Aller au contenu
Website
ORP · G/B/L permits Tool 2.6 Online

ORP Reporting Obligation Checker (5% Threshold), Cross-Border Permits (G/B/L) & 90-Day Rule (2026)

Check the obligation to report a vacancy to the ORP (regional employment office), the type of permit (G, B, L) and the 90-day rule.

Interactive tool

3 Candidate profile

Legal hiring calendar

Withholding-tax rule of the chosen canton

The 1983 France–Switzerland agreement concerns cross-border workers living in France; for Italy and Germany, taxation follows other rules: ask the cantonal tax authority.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="2.6"] in the content of a page on the site.

📄 Files and templates linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

2026 list of building trades subject to the obligation to report vacancies to the ORP (Art. 21a LEI — 5 % threshold)

The obligation to report vacancy ORP building trades 2026 concerns the occupational groups whose unemployment rate reaches 5 %. In construction, eight groups are subject and six are exempt. The list of occupations unemployment rate 5% SECO construction is that of the ACIP 2026 reference; it is updated every year: check it before publishing a job ad.

1. Bricklayers, labourers, painters, plasterers, site assistants, scaffolders and machine operators: status by CNP code

Building trades subject to or exempt from the ORP reporting obligation, by CNP code
Trade to recruitCNP codeStatus (5% threshold)
Bricklayers & road buildersCNP 7112 / 7119SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Labourers & Site assistants building / civil engineeringCNP 9312 / 9313SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Building painters & varnishersCNP 7131SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Plasterers, façade builders & drywallersCNP 7123SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
ScaffoldersCNP 7119SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Insulators & waterproofersCNP 7124SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Floor layers & tilersCNP 7122SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Construction machine operators and crane operatorsCNP 8342SUBJECT: unemployment ≥ 5 %, 5 working days of exclusivity on Job-Room
Electrical installers CFC & telematics techniciansCNP 7411EXEMPT: unemployment < 5 %, free publication immediately
Heating, ventilation & air-conditioning installers CVCCNP 7127EXEMPT: unemployment < 5 %, free publication immediately
Plumbers & sheet-metal workers CFCCNP 7126EXEMPT: unemployment < 5 %, free publication immediately
Carpenters CFC & joiners-cabinetmakersCNP 7115 / 7522EXEMPT: unemployment < 5 %, free publication immediately
Locksmiths & metal fabricators CFCCNP 7214EXEMPT: unemployment < 5 %, free publication immediately
Site managers, ES technicians & architectsCNP 1323 / 3112EXEMPT: unemployment < 5 %, free publication immediately

2. The strict rule of 5 working days of exclusivity on Job-Room (ban on publishing on LinkedIn, Indeed or Facebook before the end of the period!) and the legal exceptions

For a trade that is subject, the vacancy must first be reported to the ORP on Job-Room. The exclusivity period 5 working days Job-Room forbids any publication elsewhere (LinkedIn, Indeed, Facebook, the company's website, press) before the end of the period. Example: a notice made on Monday 15 March 2027 reserves the vacancy until Monday 22 March 2027; publication is free from Tuesday 23 March 2027 (Monday to Friday, public holidays not deducted).

Failure to comply is penalised: the fine 40000 CHF art 117a LEI can reach 40'000 CHF. The legal exceptions are hiring a person already registered with the ORP and internal promotion. For an exempt trade (unemployment below 5 %), publication is free immediately.

Practical guide to work permits in construction: G Permit (Cross-border worker), B Permit, L Permit and the 90-Day Notification

The permit depends on the candidate's profile: resident in Switzerland (C or B permit), cross-border worker (G permit), new EU/EFTA (UE/AELE) arrival (B or L permit) or posted worker for a service of less than 90 days a year. The checker above shows, for each profile, the formalities and the withholding-tax rule.

1. Hiring a cross-border worker (G Permit EU/EFTA (UE/AELE)): conditions, weekly return and health insurance LAMal vs CMU

To hire cross-border worker G permit Swiss construction, the employer hires an EU/EFTA (UE/AELE) national living abroad: the cross-border worker returns home every week and their health insurance falls under the LAMal or the CMU. Trades subject to the ORP reporting obligation remain so for a cross-border worker: the vacancy is first reported on Job-Room. For tax, everything depends on the company's canton (see below). A B permit (residence permit) or L permit (short-term residence) concerns, by contrast, the new arrival settling in Switzerland: check their residence and work permit before hiring.

