Aller au contenu
Website
SUVA · FAR · RESOR · CAFIB Tool 2.2 Online

Comparison of Employer Social Charges in Construction across the 26 Cantons (2026)

Compare employer social charges in construction across the 26 cantons.

Interactive tool

1 Branche

2 Cantons to compare

CHF

The 13th-month salary is prorated (× 1.0833): contributions are levied on 100% of gross pay, 13th month included.

Breakdown of the 8 social contributions: employer share and employee share

Weighted average rates from the ACIP 2026 reference system applied to gross pay with 13th-month salary; unemployment insurance applies only to CHF 148'200 per year. Employee share: AVS/AI/APG and AC are joint, while the CAF and the LAA-P are entirely borne by the employer. 1 LPP and IJM: the employer bears at least 50%; the employee share shown is the joint split (at most the employer share) and depends on your fund's rules. "Not disclosed": FAR/RESOR and joint-committee funds are not quantified on the employee side in the reference system; the LAA-NP, deducted from the employee, is not included: check your payslip.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="2.2"] in the content of a page on the site.

📄 Files and templates linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Full breakdown of the 8 mandatory employer social contributions in construction (34% vs 25%)

The employer social charges in Swiss construction average 34% of gross pay in structural work (National Agreement) and 25% in finishing trades (CCT-SOR) as in building services (EIT.swiss and Suissetec), 13th-month salary included. They consist of eight mandatory contributions for which the calculator above gives the employer share and the employee share, as a percentage and in francs per month. For the full cost of a worker, including the 13th-month salary, meals and productive hours, see the worker real-cost and daywork rate simulator.

1. The common federal base: AVS / AI / APG (5.30%), AC unemployment insurance (1.10%) and LPP 2nd pillar

The AVS AI APG 2026 contribution rate is 5.30% borne by the employer, the same borne by the employee, on 100% of gross pay, 13th-month salary included. On top come 0.15% of administrative costs of the joint fund paid by the employer: the AVS/AI/APG line of the table below therefore shows 5.45% on the employer side. Unemployment insurance (AC) is joint, at 1.10% each, up to CHF 148'200 of annual salary.

Occupational pension (LPP, 2nd pillar) represents about 6.00% to 6.50% of gross pay as a weighted average borne by the employer (6.50% in structural work and building services, 6.00% in finishing trades). It varies with the employee's age: the comparator offers the bands 18–24 years (risk only, about 1.2%), 25–34 (4.5%), 35–44 (5.8%), 45–54 (7.8%) and 55–65 (9.5%). The employer bears at least 50%.

2. Why the SUVA (LAA-P) and Early Retirement (FAR at 6.00% vs RESOR at 1.25%) create a 9-point gap between structural work and finishing trades

Three items out of eight are identical in all branches (AVS/AI/APG, AC and CAF); the other five explain the gap of 9 percentage points between the 34% of structural work and the 25% of finishing trades. The SUVA LAA-P premium structural work finishing trades weighs 6.20% against 3.50% (a gap of 2.70 points), because the risk of occupational accident is higher on structural-work sites; it is entirely borne by the employer.

The largest part of the gap comes from early retirement: the FAR early retirement contribution 6% in structural work (FAR foundation, from age 60) against 1.25% for the RESOR foundation finishing trades French-speaking Switzerland, i.e. a gap of 4.75 points. The joint-committee funds (0.80 points), the LPP (0.50 points) and sickness daily-allowance insurance (0.25 points) make up the 9 percentage points. In building services, the trade's pre-retirement costs 1.20% and the SUVA premium 2.60%.

The 8 employer contributions: Structural Work, Finishing Trades and Building Services
Social contribution itemStructural Work (CN): employer shareFinishing Work (CCT-SOR): employer shareBuilding Services (EIT / Suissetec): employer shareLegal rule and calculation base
1. AVS / AI / APG + administrative costs5.30% + 0.15% administrative costs of the joint fund 5,45 %5,45 %5,45 %Joint (5.3% employer / 5.3% employee) on 100% of gross pay (13th month included).
2. Unemployment insurance (AC) 1,10 %1,10 %1,10 %Joint (1.1% / 1.1%) up to CHF 148'200/year.
3. Family allowances (CAF) + funds1.70% to 3.60% depending on the canton (average ~2.65%) 2,65 %2,65 %2,65 %100% borne by the employer (cantonal rate varying according to the table of the 26 cantons).
4. SUVA occupational accident (LAA-P)Structural work: high risk class · Finishing trades: moderate risk · Building services: technical risk 6,20 %3,50 %2,60 %100% borne by the employer (the LAA-NP is deducted from the employee).
5. Occupational pension LPP (2nd pillar)ACIP weighted average; varies with age (25–34, 35–44, 45–54, 55–65 years) 6,50 %6,00 %6,50 %Employer share at least 50 %.
6. Early retirement (FAR / RESOR)Structural work: FAR foundation (from age 60) · Finishing trades: RESOR foundation · Building services: trade pre-retirement 6,00 %1,25 %1,20 %Mandatory on the gross salary subject to AVS (13th-month salary included).
7. Sickness daily-allowance insurance (IJM)Structural work: 80% / 90% cover · Finishing trades: CCT-SOR cover · Building services: CCT cover 2,10 %1,85 %1,80 %Employer share at least 50% of the total premium (waiting period 30 to 60 days).
8. Joint-committee funds and training (Parifonds)Structural work: 0.70% + ~3.30% holidays/bridging days · Finishing trades: 0.60% + ~2.60% · Building services: 0.50% + ~3.20% 4,00 %3,20 %3,70 %Trade contribution, enforcement of the CCT and continuing training / apprentices.
Average total of employer chargesAdjusted in the tool according to the CAF rate of the chosen canton 34,00 %25,00 %25,00 %From the gross, 13th month included.

