Tools, PPE and compliance
Choosing and using your equipment without liability: SUVA limit values, hand-arm vibrations, dust extraction, anchors, discs, PPE and consumables.
- 32guides
- 8sections
- 551pages in other sections
- 78hub tools
📘 The essentials 6
Industrial Dust Extraction and Air Treatment on Swiss Construction Sites: Dust Classes L, M and H (SUVA)
Swiss construction site dust extraction standards: EN 60335-2-69 L, M, H classes, HEPA H14 filters, mineral dust and SUVA requirements. Buyer's guide.
The essentialsDiamond Blades, Core Bits and 4-Cutter Carbide Drill Bits: Engineering Guide to Bonds and Site Materials
Swiss engineering guide for diamond blades and SDS drill bits: metal bonds, aggregate compatibility, EN 13236 standard, and PGM certification.
The essentialsPersonal Protective Equipment (PPE) for Swiss Construction Sites: SUVA, OTConst & CFST 6508 Compliance Guide
Complete guide to PPE on Swiss construction sites. SUVA, OTConst, and CFST 6508 compliance. Protect your teams and prevent costly site shutdowns.
The essentialsStructural Fastening Systems, Chemical Mortar and ETA Option 1 / SIA 261-262 Approved Anchors
Specification of ETA Option 1 approved structural anchors, injection resins and expansion bolts in Switzerland under SIA 261 and SIA 262 standards.
The essentialsProfessional Power Tools by CFC Chapter: Engineering Selection and SUVA Vibration Values
Swiss engineering guide: selecting power tools by CFC chapter, SUVA vibration thresholds at 2.5 and 5.0 m/s², and site compliance.
The essentialsConstruction Site Logistics, VSS Road Signage, Site Fencing, and Environmental Spill Containment (OLED / SIA 430)
Swiss specification guide: VSS temporary road signs, weighted fencing, and OLED / SIA 430 spill containment on construction sites. Norms & rules.
📘 Dust extraction 3
Class M Dust Extractor (Swiss Site Standard) vs Asbestos Class H: OEL Thresholds and SUVA Inspection Requirements
Swiss technical guide: SUVA OEL thresholds, class M vs asbestos class H dust extractors, legal obligations and inspection criteria on construction…
Dust extractionAuto-Pulse Power-Tool Dust Extractors: Continuous Suction on Concrete Wall Chasers and Grinders
Technical guide to auto-pulse dust extractors for concrete wall chasers and grinders under SUVA requirements and SIA 118 standards.
Dust extractionMobile Negative Pressure Air Scrubbers: Dust Containment in Occupied Renovations
Technical guide to negative pressure mobile air scrubbers in occupied Swiss sites: HEPA filtration, containment integrity, and OTConst compliance.
📘 Consumables 3
Diamond Blade Mechanics: Why Swiss Granite Requires a Soft Bond and Asphalt a Hard Bond
How to choose between soft and hard bond diamond blades in Switzerland. Technical review for granite, reinforced concrete and asphalt under SIA 118.
ConsumablesContinuous Rim, Fluted Turbo, or Laser-Welded Segments: Avoiding Bursting and Chipping on 20 mm Porcelain Stoneware
Diamond blade selection for 20 mm porcelain stoneware on Swiss sites. Prevent bursting and comply with standard SIA 118 and the OTConst.
ConsumablesSolid Carbide 4-Cutter SDS-Plus and SDS-Max Drill Bits: Drilling Rebar Without Jamming and Complying With ETA Tolerances
Technical guide to solid carbide 4-cutter SDS-Plus and SDS-Max drill bits in Switzerland: rebar drilling without jamming, ETA anchor tolerances and…
📘 Safety PPE 4
Site Earmuffs and Custom Moulded Earplugs: Calculating Exact SNR Attenuation for Machine Noise
Swiss guide to calculating the SNR rating of construction site earmuffs and earplugs according to SUVA requirements and art. 36 OTConst.
Safety PPES3 and S7 Site Safety Shoes and Boots: Composite Puncture-Resistant Midsoles and Water-Repellent Uppers
Technical guide to S3/S7 safety boots on Swiss construction sites: composite puncture-resistant midsoles, water-repellent uppers, and safety…
Safety PPEEN 361 Harnesses, Retractable Fall Arresters and Temporary Lifelines: Mandatory Fall Protection under OTConst
Swiss fall protection guide: OTConst and SUVA compliance for EN 361 harnesses, retractable fall arresters and temporary lifelines on roofs.
Safety PPEFFP3 Masks, P3 Half-Masks, and Powered Air: Protecting Teams from Silica Dust and Asbestos (SUVA)
Swiss guide to FFP3 respiratory protection, P3 half-masks, and powered air against quartz dust and asbestos according to SUVA and the OTConst.
📘 Fastenings 3
External Thermal Insulation Composite System (ETICS - CFC 226) Fasteners Without Point Thermal Bridging (Chi <= 0,002 W/K)
Technical guide to ETICS anchors without thermal bridging Chi <= 0.002 W/K under CFC 226, standard SIA 118, and revised Swiss CO defect liability…
FasteningsAnchor Bolts for Cracked Concrete (ETA Option 1) and Swiss Seismic Zones Categories C1 / C2 (SIA 261)
Technical guide to ETA Option 1 cracked concrete anchor bolts and C1/C2 seismic categories under SIA 261 and SIA 262 standards in Switzerland.
