SIA 253 / SIA 252 Tool 6.25 Online

Levelling Compound, Resilient Flooring (SIA 253), Resins (SIA 252) & BPA Slip Resistance Calculator

Checker for slip resistance (R9–R12), levelling and preparation by shot blasting/sanding.

Interactive tool

Consumption figures from the specifications, SIA 253 and SIA 252 not consulted. Primer (0,25 kg/m²), levelling compound (1,5 kg/m² per mm), adhesive (0,32), resin (1,45 kg/m² per mm), quartz (2,5) and substrate criteria (pull-off ≥ 1,5 N/mm², concrete moisture ≤ 4 %): specifications. The exact title of SIA 252 could not be found. Slip resistance: confirmed scales (bpa / bfu: GS 1 to 4 in shoes, GB 1 to 3 barefoot; DIN 51130: R9 to R13; DIN 51097: A, B, C); the R / GS equivalence in the specifications has not been verified. Resin thickness of systems 3 and 4: added parameter.

A Levelling, resilient flooring and resin: consumption

m²
mm
mm

Quantities

Bonding primer
Levelling compound
Dispersion adhesive
Two-component resin
Quartz sand

Levelling compound: 1,5 kg/m² per mm, in 25 kg bags. Adhesive of 0,32 kg/m² for PVC and linoleum; resin of 1,45 kg/m² per mm; quartz of 2,5 kg/m² for OS8 / OS11.

B Slip-resistance class and substrate check (SIA 252)

N/mm²
%

Slip-resistance class and substrate

Recommended class

Classes in the specifications: R9 (living areas), R10 (entrances, stairs, domestic kitchens, public toilets), R11 or R12 (ramps, workshops, laundries, catering kitchens), R12 / R13 (food industry, slaughterhouses). R / GS equivalences not verified.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.25"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 253 (resilient floors PVC, LVT, linoleum): why self-levelling compound (2 to 3 mm) is essential before bonding

The SIA 252 standard for industrial resin floors and SIA 253 for linoleum and PVC is divided as follows in the specifications: SIA 253 for resilient floors (PVC, vinyl, linoleum, LVT tiles) and SIA 252 for resins. A resilient floor is thin and follows the slightest defect in the substrate: an uneven screed or concrete shows through the covering, and every irregularity marks the floor. The 2 to 3 mm self-levelling compound makes the substrate flat, smooth and evenly absorbent before bonding; it is preceded by a bonding primer.

Note on the text of the standard. SIA 253 (2024 edition, «Floor coverings of wood, plastic, textile, linoleum, elastomers, laminates and cork») was not consulted; the consumption figures are those of the specifications. The title of SIA 252 could not be confirmed: the CRB catalogue mentions a chapter CAN 662 «Jointless floor coverings» without linking it to SIA 252. For the supporting screed, see the SIA 251 screed tool.

Formula for calculating the number of 25 kg bags of levelling compound (1,5 kg/m2 per mm of thickness)

The calculation of self-levelling compound bags per m2 and mm of thickness is: mass = area × 1,5 kg/m² × thickness in mm; number of bags = round up(mass / 25). For 120 m² at 3,0 mm: 540 kg, i.e. 22 bags of 25 kg.

Bags of levelling compound by thickness for 120 m²
Levelling thicknessConsumptionMass for 120 m²Bags of 25 kg
2,0 mm3,0 kg/m²360 kg15
3,0 mm4,5 kg/m²540 kg22
5,0 mm7,5 kg/m²900 kg36

The materials list for a resilient floor also includes the bonding primer (0,25 kg/m², 30 kg for 120 m²) and the dispersion adhesive for PVC or linoleum (0,32 kg/m², 38 kg). For bonded tiling, see the tiling tool.

Standard SIA 252 (synthetic resin coverings): shot blasting of concrete, pull-off test (≥ 1,5 N/mm2) and car park systems OS8 / OS11

The substrate preparation by shot blasting or diamond grinding, cohesion 1,5 N/mm2 is the condition for a resin covering to bond to concrete: shot blasting or diamond grinding removes the laitance, the weak surface layer of the concrete, and opens its porosity. The specifications then require a pull-off strength (tensile test) of at least 1,5 N/mm² and a residual moisture of the concrete of at most 4 %.

The car park protection system OS8 / OS11 in resin designates a non-slip resin covering, broadcast with quartz sand, for the floors of underground car parks. For 120 m², a 2,5 mm resin uses 435 kg of two-component resin (epoxy or polyurethane, 1,45 kg/m² per mm); as a thin 0,5 mm layer, 87 kg; a car park system adds 300 kg of quartz sand (2,5 kg/m²). For concrete quality and exposure classes, see the reinforced concrete tool.