Weighted average rates from the ACIP 2026 reference system. The CAF is shown at its average of 2.65% (from 1.70% to 3.60% depending on the canton).

Comparison Table of the 26 Swiss Cantons: CN Wage Zones, Employer CAF Rates and ACIP Price Modifiers

The rates of the family allowance fund CAF by canton are the main factor of variation in employer charges: the rate ranges from 1.60% to 3.55% of gross pay depending on the canton, entirely borne by the employer. To this are added the canton's CN wage zone and an ACIP tender-price modifier, shown for the 26 cantons in the table.

1. Specifics of French-speaking Switzerland (Vaud CAFIB, Geneva, Valais, Fribourg, Neuchâtel, Jura, Bern)

The difference in social charges Vaud Geneva Valais comes essentially from the CAF. Vaud applies a rate of 3.40% (the CAFIB Vaud and the social funds), i.e. 34.8% employer charges in structural work and 25.8% in finishing trades. Geneva combines a CAF of 2.85% and Geneva joint-committee funds: 35.2% and 26.2%, the highest rates in the table. Valais has the highest CAF (CAF and family funds VS, 3.55%): 34.9% and 25.9%.

Fribourg (2.65%, i.e. 34.0% and 25.0%, the reference rate for the 34% and 25%), Neuchâtel (2.75%) and Jura (3.10%) fall within the range of the French-speaking cantons; Bern, at 1.90%, is closer to German-speaking Switzerland. For a base salary of CHF 6'000 (contribution base of CHF 6'500 with the 13th-month salary), the annual gap in structural work is CHF 312 between Geneva and Vaud, CHF 78 between Valais and Vaud and CHF 936 between Geneva and Fribourg.

2. Impact of the canton on your tenders: how to pass your cantonal charges on in your ACIP unit prices

The canton's ACIP price modifier reflects the local tender-price level: 0% in Vaud (base 100), +12.0% in Geneva, −5.0% in Valais on the plain, with surcharges by town or resort (Lausanne, Crans-Montana, Verbier, Zermatt, St. Moritz...). Apply it to your ACIP unit prices, then check that your cantonal charges are covered by your hourly rate.

Example for an experienced CFC journeyman in finishing trades at CHF 6'050 per month: the break-even point is CHF 79.89/h in Vaud, CHF 80.12/h in Geneva and CHF 79.95/h in Valais (overheads of 22%), for recommended ACIP daywork rates of CHF 96.00, 107.50 and 91.20/h. The simulator 2.1 does this calculation for each profile.

