Aller au contenu
Website
SIA 232/2 Tool 6.11 Online

Gutter, Rainwater Downpipe & Expansion Sizing Tool (SIA 232/2)

Sizing tool for gutter cross-sections, EP downpipes and expansion joints.

Interactive tool

Thresholds from the specification, not verified. Area per diameter (DN 80 to 150), distances between joints, galvanic matrix: SIA 232/2 not consulted. The gutter / downpipe pairing is an assumption of the tool. Expansion: the specification expresses α in “mm/(m·100K)”; the tool uses the physical values (16.5 µm/(m·K) for copper), otherwise the elongation would be ten times too large.

A Downpipes and gutters

m²

Flow, downpipe and gutter

Rainwater flow
Minimum downpipe diameter
Minimum girth of the half-round gutter

B Thermal expansion and metal compatibility

m
K

Elongation, joints and galvanic corrosion

Total thermal elongation
Expansion joints to be provided

Galvanic corrosion matrix (water running from the metal in the row onto the metal in the column)

Galvanic corrosion matrix between roofing metals

Elongation (mm) = α (µm/(m·K)) × length (m) × ΔT (K) / 1000. Rule of the trade: water that has run over copper must not run onto zinc, galvanised steel or aluminium.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.11"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standards SIA 232/2 and SN 592000: which downpipe diameter (DN 80, 100, 120) and which gutter girth should you choose per m2 of roof?

The sizing of gutters and rainwater downpipes to SIA 232/2 starts from the flow to be drained: plan area of the roof × rainfall intensity × runoff coefficient. At the standard intensity of 300 l/(s·ha) (0,03 l/(s·m²)), a 95 m² tiled roof produces 2,85 l/s. The downpipe diameter per m2 of roof in Switzerland is read from the thresholds in the specifications, to which the tool pairs a gutter girth of 250, 333 or 400 mm:

Maximum area per downpipe and associated gutter girth
DownpipeMaximum area (standard intensity)Corresponding flowAssociated half-round gutter
DN 8065 m²1,95 l/s250 mm (no. 25)
DN 100120 m²3,60 l/s333 mm (no. 33)
DN 120185 m²5,55 l/s400 mm (no. 40)
DN 150320 m²9,60 l/s400 mm gutter or box gutter, several downpipes

For a heavy storm or a gravel or green roof, the area is weighted by the intensity and the runoff coefficient: 95 m² of tiled roof in a heavy storm (400 l/(s·ha)) is equivalent to 127 m² at the standard intensity (DN 120), the same area in gravel (coefficient of 0,5) to 47,5 m² (DN 80). To size the drainage of a plot, see the drain pipe calculator.

Note on the text of the standard. The area thresholds per diameter (DN 80 to 150) are those of the specifications; SIA 232/2 and SN 592000 (paid) were not consulted. The specifications give the gutter girths (250, 333 and 400 mm) without a corresponding area: the pairing with downpipe diameters is an assumption of the tool. Sheet-metal workers also use manufacturers' tables, calculated on a different rainfall intensity: the project design prevails.

Thermal expansion of zinc-titanium, copper and aluminium: calculating the spacing of expansion joints

The thermal expansion of copper, zinc-titanium and stainless steel in sheet-metal work is significant on a long gutter: a metal that goes from −20 °C to +80 °C in the sun lengthens by 100 K × its coefficient. The elongation in mm is α (in µm per metre and per kelvin) × length (m) × temperature difference (K) / 1000. For 10 m and 100 K:

Expansion coefficient, elongation and joints by metal
Metalα (µm/(m·K))Elongation for 10 m and 100 KFor 25 m
Copper16,516,5 mm41,3 mm
Titanium zinc22,022,0 mm55,0 mm
Stainless steel16,016,0 mm40,0 mm
Aluminium24,024,0 mm60,0 mm

The expansion joint spacing used in the specifications is 10 to 12 m for hanging gutters and 6 to 8 m for recessed box gutters; the tool counts the joints on the shortest distance (i.e. 10 m and 6 m). ⚡ Price your sheet-metal work in Soumission

