Public land Tool 5.14 Online

Calculator for Costs and Time Limits of Public Land Occupation by City (Skips / Scaffolding)

Estimate the costs and time limits for occupying public land by city: skips, scaffolding, cranes.

Interactive tool

Editable rates. Each municipality applies its own fee regulation. The three profiles start from the range of the City of Genève (3 to 5 CHF per m² per week): replace them with the rate of your municipality.

A Occupation of the roadway

m²
days
spaces
CHF

7 Municipal rates (editable)

CHF
CHF
CHF

Public land budget

Rate applied
Occupation fee (area × days × rate)
Fee for neutralising parking spaces
Authorisation fee and signage
Total budget to re-invoice in the site setup
Average cost per day of occupation

    Occupation fee = area × days × weekly rate / 7. The profiles, the ceiling of 20 CHF per m² per month (Geneva), the area of 12,5 m² for a parking space and the passage widths are indicative or come from the specifications: the municipal regulation prevails.

    Embed this calculator on a website page

    Paste this code into the page, or write [outil code="5.14"] in the content of a page on the site.

    📄 File linked to this tool (free)

    Move from calculation to full management

    Keep your references at hand, then automate them in your quotes, bids and final statements.

    ⚡ Automate this calculation in our ERP / Soumission software (Trial)

    Technical reference guide

    Why public land occupation fees (pavement and parking spaces) eat into the margin of urban building sites

    Scaffolding, a skip or a crane on the pavement or the carriageway occupies public land: the municipality requires a permit and a fee. The site public land occupation fee per m2 per day looks modest per square metre, but it is multiplied by the area and the duration, and added to the parking spaces taken out of use and to the administrative fees. The City of Geneva, for example, charges site installations 3 to 5 CHF per m² per week, with a ceiling of 20 CHF per month, and an administrative fee of 60 to 500 CHF depending on the complexity of the file. On the site in the tool's example (22,5 m² for 30 days, 2 parking spaces, fee of 150 CHF), the budget reaches 1'135.80 CHF; for an occupation of 90 days without a ceiling, the occupation alone rises to 1'446.43 CHF.

    How to price and re-invoice the occupation by scaffolding or a skip in the initial quote

    The permit and rate for placing a skip or scaffolding on the pavement in Lausanne or Geneva is priced with the tool's formula: occupation fee = area × days × rate, plus the suspension of parking spaces and the fixed fee. In Geneva, stopping on a parking space is considered an occupation of public land and is charged by area; the tool counts a parking space of 12,5 m² (2,5 m × 5 m) at the same rate. The tool's three municipality profiles start from the Geneva range:

    Budget of the example site according to the municipality's rate profile
    ProfileRate (CHF per m² per week)OccupationParking spacesTotal with fee
    Large city / Dense urban centre (e.g. Geneva, Lausanne, Zurich: high rate)5,00450.00 CHF535.80 CHF1'135.80 CHF
    Medium-sized town / Cantonal capital (e.g. Sion, Fribourg, Neuchâtel, Montreux, Yverdon)4,00385.71 CHF428.40 CHF964.11 CHF
    Outlying municipality / village (moderate rate)3,00289.29 CHF321.60 CHF760.89 CHF

    Re-invoice this amount in the site setup item of the quote: the specifications' allocation is «CFC 211.1 / ACIP chapter 01». In the hub's register, facade scaffolding falls under CFC 211.1, whereas general site installations fall under CFC 113 and 211.0 (ACIP chapter 01). To include it in the project budget, see the overall budget calculator CFC 0 to 9.

    Note on the text of the standard. Only the range of the City of Geneva is verified (3 to 5 CHF per m² per week, ceiling of 20 CHF per month). The medium-sized town (4 CHF) and outlying municipality (3 CHF) profiles are an assumption of the tool, which you replace with your municipality's regulation; the rates of Lausanne, Sion and Fribourg could not be found.

    Road and pedestrian safety rules (OSR / SIA 500): clear width of 1,20 m to 1,50 m, pedestrian tunnel and lit beacons

    The site signage OSR on public land falls under the Road Signs Ordinance (OSR) and the municipality's police regulation. The pavement must remain passable: the tool's specifications assume a clear passage for pedestrians of at least 1,20 m to 1,50 m, according to SIA 500 (barrier-free construction) and police regulations. Where the scaffolding or the hoarding does not leave this width, a secured and lit pedestrian tunnel must be created, with lit beacons at night and diversion signage for people with reduced mobility. For passage dimensions, see the SIA 500 standard configurator (120 cm corridors, ramps and thresholds).

    The widths of 1,20 m to 1,50 m are those of the specifications and have not been verified in the municipal regulations: the municipality's permit sets the exact width, the beacons and the type of protection.

    Deadlines for applying for a permit from the municipality and installing the «No stopping» signs (72 h in advance)

    The deadline for an excavation permit application in a Swiss municipality and that of the occupation permit are counted in working days: the tool's specifications recommend submitting the application 10 to 15 working days before installation. In Geneva, since 1 January 2023, the City treats stopping on a parking space as an occupation of public land and has cut from 15 to 10 days the deadline for reserving a parking space for removals and works. «No parking» signs are put up 72 hours in advance, so that vehicles have time to leave; without this lead time, parked vehicles block the installation and the company bears the cost of a failed installation.

    Also allow for the excavation permit if the site affects the carriageway or the utility networks, and for coordination with the utility companies. The deadlines of 10 to 15 working days are indicative: each municipality has its own procedure. ⚡ Price your site setups in Soumission

    Frequently Asked Questions about Public Land Occupation, Skips and Scaffolding (FAQ)

    1. What is the deadline for applying for permission to place a skip?

    Allow 10 to 15 working days before installation, according to the tool's specifications. In Geneva, the City has cut from 15 to 10 days the deadline for reserving parking spaces. Stopping on a parking space is considered there an occupation of public land subject to a permit and a fee.

    Each municipality has its own procedure: submit the application as soon as the installation date is known and allow for the no-parking signs put up 72 h in advance.

    2. What minimum passage width must be kept for pedestrians along scaffolding?

    The tool's specifications assume a clear passage of at least 1,20 m to 1,50 m on the pavement, according to SIA 500 and police regulations, or the creation of a secured and lit pedestrian tunnel when this passage cannot be maintained.

    These values have not been verified in the standard or in the municipal regulations: the municipality's permit sets the exact width and the lit beacons.

    3. Who pays the public land occupation fee, the client or the tradesperson?

    The municipality generally bills the holder of the permit, that is, the company occupying the public land. Depending on the contract, it includes this fee in its site setup price or re-invoices it to the client: set this in writing in the quote. Example from the tool (large city profile, 22,5 m² for 30 days, 2 parking spaces, fee of 150 CHF): 1'135.80 CHF, of which 450.00 CHF is occupation.

    In Geneva, the City applies 3 to 5 CHF per m² per week with a ceiling of 20 CHF per month and a fee of 60 to 500 CHF; the tool's three profiles (5, 4 and 3 CHF per m² per week) are an assumption based on it, to be replaced by your municipality's regulation.

    Indicative information prepared from the City of Geneva's rates and the tool's specifications; it does not replace your municipality's tariff regulation.

    📥 Ready-to-use pack · free

    Download the document

    The file is displayed on screen right away and we also send it to you by e-mail.

    Your address is used to send you this file. See our privacy policy.