Aller au contenu
Website
SSIGE W3 / SN 592000 guidelines Tool 6.18 Online

SSIGE W3 Plumbing Calculator (LU Units, Peak Flow) & Anti-Legionella (SIA 385/1)

Calculator for connection units (LU), PE/multilayer diameters & legionella.

Interactive tool

Values from the specifications, SSIGE W3 and SIA 385/1 not consulted. 1 LU = 0,1 l/s and LU per fixture: specifications (a municipal source counts 4 LU for a bathtub: the LU are editable). The peak flow is a tool adjustment, Qd = 0,195 × ΣLU0,45, calibrated on the two points of the specifications (20 LU: 0,75 l/s; 30 LU: 0,90 l/s), at least equal to the flow of the largest fixture; the SSIGE W3 directive reads it from a diagram. Temperatures and the 3-litre rule: specifications.

A Connection units, peak flow and diameter of the main pipe

Connected sanitary fixtures
RoomNumberLU per fixture
Washbasin / hand basin LU
WC with cistern LU
Kitchen sink LU
Dishwasher LU
Standard shower LU
Household washing machine LU
Bathtub LU
Garden / garage tap LU

Hydraulics

Sum of loading units ΣLU
Probable peak flow Qd
Minimum diameter of the main pipe (v ≤ 2,0 m/s)

The smallest inside diameter that keeps the velocity at 2,0 m/s at most, for the peak flow. Wastewater drainage (SN 592000, discharge units DU): see the guide, not calculated by the tool.

B Legionella control (SIA 385/1) and the 3-litre rule

°C
°C
°C
°C
m

Legionella

    Maximum pipe length for 3 litres
    PipeVolume per metreMaximum length for 3 litres

    Volume = π × (inside diameter / 2)² × length. The specifications state 15,0 m for the Ø 20 × 2 pipe: the exact calculation gives 14,9 m, the value adopted.

    Embed this calculator on a website page

    Paste this code into the page, or write [outil code="6.18"] in the content of a page on the site.

    📄 File linked to this tool (free)

    Move from calculation to full management

    Keep your references at hand, then automate them in your quotes, bids and final statements.

    ⚡ Automate this calculation in our ERP / Soumission software (Trial)

    Technical reference guide

    SSIGE W3 guideline: table of Loading Units (LU) per fixture and calculation of peak flow with simultaneity

    The SSIGE W3 guideline loading unit LU plumbing of the Swiss Gas and Water Industry Association assigns each fixture a value in loading units (LU), proportional to its flow: 1 LU corresponds to 0,1 l/s. The table reproduces the values from the specifications:

    Loading units (LU) per sanitary fixture
    FixtureLUFlow rateDefault number
    Washbasin / hand basin1 LU0,1 l/s3
    WC with cistern1 LU0,1 l/s2
    Kitchen sink2 LU0,2 l/s1
    Dishwasher2 LU0,2 l/s1
    Standard shower2 LU0,2 l/s2
    Household washing machine2 LU0,2 l/s1
    Bathtub3 LU0,3 l/s1
    Garden / garage tap5 LU0,5 l/s1

    Fixtures are never all used at the same time: the calculation of peak flow for drinking water and multilayer PE pipe diameter therefore applies a simultaneity coefficient. The tool calculates the peak flow Qd = 0,195 × ΣLU0,45, at least equal to the flow of the largest fixture, then chooses the smallest inside diameter that keeps the velocity at 2,0 m/s at most. For the default list, ΣLU = 23, Qd = 0,80 l/s and the main pipe is DN 25 (Ø 32 × 3,0).

    Peak flow and diameter according to the sum of loading units
    ΣLUPeak flow QdVelocityMain pipe
    10 LU0,55 l/s1,75 m/sDN 20 (Ø 26 × 3,0)
    20 LU0,75 l/s1,41 m/sDN 25 (Ø 32 × 3,0)
    23 LU0,80 l/s1,51 m/sDN 25 (Ø 32 × 3,0)
    25 LU0,83 l/s1,56 m/sDN 25 (Ø 32 × 3,0)
    30 LU0,90 l/s1,70 m/sDN 25 (Ø 32 × 3,0)
    40 LU1,03 l/s1,93 m/sDN 25 (Ø 32 × 3,0)

    Note on the text of the standard. The SSIGE W3 guideline (paid) was not consulted: it gives the peak flow in a diagram, and the tool's formula is a fit calibrated on the two points in the specifications (20 LU: 0,75 l/s; 30 LU: 0,90 l/s). A municipal source counts 4 LU for a bath whereas the specifications count 3: the LU are editable in the tool. The specifications' default sum (25 LU) does not match the default list of fixtures (23 LU). The plumber or the engineering office confirms the sizing.

    Standard SIA 385/1 and fighting Legionella: the 60 °C / 55 °C / 50 °C rule and the mandatory 3-litre limit

    The standard SIA 385/1 hot water temperature Legionella 60°C 55°C fights the growth of the Legionella bacterium in domestic hot water. The specifications adopt four limits: at least 60 °C at the outlet of the water heater or storage tank, at least 55 °C on the whole circulation loop, at least 50 °C at the draw-off point (after 10 to 15 seconds of flow) and below 25 °C for cold water.