Note on the text of the standard. Deviation from the specifications: the specifications express the coefficient in «mm/(m·100K)» with 16,5 for copper. Applied as it stands, this value would give 165 mm for 10 m and 100 K, ten times too much. The expansion coefficient of copper is 16,5 micrometres per metre and per kelvin (1,65 mm per metre for 100 K, i.e. 16,5 mm for 10 m): the tool applies 16,5 / 22,0 / 16,0 / 24,0 µm/(m·K) for copper, zinc-titanium, stainless steel and aluminium. The joint spacings are those of the specifications, not verified in SIA 232/2 (not consulted).

Galvanic couple and electrolytic corrosion on the roof: strictly forbidden metal combinations

The electrolytic incompatibility of copper, zinc and aluminium does not come from direct contact but from the water: when rainwater runs over copper, it picks up copper ions; on zinc, galvanised steel or aluminium downstream, these ions are deposited and trigger rapid corrosion. The rule of the trade is therefore to forbid runoff from copper onto these metals:

Galvanic corrosion matrix: water running from the metal in the row onto the metal in the column
Water coming from ↓ / flowing onto →CopperTitanium zincStainless steelAluminiumGalvanised steel
Copper—ProhibitedPermittedProhibitedProhibited
Titanium zincPermitted—PermittedPermittedPermitted
Stainless steelPermittedPermitted—PermittedPermitted
AluminiumPermittedPermittedPermitted—Permitted
Galvanised steelPermittedPermittedPermittedPermitted—

The safest course is not to mix metals in the same runoff, or to lay the copper downstream of all the others.

Note on the text of the standard. The matrix follows the rule in the specifications: copper upstream of zinc, galvanised steel or aluminium is forbidden. The other combinations are marked «Allowed» on the basis of a general rule of the trade, not verified in SIA 232/2 (not consulted); stainless steel, lead and coatings (lacquering) are not treated in detail. The sheet-metal worker confirms the combinations for their site.

Frequently Asked Questions about Gutters, Downpipes and Expansion (FAQ)

1. Which rainwater downpipe diameter should I choose: DN 80, 100, 120 or 150?

The specifications set area thresholds per diameter, at the standard intensity of 300 l/(s·ha): DN 80 up to about 65 m², DN 100 up to 120 m², DN 120 up to 185 m² and DN 150 up to 320 m². For 95 m² of tiled roof, the flow is 2,85 l/s and the tool proposes a DN 100 downpipe with a gutter of 333 mm girth. For a heavy storm (400 l/(s·ha)) or a gravel or green roof, the area is weighted.

These thresholds are those of the specifications, not verified (SIA 232/2 and SN 592000 not consulted); the pairing between gutter girth and downpipe is an assumption of the tool.

2. How much do copper, zinc and stainless steel expand?

The elongation is the product of the expansion coefficient, the length and the temperature difference. For 10 m and a difference of 100 K (from −20 °C to +80 °C in the sun): copper 16,5 mm, zinc-titanium 22,0 mm, stainless steel 16,0 mm and aluminium 24,0 mm. The coefficients are 16,5, 22,0, 16,0 and 24,0 micrometres per metre and per kelvin.

The specifications express these coefficients in «mm/(m·100K)»: applied as they stand, they would give an elongation ten times too large; the tool uses the physical values. The joint spacings (10 to 12 m for a hanging gutter, 6 to 8 m for a recessed box gutter) are those of the specifications.

3. Which metals must never be combined on a roof?

Water that has run over copper must never then run onto zinc, galvanised steel or aluminium: the copper ions are deposited and quickly corrode the metal downstream; this is galvanic corrosion through an electrolytic couple. The reverse (zinc above copper) is allowed by the rule of the trade used by the tool.

The simplest course is not to mix metals in the same runoff, or to lay the copper downstream. The tool's matrix is a rule of the trade, to be confirmed with the sheet-metal worker and with SIA 232/2, which was not consulted.

Indicative information prepared from the tool's specifications; it replaces neither SIA 232/2 nor the sheet-metal worker's design.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.