Scaffolding Measurement Calculator (CAN 114 / SIA 222) & OTConst Safety
Calculator for scaffolding area (measurement surcharges), load classes & ties.
Interactive tool
Uplifts and anchoring grid from the specifications (CAN 114 and SIA 222 not consulted); OTConst reminders read in the ordinance (Art. 42, 43, 51, 55, 57 to 59). Discrepancy: the specifications place prefabricated elements and stone in class 4; OTConst Art. 55 requires 4,50 kN/m² for heavy material: the tool adds class 5.
A The façade
6 Planned roof work
Measurement, anchorages and OTConst reminders
- Billable measured length
- Billable measured height
- Net façade area
- Billable measured area
- Anchorages
- Load class
Measurement length = length + 1,00 m per corner; measurement height = height + 1,00 m; ties = measurement area / area per tie (24, 16 or 12 m²).
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.13"] in the content of a page on the site.
📄 Files and templates linked to this tool (free)
- PDFDOCX ⚖️ Pure Law Criminal Liability Protocol (Art. 229 CP) & STOP Right to Halt Work Complete 6-page guide (PDF) and Word template. What the owner, the site manager and the foreman risk, and how to stop dangerous work: written delegation of authority, « STOP » notice and letters. See the file, its mini-tool and the pack →
- PDFDOCX Public Land Occupation File & VSS 40 886 Signage The municipal application to occupy the public domain and the site signage diagrams. See the file, its mini-tool and the pack →
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Scaffolding measurement rules in Switzerland (CAN 114 / SIA 118): why the billed area exceeds the façade area by 15 % to 25 %
The façade scaffolding measurement rule under SIA 118 and CAN 114 does not measure the façade but the scaffolding: it extends beyond the façade at the corners and above the last platform. With the surcharges in the specifications, the measurement area of the example façade (20 m by 9 m, i.e. 180 m²) varies with the number of external corners:
| External corners | Measured length | Measured height | Measured area | Markup |
|---|---|---|---|---|
| 0 | 20,0 m | 10,0 m | 200 m² | +11,1 % |
| 1 | 21,0 m | 10,0 m | 210 m² | +16,7 % |
| 2 | 22,0 m | 10,0 m | 220 m² | +22,2 % |
| 4 | 24,0 m | 10,0 m | 240 m² | +33,3 % |
Note on the text of the standard. The surcharges (+1,00 m per corner, +1,00 m of height) are those of the specifications; CAN 114 and SIA 118 were not consulted. The range of «15 % to 25 %» in the title is that of the specifications: with the tool's surcharges, the default example (4 corners) gives +33,3 % and only façades with 1 or 2 corners stay within that range (+16,7 % and +22,2 %). Refer to the bill of quantities of the tender.
Height surcharge (+1,00 m above the last platform) and measurement of length at external corners
The measurement height stops 1,00 m above the last platform required, i.e. 9,0 m + 1,00 m = 10,0 m for the example, gutter height included. The length is measured along the axis of the platform; at each external corner, the scaffolding turns and the measurement length gains 1,00 m. A scaffold without a corner return (free-standing façade) does not receive this surcharge. For the road-space occupation fees that are added in town, see the public land occupation fee calculator.
Standard SIA 222 and OTConst (Art. 47 to 65): load classes (Class 3 vs Class 4), the 30 cm rule and the sheet-metal worker's bridge
The scaffolding load class 3 and 4 under SIA 222 sets the working load and the width of the platform. The OTConst (art. 55) expresses it as follows:
| Works | Imposed load | Width of the decking | Load class |
|---|---|---|---|
| Light material: rendering, painting, external insulation | 2,00 kN/m² (200 kg/m²) | 60 cm | Class 3 |
| Material storage: masonry | 3,00 kN/m² (300 kg/m²) | 90 cm | Class 4 |
| Heavy material: prefabricated elements, stone cutting | 4,50 kN/m² (450 kg/m²) | 90 cm | Class 5 |
The maximum distance of façade scaffolding of 30 cm under the OTConst is the rule of art. 57 para. 3: the distance between the platform and the façade may not, in any work phase, exceed 30 cm; otherwise, additional measures prevent falls. The scaffold platforms are 1,9 to 2,3 m apart (art. 57 para. 1). For roof work, a sheet-metal worker's bridge is placed at most 1,00 m below the gutter or the edge of the flat roof (art. 58 para. 2), with a guardrail at least 60 cm from the gutter and a top rail at least 80 cm above the roof edge (art. 58 para. 4). The height of the roofer's retaining wall at the eaves is that of art. 42 para. 4, for work on an existing roof: fixed along the gutter, it extends at least 80 cm above it and has a construction height of at least 100 cm. The openings of the roofer's protective wall do not exceed 100 cm² (art. 59). See also the OTConst safety plan.
