Painting Measurement Calculator, Opening Deduction & Consumption (SIA 257)
Painting area calculator (opening deduction rules SIA 118/257) & abrasion classes.
Interactive tool
Values from the specifications, SIA 257 and SIA 118/257 not consulted. Consumption per coat (0,14 / 0,18 / 0,20 / 0,11 L/m²), losses of 5 % and opening deduction threshold (2,50 or 4,00 m²): specifications, not verified (the 2,5 m² threshold found in German DIN 18363 proves nothing for Switzerland). The “CAN 671” of the specifications is the CRB chapter “Plastering: renders and staff”: interior painting is in CAN 675 and exterior painting in CAN 676. Assumption of the tool: primer coat at 0,10 L/m² (editable). Wet-abrasion classes of EN 13300: confirmed.
A Measurement: net area and billable area
Physical net area and measured area
- Physical net area to be painted
- Billable measured area
- Difference due to reveals
Physical net area: walls − all openings + ceilings. Take-off area: only openings larger than the threshold are deducted. CAN 675 (2023) describes reveals and lintels separately, per linear metre (cf. SIA 118/257).
B Paint quantities: primer and two finishing coats
Litres to order (5 % losses with roller or airless included)
- Primer coat or fixative
- Finish paint, 2 coats
- Tins
The litres are calculated on the physical net area; billing is done on the take-off area. Product data sheet: the only reference for actual consumption.
C Wet abrasion resistance (SN EN 13300)
Class EN 13300
- Target class
Class 1: less than 5 µm of wear after 200 cycles; class 2: from 5 to less than 20 µm; class 3: from 20 to less than 70 µm (test EN ISO 11998). Classes 4 and 5 are judged after 40 cycles.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.26"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
SIA 257 standard and CAN 671: how does the deduction rule for windows and doors work in a painting take-off?
The painting take-off rule deduction windows doors SIA 257 decides which area the painter bills: the one actually painted, or that of the solid wall less only the large openings. The SIA 257 standard "Painting and wall coverings" sets the requirements for the work; its general conditions, SIA 118/257, govern the services included and the take-off. CAN 675 of the CRB ("Interior painting, wall coverings", 2023 edition) states that these take-off rules have changed considerably with SIA 118/257: the deduction threshold must therefore be checked in the edition in force on the date of the tender.
With the specification's threshold (2.50 m²), an opening is deducted only if it is larger than this threshold. For 180 m² of walls and 65 m² of ceilings, with 4 windows of 1.80 m² and 2 French doors of 4.80 m²:
| Deduction threshold | Openings deducted | Openings not deducted | Measured area | Area actually painted |
|---|---|---|---|---|
| 0,00 m² | 16,80 m² | 0,00 m² | 228,20 m² | 228,20 m² |
| 2,50 m² | 9,60 m² | 7,20 m² | 235,40 m² | 228,20 m² |
| 4,00 m² | 9,60 m² | 7,20 m² | 235,40 m² | 228,20 m² |
| 5,00 m² | 0,00 m² | 16,80 m² | 245,00 m² | 228,20 m² |
Clarification on the text of the standard. The title of this section and the associated keyword quote "CAN 671": in the CRB catalogue, chapter 671 is "Plastering: renders and staff". Interior painting is at CAN 675 and exterior painting at CAN 676, which take up SIA 257 and SIA 118/257. These (paid) standards were not consulted: the threshold of 2.50 or 4.00 m² comes from the specification and could not be verified (2.5 m² is found in the German rule DIN 18363, which does not apply in Switzerland). The title and keyword remain as requested. For partitions and ceilings to be painted, see the drywall tool.
Why small openings are not deducted when the painter does the reveals and returns
Painting a window means treating its reveals, returns and lintel: these surfaces are added to the area of the solid wall and do not appear in the take-off of the wall. By not deducting small openings, the take-off compensates for this work without counting it a second time. The billing reveals painting CAN 671 in the specification follows this principle; CAN 675 goes further and describes reveals and lintels in separate items, per linear metre (cf. SIA 118/257), so that the exact rule depends on the bill of quantities.
In the example, the 4 windows of 1.80 m² are not deducted: the take-off area exceeds the area actually painted by 7.20 m² (235.40 m² against 228.20 m²). The two French doors of 4.80 m², larger than the threshold, are deducted.
Calculating the exact number of litres of paint per m2: primer coat (fixative) and 2 finishing coats
The calculation paint quantity litres per m2 two coats is: litres of finish = area actually painted × consumption per coat × 2 coats × 1.05 (5 % losses with roller or airless); litres of primer = area × primer consumption × 1.05; number of cans = ceiling(litres / capacity). The litres are calculated on the area actually painted, billing on the take-off area. For 228.20 m²:
| Paint | Consumption per coat | Finish, 2 coats | 10 L tins | 15 L tins |
|---|---|---|---|---|
| Interior matt or satin acrylic dispersion (about 0.14 L/m² per coat, that is 7 m²/L) | 0,14 L/m² | 67,1 L | 7 | 5 |
| Silicate or lime mineral paint (about 0.18 L/m² per coat) | 0,18 L/m² | 86,3 L | 9 | 6 |
| Exterior siloxane façade paint (about 0.20 L/m² per coat) | 0,20 L/m² | 95,8 L | 10 | 7 |
| Polyurethane enamel for woodwork and metal (about 0.11 L/m² per coat) | 0,11 L/m² | 52,7 L | 6 | 4 |
With the standard system (one primer or undercoat and two finishing coats), the primer coat adds 24.0 L at 0.10 L/m²; two direct refresh coats do away with the primer. For a floor to be painted or a wall to be renovated after a floor has been laid, see the soft flooring and resins tool.