Note on the text of the standard. The title of SIA 252 and its content were not confirmed (paid standard, not consulted): the pull-off strength of 1,5 N/mm², the moisture of 4 % and the consumption figures are those of the specifications. The designations OS 8 and OS 11 are those of car park protection systems in German practice; their Swiss equivalent was not verified. The resin thickness of a car park system is an added, editable parameter.

BPA and SUVA requirements for slip resistance in Switzerland: choosing between R9, R10, R11, R12 and the barefoot classes A, B, C

The anti-slip class R9 R10 R11 BPA SUVA measures the grip of a floor under a shoe: from R9 (the lowest requirement) to R13 (the highest), under standard DIN 51130, with classes A, B and C of standard DIN 51097 for wet barefoot areas. The Swiss accident prevention office (BPA, bfu in German) uses its own scale: GS 1 to GS 4 for shoes and GB 1 to GB 3 barefoot. Classes recommended by the specifications:

Recommended slip-resistance class by room
RoomClassSpecification scale (GS)Barefoot
Living room, offices, bedrooms, dry corridorsR9GS1—
Building entrancesR10GS2—
Interior stairsR10GS2—
Domestic kitchensR10GS2—
Public restroomsR10GS2—
Shower (barefoot)R10GS2Class B
Parking rampsR11 or R12GS3—
Mechanical workshopsR11 or R12GS3—
Shared laundry roomsR11 or R12GS3—
Catering kitchensR11 or R12GS3—
Food industryR12 / R13GS4—
SlaughterhousesR12 / R13GS4—

A transition between two classes should differ by only one class, for example from R12 to R11 but not from R12 to R10: this is the bfu recommendation cited by a Swiss hospital. After installation, slip resistance is checked by an on-site measurement according to the bfu list of requirements.

Note on the text of the standard. The scales (DIN 51130, DIN 51097, bfu GS and GB) are confirmed, but the equivalence between R and GS in the specifications (R9 = GS1, R10 = GS2…) is not verified: a Swiss hospital uses «GS1 or R10» as the interior minimum. «Class B» in showers is the DIN 51097 scale; that of the bfu is GB 1 to GB 3 (a hospital requires GB2 in patient shower cubicles). The Suva requirements per room were not consulted: for a workplace, check with the Suva and the bfu. ⚡ Price your resilient floors and resins in Soumission

Frequently Asked Questions about Resilient Floors, Resins and Slip Resistance (FAQ)

1. How many bags of levelling compound for 120 m² of self-levelling compound?

The levelling compound uses about 1,5 kg/m² per millimetre of thickness: 120 m² at 3,0 mm represent 540 kg, i.e. 22 bags of 25 kg. With the bonding primer (0,25 kg/m², 30 kg) and the dispersion adhesive for PVC or linoleum (0,32 kg/m², 38 kg), this is the materials list for a resilient floor.

The consumption figures are those of the specifications, not verified; the product data sheet prevails. Standard SIA 253 (2024 edition, paid) was not consulted.

2. Which anti-slip class (R9 to R13) should I choose for each room?

The specifications recommend R9 for living rooms, offices, bedrooms and dry corridors, R10 for building entrances, interior stairs, domestic kitchens and public toilets (barefoot class B in showers), R11 or R12 for car park ramps, workshops, shared laundries and catering kitchens, and R12 / R13 for the food industry and slaughterhouses.

The scales are confirmed: DIN 51130 (R9 to R13, shoes), DIN 51097 (A, B, C, barefoot) and, on the bpa (bfu) side, GS 1 to 4 for shoes and GB 1 to 3 barefoot. The R / GS equivalence in the specifications (R9 = GS1, R10 = GS2…) is not verified: a Swiss hospital uses «GS1 or R10» as the interior minimum. For a specific room, consult the bfu documentation.

3. What requirements apply to the concrete substrate for a resin (SIA 252) and what consumption?

The specifications require a pull-off strength of at least 1,5 N/mm² after shot blasting or diamond grinding, and a residual moisture of the concrete of at most 4 %. For 120 m², a 2,5 mm self-levelling resin uses 435 kg (1,45 kg/m² per mm); a car park system OS8 / OS11 adds 300 kg of quartz sand (2,5 kg/m²).

These values are those of the specifications. The exact title of standard SIA 252 could not be confirmed and it was not consulted; the resin thickness of a car park system is an added, editable parameter.

Indicative information prepared from the tool's specifications; it replaces neither standards SIA 253 and SIA 252, nor the bfu documentation, nor the data sheet of the covering manufacturer.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.