Note on the text of the standard. Deviation from the specifications: the specifications classify «heavy masonry, stone and prefabricated elements» in class 4 (300 kg/m²); according to the OTConst (art. 55, as at 1 January 2024), heavy material, such as prefabricated elements and stone dressing, requires 4,50 kN/m²: the tool therefore adds a class 5 (450 kg/m²) and reserves class 4 for masonry with storage. The specifications refer to the load classes of SIA 222, which was not consulted; the values above are read from the ordinance.
Tie grid of a façade scaffold (bare vs sheeted) and criminal liability in the event of unauthorised removal of a tie
The calculation of the number of ties of a sheeted scaffold divides the measurement area by the area covered by one tie. Grid from the specifications and result for the example façade (240 m² of measurement):
| Scaffold | Area per anchorage | Anchorages for the example façade |
|---|---|---|
| Bare | 24 m² | 10 |
| Dust-protection net | 16 m² | 15 |
| Solid sheeting — high wind loading | 12 m² | 20 |
A solid sheet turns the scaffold into a sail: wind load increases and the ties are reinforced, especially at the corners. The OTConst requires an anchorage resistant to tensile and compressive forces (art. 51) and reserves modifications of the scaffold to the scaffolding contractor (art. 64): removing a tie without their agreement exposes you to criminal liability in the event of an accident. ⚡ Price your scaffolding in Soumission
Note on the text of the standard. The tie grid (1 tie per 24 m² bare, 16 m² with netting, 12 m² with sheeting) is that of the specifications: the OTConst does not quantify the spacing. The criminal consequences of removing a tie (for example breach of the rules of the building art, art. 229 CP) are given for information and have not been verified in the text of the law: consult a lawyer.
Frequently Asked Questions about Scaffolding, Measurement and Ties (FAQ)
1. How is façade scaffolding measured under CAN 114?
The specifications apply two surcharges to the façade: the measurement length is extended by 1,00 m per external corner, and the measurement height exceeds the last platform by 1,00 m. For a façade of 20 m by 9 m with 4 corners, the measurement area is 240 m² for 180 m² of façade, i.e. 33,3 % more; with 2 corners, 220 m² (+22,2 %).
These surcharges are those of the specifications; the text of CAN 114 and SIA 118 were not consulted. Refer to the bill of quantities of the tender.
2. What is the maximum distance between the scaffold platform and the façade?
The OTConst (art. 57 para. 3) prohibits the distance between the platform and the façade from exceeding 30 cm in any work phase; if the condition cannot be met, additional measures must prevent falls. Art. 43 likewise concerns the opening of more than 30 cm between the sheet-metal worker's bridge and the façade. The sheet-metal worker's bridge is placed at most 1,00 m below the gutter (art. 58 para. 2), with a guardrail at least 60 cm from the gutter and a top rail at least 80 cm above the roof edge.
These values are read from the OTConst, as at 1 January 2024; see also the site safety plan (tool 5.16).
3. How many ties for a façade scaffold, bare or sheeted?
The specifications use one tie every 24 m² for a bare scaffold (4 m by 6 m grid), every 16 m² with netting and every 12 m² with solid sheeting, with reinforcement at the corners. For the measurement area of the example (240 m²), that makes 10 ties bare, 15 with netting and 20 with sheeting.
The OTConst requires an anchorage resistant to tensile and compressive forces (art. 51) without quantifying the spacing: the grid is from the specifications, not verified. The scaffolding contractor prevails, and only they modify the scaffold (art. 64).
Indicative information prepared from the OTConst (as at 1 January 2024) and the tool's specifications; it replaces neither CAN 114, nor SIA 222, nor the opinion of the scaffolding contractor.