The 26 cantons: CN wage zone, employer CAF rate, employer charges and ACIP price modifier
CantonCN Structural Work zoneEmployer CAF rateEmployer charges GOEmployer charges SO / Building ServicesACIP price modifierCities and resorts (ACIP surcharges)
VD — VaudBlue (Lausanne: Red)3,40 %34,8 %25,8 %+0,0 %Lausanne (+5%), Nyon/Morges (+5%), Montreux/Vevey (+3%), Villars (+10%)
GE — GenevaRed2,85 %35,2 %26,2 %+12,0 %Geneva City (+15%), Carouge/Lancy (+12%), Cologny (+18%)
VS — ValaisBlue3,55 %34,9 %25,9 %−5,0 %Sion/Sierre/Martigny (-5%), Crans-Montana (+12%), Verbier (+18%), Zermatt (+25%)
FR — FribourgBlue2,65 %34,0 %25,0 %−2,0 %Fribourg City (0%), Bulle (0%), Murten (0%)
NE — NeuchâtelRed2,75 %34,1 %25,1 %−3,0 %Neuchâtel City (-2%), La Chaux-de-Fonds (-4%)
JU — JuraRed3,10 %34,5 %25,5 %−6,0 %Delémont (-5%), Porrentruy (-6%)
BE — BernBlue (City/JB: Red)1,90 %33,3 %24,3 %+2,0 %Bern City (+5%), Biel/Bienne (0%), Interlaken (+6%), Gstaad (+20%)
ZH — ZurichRed1,70 %33,1 %24,1 %+14,0 %Zurich City (+18%), Winterthur (+10%)
ZG — ZugRed1,60 %33,0 %24,0 %+15,0 %Zug City (+16%)
BS — Basel-CityRed2,10 %33,5 %24,5 %+10,0 %Basel (+10%)
BL — Basel-CountryBlue1,90 %33,3 %24,3 %+6,0 %Liestal (+6%)
AG — AargauBlue1,75 %33,1 %24,1 %+3,0 %Aarau (+5%), Baden (+5%)
SO — SolothurnBlue1,85 %33,2 %24,2 %+1,0 %Solothurn (+2%), Olten (+2%)
LU — LucerneBlue1,80 %33,2 %24,2 %+4,0 %Lucerne City (+6%)
SZ — SchwyzBlue1,65 %33,0 %24,0 %+5,0 %Freienbach/Pfäffikon (+8%)
NW — NidwaldenBlue1,65 %33,0 %24,0 %+3,0 %Stans (+3%)
OW — ObwaldenGreen1,75 %33,1 %24,1 %+1,0 %Sarnen (+1%), Engelberg (+10%)
UR — UriGreen1,95 %33,3 %24,3 %+0,0 %Altdorf (0%), Andermatt (+18%)
SG — St. GallenBlue1,85 %33,2 %24,2 %+2,0 %St. Gallen (+3%), Rapperswil (+6%)
TG — ThurgauBlue1,80 %33,2 %24,2 %+0,0 %Frauenfeld (0%), Kreuzlingen (+1%)
SH — SchaffhausenBlue1,90 %33,3 %24,3 %+2,0 %Schaffhausen (+3%)
AR — Appenzell Rh.-Ext.Green1,85 %33,2 %24,2 %−1,0 %Herisau (-1%)
AI — Appenzell Rh.-Int.Green1,80 %33,2 %24,2 %−2,0 %Appenzell (-2%)
GL — GlarusGreen1,90 %33,3 %24,3 %−1,0 %Glarus (-1%)
GR — GraubündenBlue / Green1,95 %33,3 %24,3 %+0,0 %Chur (0%), St. Moritz (+25%), Davos/Arosa (+16%)
TI — TicinoGreen2,35 %33,7 %24,7 %−7,0 %Lugano/Ascona (-2%), Bellinzona/Mendrisio (-7%)

Source: ACIP 2026 reference system. CAF rate: building-sector average; the red, blue or green wage zones are those of the National Agreement for structural work. Indicative values: they replace neither the applicable collective agreement nor your fund's statements.

Frequently Asked Questions about Social Contributions in Swiss Construction (FAQ)

1. Who pays the SUVA premium for occupational accident (LAA-P) and non-occupational accident (LAA-NP)?

The occupational accident premium (LAA-P) is entirely borne by the employer. In the ACIP 2026 reference system it represents 6.20% of gross pay in structural work (high risk class), 3.50% in finishing trades (moderate risk) and 2.60% in building services.

The non-occupational accident premium (LAA-NP) is deducted from the employee's salary. Its rate is not quantified in the reference system: it therefore does not enter the tool's employer charges and should be checked on the payslip.

2. Does the FAR contribution (6% employer) or RESOR also apply to the 13th-month salary?

Yes. Early retirement is calculated on the gross salary subject to AVS, 13th-month salary included: 6.00% in structural work (FAR foundation, from age 60), 1.25% in finishing trades (RESOR foundation) and 1.20% for the trade pre-retirement scheme in building services.

For a base salary of CHF 6'000, the monthly contribution base is CHF 6'500 (prorated 13th-month salary): the employer contribution reaches CHF 390.00 per month in structural work (FAR) and CHF 81.25 per month in finishing trades (RESOR).

3. Why is the Family Allowance Fund (CAF) rate twice as high in the canton of Vaud or Valais as in Aargau or Zug?

Family allowances are financed 100% by the employer, at a rate set canton by canton. In the ACIP 2026 reference system the rate reaches 3.40% in Vaud (CAFIB and social funds) and 3.55% in Valais (CAF and family funds VS), against 1.75% in Aargau and 1.60% in Zug: a ratio of about two.

On a monthly base of CHF 6'500 (CHF 6'000 base salary with 13th-month salary), this represents CHF 221.00 per month in Vaud against CHF 104.00 in Zug, i.e. CHF 1'404 more per year for a single employee.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.