Clarification on the values. The consumption per coat (0.14 / 0.18 / 0.20 / 0.11 L/m²) and the 5 % losses are those of the specification. It does not give the consumption of the primer coat or fixative: 0.10 L/m² is an assumption of the tool, editable. The product data sheet gives the actual consumption, which depends on the substrate.
SN EN 13300 standard: choosing between Class 1 (scrub-resistant), Class 2 (washable) and silicate mineral paint
The wet abrasion resistance class EN 13300 class 1 and 2 measures the thickness of paint worn away after 200 cycles of wet scrubbing (test EN ISO 11998). The lower the class, the better the paint withstands washing:
| Class | Wear after 200 cycles | Use |
|---|---|---|
| Class 1 | less than 5 µm of wear after 200 cycles | intensively scrubbable: kitchens, corridors, schools, hospitals |
| Class 2 | from 5 to less than 20 µm of wear after 200 cycles | washable: living rooms, bedrooms |
| Class 3 | from 20 to less than 70 µm of wear after 200 cycles | wipeable: dry ceilings |
Classes 4 and 5 are judged only after 40 cycles and are not offered by the tool. The dispersion paint vs silicate mineral interior wall is chosen on criteria other than washability: an acrylic dispersion (about 0.14 L/m² per coat) is read from the manufacturer's class, whereas a silicate or lime mineral paint (about 0.18 L/m² per coat) suits a mineral substrate and is chosen for its appearance and its vapour permeability (general trade principle, not taken from the standard); its wet abrasion class should be requested from the manufacturer.
Clarification on the text of the standard. The thresholds of 5, 20 and 70 µm are confirmed by a paint manufacturer. CAN 675 cites SN EN 13300 ("Paints and varnishes – Water-borne coating materials and coating systems for interior walls and ceilings – Classification"); the current status of this standard could not be confirmed (DIN indicates the 2001 edition as withdrawn). The class is read from the product's data sheet. To scaffold a façade before painting, see the scaffolding tool. ⚡ Price your painting work in Soumission
Frequently Asked Questions on Painting Take-off, Consumption and Wet Abrasion (FAQ)
1. How does the deduction rule for windows and doors work in a painting take-off?
In the example of 180 m² of walls and 65 m² of ceilings, with 4 windows of 1.80 m² and 2 French doors of 4.80 m², the area actually painted is 228.20 m² (all openings deducted). With a deduction threshold of 2.50 m², the windows of 1.80 m² are not deducted but the French doors of 4.80 m² are: the billable take-off area is 235.40 m², that is 7.20 m² more than the area actually painted, in compensation for the reveals, returns and lintels that the painter treats. With a threshold of 4.00 m², the result is 235.40 m².
CAN 675 ("Interior painting, wall coverings", 2023 edition) states that reveals and lintels are described separately, per linear metre, according to SIA 118/257, whose take-off rules have changed: consult this standard for the exact threshold. The threshold of 2.50 or 4.00 m² comes from the specification and could not be verified. The "CAN 671" cited by the specification is actually the chapter "Plastering: renders and staff" of the CRB: painting is at CAN 675 (interior) and CAN 676 (exterior).
2. How many litres of paint are needed per m² for a primer coat and two finishing coats?
For 228.20 m² to be painted, an acrylic dispersion at 0.14 L/m² per coat requires 67.1 L of finish for 2 coats, 5 % losses included, that is 7 cans of 10 L (70 L) or 5 cans of 15 L (75 L), and 24.0 L of primer coat or fixative at 0.10 L/m². A silicate or lime mineral paint (0.18 L/m²) requires 86.3 L of finish; two direct refresh coats, without primer, reduce the total to 67.1 L. The litres are calculated on the area actually painted, not on the take-off area.
The consumption per coat (0.14 / 0.18 / 0.20 / 0.11 L/m²) and the 5 % losses are those of the specification; the consumption of the primer coat is not given there: 0.10 L/m² is an assumption of the tool, editable. The product data sheet prevails.
3. What do classes 1, 2 and 3 of the EN 13300 standard mean for wet abrasion resistance?
Wet abrasion resistance measures the thickness of paint worn away by repeated wet rubbing: Class 1 (less than 5 µm of wear after 200 cycles) for a paint that withstands intensive scrubbing: kitchens, corridors, schools, hospitals; Class 2 (from 5 to less than 20 µm of wear after 200 cycles) for a washable paint: living rooms, bedrooms; Class 3 (from 20 to less than 70 µm of wear after 200 cycles) for a wipeable paint: dry ceilings. Classes 4 and 5 are judged only after 40 cycles. The class is read from each product's data sheet; a silicate or lime mineral paint is generally chosen for reasons other than washing (general trade principle, not taken from the standard), and its class should be requested from the manufacturer.
The thresholds of 5, 20 and 70 µm are confirmed by a paint manufacturer; the test method is EN ISO 11998. CAN 675 cites EN 13300; its current status could not be confirmed (DIN indicates the 2001 edition as withdrawn). The SIA 257 standard "Painting and wall coverings" was not consulted.
Indicative information based on the tool's specification; it does not replace the SIA 257 and SIA 118/257 standards, CAN 675 and 676, or the paint product's data sheet.