Aller au contenu
Website
Format: PDF / XLSX Standard: PDF · Excel · Buildings Programme DOC 27

Guide to the « Buildings Programme 2026 » Subsidies by Canton & Financial Annex Template for Client Quotes

The indicative amounts by canton and the sheet to attach to the client's quote.

Interactive tool: real net cost after subsidy and taxes to attach to the offer

Loading the tool…

📄 The « Brut de chantier » pack to download (free)

PDFXLSX

Guide to « Buildings Programme » Subsidies by Canton & Quote Annex

The indicative amounts by canton and the sheet to attach to the client's quote.

  • Insulation measures, heat pump, geothermal energy
  • The 3 golden rules for not losing the subsidy
  • Aid sheet to attach to the quote

Printable PDF document · Excel workbook (.xlsx) with formulas

1. Summary table of 2026 financial aid by canton (Measures M-01 to M-19: insulation, windows, heat pump (PAC), CECB Plus)

Aid varies from one canton to another and changes every year. Only the 2026 Vaud scale was re-read in the cantonal text; the others are indicative.

1.1 Amounts per m² for thermal insulation of the facade and roof (40 to 100 CHF/m² depending on the U-value achieved) and heating lump sums

In the 2026 Vaud example: 40 CHF/m² for U ≤ 0.20 W/m²K, 70 CHF/m² for U ≤ 0.15 W/m²K, 100 CHF/m² with photovoltaics; air/water heat pump 5'000 CHF, geothermal energy 20'000 CHF, wood heating and district heating with degressive lump sums. Check your canton's scale before announcing it.

1.2 The winning combination for the owner: direct cantonal subsidy + full tax deduction of energy-saving works

The subsidy reduces the net cost, and the costs borne after the subsidy are deductible from taxable income under tax law (RS 642.116). The tax gain is calculated on the amount after the subsidy, at the owner's marginal rate.

2. The 3 administrative golden rules that prevent the subsidy payment being refused

A subsidy is rarely lost on substance, almost always on form: three rules are enough to avoid it.

2.1 Absolute prohibition on starting the works (and in several cantons on signing the firm order) before the canton's written approval

Never start the works before the canton's written approval; in many cantons, even the firm order or the down payment before approval forfeits the right to the subsidy. Put a condition precedent in the quote.

2.2 Mandatory photo file « Before / During (insulation thickness measured with a tape) / After »

Take dated photos before the works, during installation (with the insulation thickness measured with a tape) and after completion. Without these photos, an inspection may refuse payment; also keep the technical data sheets and the invoices for the materials.

3. Frequently asked questions about Buildings Programme subsidies in Switzerland (FAQ)

3.1 In which case is a prior CECB Plus energy audit mandatory (above 10'000 CHF of subsidy)?

In several cantons (Vaud, Fribourg, Valais, Neuchâtel), a CECB Plus is required from a subsidy amount of about 10'000 CHF, according to our checks. Check the condition in your canton's programme before submitting the application.

3.2 Can the owner deduct the whole invoice from taxes or only the net share after the subsidy?

Only the share borne by the owner after the subsidy is deductible. If the subsidy covers 12'000 CHF of a 45'000 CHF invoice, the deduction applies to 33'000 CHF, at the taxpayer's marginal tax rate.

3.3 How to use the subsidy financial annex sheet to sign your quotes 2 times faster against competitors?

The annex sheet shows the gross cost, the estimated subsidy, the tax saving and the net cost for the client. A client who sees his real net cost decides faster: « 2 times faster » is a commercial ambition, not a guaranteed result.

Keywords covered: scale subsidies buildings programme 2026 pdf · subsidy amount insulation facade roof m2 vaud geneva valais · heat pump subsidy air-water geothermal 2026 · tax deduction energy renovation works Switzerland · rule submitting subsidy application before works photos · sales pitch energy renovation craftsman.

The articles of the Code of Obligations (CO), the Civil Code (CC), the Criminal Code (CP), the Debt Enforcement Act (LP), the AVS Act (LAVS), the Accident Insurance Act (LAA) and the Posted Workers Act (LDet) cited were re-read on Fedlex on 6 November 2026. The articles of the SIA 118 standard, which is not freely available, are given according to our fact sheets and must be checked in the edition applicable to your contract. Updated: 7 November 2026.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.