVA, occupational pension (LPP), FAR/RESOR, collective agreement compliance (CCT), withholding tax)

The documents on our checklist: joint-commission inspection certificate, AVS/AI/APG/AC (old-age, disability, loss-of-earnings and unemployment insurance) certificate less than 3 months old, SUVA premiums and daily allowances, occupational pension (LPP) and FAR/RESOR, extract from the debt-enforcement and commercial registers, as well as the documents specific to posting. Archive them before entry to the site.

2.2 Clause for automatic blocking of payment of progress statements if the quarterly certificates are not up to date

Provide that the documents are renewed every 3 months and that, failing this, you may withhold all or part of the down payments without interest or penalty. This contractual withholding is the sanction the law expects of your diligence.

3. Frequently asked questions about the subcontracting agreement in Switzerland (FAQ)

3.1 Is the « Pay-when-paid » clause (I pay the subcontractor only if the client pays me) risky in view of the statutory mortgage lien?

Yes: it makes the subcontractor bear the client's insolvency risk, which pushes him to register a statutory mortgage lien. It should be struck out or limited to a firm maximum payment period.

3.2 What penalties does the main contractor face for breach of the LDet duty of care (fine of 30'000 CHF and exclusion from public contracts)?

According to our sheets on Art. 9 LDet: a fine of up to 5'000 CHF or a ban of 1 to 5 years from tendering for the contracting contractor; the ceiling of 30'000 CHF targets the employer. The amounts are to be confirmed in the text in force.

3.3 What additional documents must be required from a European subcontractor posting workers for less than 90 days?

Notification of the posting to the authority at least 8 days before the start of the assignment (Art. 6 LDet), the social-insurance certificates of the country of origin (posting form) and proof of compliance with Swiss minimum wages.

Keywords covered: template subcontracting agreement construction Switzerland word · due-diligence checklist art 5 LDet art 8b ODet · mandatory documents subcontractor building Switzerland · ISAB SIPAC certificate joint commission collective agreement (CCT) · ban on chain subcontracting building · aligning subcontractor warranty retention SIA 118.

General information based on Swiss law in force — does not replace personalised legal advice.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.