    The 3-litre rule hot water waiting time SIA 385/2 limits the volume of a branch pipe not kept at temperature, between the manifold (or the loop) and the tap, to 3,0 litres: the water stagnating in it warms up slowly and can harbour Legionella.

    What maximum length of multilayer pipe (Ø 16 mm or Ø 20 mm) between the floor manifold and the tap?

    Maximum length of final branch for 3,0 litres
    Multilayer pipeInternal diameterVolume per metreMaximum length for 3,0 litres
    Ø 16 × 2 mm12 mm0,113 l/m26,5 m
    Ø 20 × 2 mm16 mm0,201 l/m14,9 m

    The volume is the inside cross-section of the pipe multiplied by the length: a Ø 16 × 2 mm pipe holds 0,113 litre per metre, and 26,5 m of this pipe represents 3,0 litres. Beyond that, the branch pipe must be shortened, brought closer to the manifold or kept warm by a loop or electric trace heating.

    Note on the text of the standard. The specifications state a maximum length of 15,0 m for the Ø 20 × 2 mm pipe; the exact calculation of the volume (inside diameter of 16 mm) gives 14,9 m, the value adopted by the tool (15,0 m represents 3,02 litres, above the limit). The temperatures and the 3-litre limit are those of the specifications; standards SIA 385/1 and SIA 385/2 (paid) were not consulted. For the plumbing of your projects, try our Soumission software.

    Wastewater drainage according to standard SN 592000: discharge stacks (DN 100), primary ventilation and drainage diameters

    The wastewater drainage standard SN 592000 DU is the Swiss standard on drainage of buildings. It sizes drainage pipes with discharge units (DU), the equivalent of LU for wastewater: each fixture has a DU value, the sum gives the wastewater flow, and the diameter of the pipe depends on this flow and on its gradient.

    The specifications cite discharge stacks in DN 100, primary ventilation (the discharge stack extended above the roof, which lets air in and prevents the traps from being put under negative pressure) and drainage diameters. For burying external pipes, see the asphalt mix and sewer tool.

    Note on the text of the standard. The tool does not calculate wastewater drainage: no DU value or diameter is given, since standard SN 592000 (paid) was not consulted. The DN 100 for discharge stacks is that of the specifications. The plumber or the engineering office sizes the drainage according to the standard.

    Frequently Asked Questions about Plumbing, LU Units and Legionella (FAQ)

    1. What is a loading unit LU and how do you calculate the peak flow?

    A loading unit (LU) of the SSIGE W3 guideline is worth 0,1 l/s: a washbasin or a WC counts 1 LU, a sink, a dishwasher, a shower or a washing machine 2 LU, a bath 3 LU and a garden tap 5 LU (values from the specifications). The LU of the fixtures are added up: for 3 washbasins, 2 WC, 1 sink, 1 dishwasher, 2 showers, 1 washing machine, 1 bath and 1 garden tap, ΣLU = 23 and the largest fixture is worth 5 LU. The peak flow is lower than the sum of the flows, because the fixtures are not all used at the same time: the tool gives 0,80 l/s for this example, and the smallest diameter that keeps the velocity under 2,0 m/s is DN 25 (Ø 32 × 3,0).

    The peak flow is a fit by the tool, Qd = 0,195 × ΣLU^0,45, calibrated on the two points in the specifications (0,75 l/s for 20 LU, 0,90 l/s for 30 LU); the SSIGE W3 guideline, which reads it from a diagram, was not consulted. A municipal source counts 4 LU for a bath: the LU are editable.

    2. What temperatures to observe against Legionella in a hot water network?

    The specifications adopt, according to standard SIA 385/1 and the Federal Office of Public Health: at least 60 °C at the outlet of the water heater or storage tank, at least 55 °C on the whole circulation loop, at least 50 °C at the draw-off point (after 10 to 15 seconds of flow) and below 25 °C for cold water, to limit bacterial growth. The tool checks the four values entered and flags those outside the limits.

    These temperatures are those of the specifications; standard SIA 385/1 (paid) was not consulted. An installation that does not comply must be corrected with the plumber and the building operator.

    3. What maximum pipe length between the floor manifold and the tap to stay under 3 litres?

    The 3-litre rule limits the volume of water held in a branch pipe not kept at temperature. The volume is the inside cross-section multiplied by the length: a Ø 16 × 2 mm multilayer pipe (inside 12 mm) holds 0,113 l/m, hence a maximum length of 26,5 m; a Ø 20 × 2 mm pipe (inside 16 mm) holds 0,201 l/m, hence 14,9 m. A Ø 16 pipe of 12 m holds 1,36 litres.

    The specifications state 15,0 m for the Ø 20 × 2 pipe: the exact calculation of the volume gives 14,9 m, the value adopted by the tool. The inside diameters are those of usual multilayer pipes; the 3-litre limit is that of the specifications (SIA 385/1 and 385/2, not consulted).

    Indicative information prepared from the tool's specifications; it replaces neither the SSIGE W3 guideline, nor standards SIA 385/1 and 385/2, nor standard SN 592000, nor the plumber's calculation.

    📥 Ready-to-use pack · free

    Download the document

    The file is displayed on screen right away and we also send it to you by e-mail.

    Your address is used to send you this file. See our privacy policy.