FasteningsStyrene-Free Vinylester vs Pure Epoxy Injection Resins: Post-Installed Rebars and Dynamic Loads (SIA 262)
Swiss technical guide: styrene-free vinylester and pure epoxy resins for post-installed rebars and dynamic loads according to standard SIA 262.
📘 Safety logistics 3
Formwork Oil & Fuel Spill Containment Bunds and Emergency Spill Kits on Construction Sites (LEaux / OLED)
Technical guide to hydrocarbon spill containment bunds and emergency spill kits on Swiss construction sites under the LEaux, OLED and environmental…
Safety logisticsFreestanding Construction Site Barriers & Fencing: Anti-Lift Ballasting and OPB Acoustic Attenuation Tarpaulins
Swiss technical guide: freestanding mobile site fencing, anti-lift ballast sizing, and OPB- and OTConst-compliant acoustic tarpaulins.
Safety logisticsVSS-Compliant Temporary Site Road Signs, LED Beacons and Autonomous Traffic Lights
Swiss guide to temporary site signage under VSS standards: road signs, LED beacons, traffic lights and OTConst compliance.
📘 CFC tools 6
CFC 221 / 224 Equipment (Facades & Waterproofing): TPO/PVC Membrane Hot Air Welders and Dust-Sealed Wall Chasers
CFC 221 & 224 engineering guide: selecting TPO/PVC hot air welders and dust-sealed wall chasers compliant with Swiss safety standards and regulations.
CFC toolsCFC 271 / 285 Equipment (Plastering & Painting): Dust-Free Drywall Sanders and High-Pressure Airless Pumps
Swiss engineering guide for CFC 271 & 285: selection criteria for drywall sanders, dust extractors and high-pressure airless sprayers under OTConst &…
CFC toolsCFC 211 Equipment (Masonry & Reinforced Concrete): High-Frequency Vibrators, SDS-Max AVR Breakers and Wet Cutters
Technical guide to CFC 211 tools in Switzerland: concrete vibrators, SDS-Max breakers & wet cutters. SUVA, art. 33 OTConst and SIA standards…
CFC toolsCFC 214 Equipment (Timber & Wood Framing): Deep-Cut Saws, Guide Rails, and Cordless Nailers
Engineering technical guide for CFC 214 in Switzerland: deep-cut saws, cordless nailers, guide rails, and SUVA compliance on timber framing sites.
CFC toolsCFC 23–25 Equipment (MEP: Electrical, HVAC, Plumbing): Rig-Mounted Core Drills and Radial Press Tools
Engineering technical guide for CFC 23–25: selecting rig-mounted core drills and radial press tools per Swiss safety requirements and standards.
CFC toolsCFC 281 / 282 Tools (Screeds & Tiling): 160 cm XXL Porcelain Cutters and S1/S2 Mixers
CFC 281 & 282 equipment guide in Switzerland: XXL porcelain tile cutters and mixers for S1/S2 adhesives. SIA standards, health and safety site rules.
📘 Compliance tools 4
A(8) Hand-Arm Vibration Calculator: Maximum Allowed Exposure Time under SUVA Thresholds (2.5 & 5.0 m/s²)
Calculate max daily A(8) hand-arm vibration exposure under SUVA thresholds (2.5 & 5.0 m/s²). Compliant with Swiss regulations and OMach.
Compliance toolsDiamond Blade Compatibility Matrix: Choosing Between Soft and Hard Bonds Based on the Material Cut
Optimise your on-site cuts in Switzerland with our diamond blade compatibility matrix. Choose the right bond for every material (EN 13236).
Compliance toolsSelector for ETA Option 1 Approved Anchors & Chemical Resin (Cracked Concrete & Seismic SIA 261 C1/C2)
Tool for selecting ETA Option 1 anchors and chemical resin in cracked concrete and seismic zones under SIA 261 and SIA 262 standards.
Compliance toolsSwiss Construction Site Vacuum Selector (Class L, M or H / HEPA H14) based on Dust & SUVA VLEP
Select your construction site vacuum (Class L, M, H) based on Swiss VLEP & SUVA factsheets. Avoid quartz and asbestos work stoppages.
Other guide sections
Organize your company
The six-pillar method for a Swiss construction SME: management, MSST standardisation, team, site, sales, ca...
48 guidesSite monitoring
Managing a construction site in Switzerland: construction management, minutes, force majeure, amendments, acceptance, defects and guarantees...
80 guidesBids and contracts
Responding to a tender and pricing accurately: AIMP and public procurement, Simap, quantities and CAN/CRB, SIA 451, clauses to sp...
94 guidesEmployment and recruitment
Working and recruiting in the Swiss construction industry: collective labour agreement, salary and social charges, permits and cross-border workers, notice periods and protection,...
48 guides2D/3D plans and permits
From plan to permit: SIA 400 and 416 standards, areas and indices, public inquiry per canton, on-plan measurement and pr...
21 guidesCFC trade training
Training and upskilling your teams, trade by trade: 21 Swiss construction CFC pathways, from structural work to finish...