2. The online notification procedure (8 days in advance!) for cross-border services of less than 90 days a year

The 90-day notification procedure posted workers applies to foreign companies that send staff to carry out a service in Switzerland for less than 90 days a year: the notification is made online, 8 days in advance, before the work starts.

Withholding Tax Scales by Canton (Scales A, B, C, H and the France–Switzerland cross-border worker agreement)

The employer withholds tax at source from the salary of foreign workers subject to this regime, according to a scale that depends on family situation: A for a single person without children, B for a married couple with a single income, C for a married couple in which both spouses work, H for a single person with children (single-parent family).

1. Major difference between Geneva (withholding tax for all cross-border workers) and the 8 cantons of the 1983 France–Switzerland tax agreement (Vaud, Valais, Neuchâtel, Jura, Bern, Basel, Solothurn)

For the withholding tax Vaud Geneva Valais, the difference comes from the 1983 France–Switzerland agreement. In Geneva, the employer withholds tax at source on 100 % of cross-border workers (scales A, B, C, H). In the 8 cantons of the agreement, there is no withholding if the cross-border worker hands over their certificate of French tax residence (form 2041-AS) and returns home every day, with attention to the ceiling on remote work and on assignments outside Switzerland.

Withholding tax regime of French cross-border workers by canton
Canton of the companyRules for a cross-border commuter residing in France
Geneva (GE)Withholding at source by the employer on 100 % of cross-border workers (scales A, B, C, H).
Vaud, Valais, Neuchâtel, Jura, Bern, Basel-Stadt, Basel-Landschaft, Solothurn1983 France–Switzerland agreement: no withholding if the certificate of French tax residence (form 2041-AS) is handed over and if the cross-border worker returns home every day; otherwise, withholding at source in Switzerland.
Fribourg (FR) and the other cantons (16 others)Outside the agreement: tax withheld at source in Switzerland.

The 1983 agreement concerns cross-border workers living in France; for Italy and Germany, taxation follows other rules. Residents holding a B or L permit are generally subject to withholding tax according to the canton's scales A, B, C, H. Ask the cantonal tax authority.

Frequently Asked Questions on Foreign Recruitment and ORP / SECO Inspections (FAQ)

1. Which building trades are subject to the obligation to report vacancies to the ORP in 2026?

The occupational groups whose unemployment rate reaches 5 % are subject: Bricklayers & Road builders; Labourers & Site assistants building / civil engineering; Painters & varnishers; Plasterers, facade workers & plasterboard fitters; Scaffolders; Insulators & waterproofers; Floor layers & tilers; Construction machine operators and crane operators. The following are exempt (rate below 5 %): Electrical installers CFC & telematics technicians; Heating, ventilation & air-conditioning installers HVAC (CVC); Plumbers & sheet-metal workers CFC; Carpenters CFC & joiners-cabinetmakers; Metalworkers & steel fabricators CFC; Site managers, ES technicians (ES) & architects.

The list is that of the ACIP 2026 reference; it is updated every year: check it before publishing a job ad.

2. What does an employer risk by publishing a job ad before the end of the exclusivity period?

For a trade that is subject, the vacancy must first be reported on Job-Room and remain reserved for 5 working days: no publication on LinkedIn, Indeed or Facebook before the end of the period. In the event of non-compliance, the fine can reach 40'000 CHF (art. 117a LEI). Hiring a person already registered with the ORP and internal promotion are excepted.

3. Must I withhold tax at source from a French cross-border worker?

It depends on the canton. In Geneva, the employer withholds tax at source on 100 % of cross-border workers (scales A, B, C, H). In the cantons of the 1983 France–Switzerland agreement (Vaud, Valais, Neuchâtel, Jura, Bern, Basel-Stadt, Basel-Landschaft and Solothurn), there is no withholding if the cross-border worker hands over their certificate of French tax residence (form 2041-AS) and returns home every day. In Fribourg, and without a certificate, tax at source is withheld in Switzerland.

4. How do I notify a service of less than 90 days in Switzerland?

A company that posts workers to Switzerland for less than 90 days a year must make the notification online 8 days in advance, before the start of the service.

Source: ACIP 2026 reference. Trade lists, deadlines and scales are updated every year: indicative information, which replaces neither the SECO guidelines nor the opinion of your cantonal office.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.