Aller au contenu
Website
NIBT (NIN) / OIBT Tool 6.15 Online

NIBT Electrical Configurator (Bathroom Zones), Cross-Sections & OIBT Periodicity

Configurator for bathroom safety zones, DDR 30 mA & OIBT inspection periodicity.

Interactive tool

Rules from the specifications, NIBT not consulted. Zones, distances (60 cm, 120 cm, 225 cm) and protection ratings: specifications, based on chapter 7.01 of the NIBT (NIN), a paid standard; online sources diverge on the zone 2 sockets and on the IPX7 rating of zone 0, only the 30 mA residual-current device is agreed on. Voltage drop: ρ of hot copper = 0,0225 Ω·mm²/m. Inspection periods: annex of the OIBT (RS 734.27), as summarised by the specifications.

A Bathroom zones checker (NIBT chapter 7.01)

cm
cm

Zone verdict

The four zones of the bathroom
ZoneLocationMinimum ratingRule

In the bathtub, zone 0 goes up to 10 cm; zone 1 goes up to 225 cm from the floor; zone 2 extends 60 cm around it. For a walk-in shower, zone 1 is a radius of 120 cm around the origin of the hose.

B Copper conductor cross-section and voltage drop

m

Voltage drop

Voltage drop ΔU

ΔU = 2 × L × I × 0.0225 / S for single-phase and √3 × L × I × 0.0225 / S for three-phase. Recommended limit: 4 % (3 % for lighting). The cross-section must also withstand the circuit breaker current: this calculation does not replace that.

C Selector for the periodicity of the OIBT safety report

Next safety report

Inspection period
Deadline

On a change of owner, an inspection is required if the last one dates back more than 5 years (installations with a period of 10 or 20 years). Inheritance is not a change of owner. The OIBT annex also provides for a period of 3 years, which is absent from the specification.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.15"] in the content of a page on the site.

📄 File linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

NIBT standard (NIN 7.01) in the bathroom: understanding zones 0, 1 and 2 and the 60 cm distance for 230 V sockets

The NIBT standard bathroom zone 0 1 2 electrical socket OIBT is based on dividing the wet room into zones around the bathtub or shower tray: the closer to the water, the higher the protection rating and the more limited the permitted appliances. Chapter 7.01 of the NIBT (the low-voltage installation standard, NIN in German) describes these zones; the table below reproduces the rules of the tool's specification.

The four zones of the bathroom, their protection rating and their rules
ZoneLocationMinimum ratingRule
Zone 0Inside the bathtub or shower tray, up to 10 cm highIPX7 (IP27)Only safety extra-low voltage (TBTS) (12 V AC or 30 V DC at most), source outside zones 0, 1 and 2: no 230 V socket or switch.
Zone 1Above the bathtub or shower tray up to 225 cm from the floor, or a radius of 120 cm around the origin of the hose for a walk-in shower without a screenIPX4 (IPX5 if cleaning jets)No 230 V T13 socket or standard switch: only fixed water heaters and shower appliances on TBTS of 25 V at most are permitted.
Zone 2From 0 to 60 cm around zone 1, up to 225 cm from the floorIPX4Class II luminaires; 230 V T13 sockets prohibited, except a shaver socket with an integrated isolating transformer or a combined washbasin / mirror supply unit compliant with the NIBT.
Outside the zonesMore than 60 cm from the edge of the bathtub or the fixed screen, or more than 225 cm from the floorDepending on the room230 V T13 / T23 sockets permitted, with mandatory protection by a residual current device (DDR) of 30 mA at most.

For a walk-in shower without a tray, zone 1 is not defined by the bathtub but by a radius of 120 cm around the origin of the hose, and zone 2 extends 60 cm further. With the tool's default values (a point 45 cm from the edge of the bathtub and 120 cm above the floor), the point is in zone 2: a T13 socket cannot be fitted there.

Clarification on the text of the standard. The NIBT (a paid standard from Electrosuisse, formerly SEV) was not consulted: the rules in the table are those of the specification. Online sources differ on the sockets in zone 2 and do not confirm the IPX7 rating of zone 0; only protection by a residual current device of 30 mA at most is agreed on. Do not rely on this table to fit a socket: an authorised installation electrician determines the zones on the bathroom plan. For the dimensions of an accessible bathroom, see the SIA 500 standard tool.

IPX4 / IPX7 protection ratings and the obligation to fit a DDR residual current device ≤ 30 mA

The IPX4 IPX7 protection rating wet room is the IP code of the IEC (CEI) 60529 standard. The letter X indicates that protection against solid objects is not specified; the second digit measures protection against water: 4 for splashing water from all directions, 5 for water jets (the case of cleaning jets), 7 for temporary immersion, which explains the rating of zone 0, inside the bathtub. The specification therefore requires IPX7 (IP27) in zone 0, IPX4 in zones 1 and 2.

The residual current device DDR 30 mA mandatory NIBT cuts the circuit as soon as a leakage current of 30 mA is detected, before it becomes dangerous for a person. The specification requires it for 230 V sockets (T13 and T23) installed outside the zones.

OIBT Ordinance in Switzerland: frequency of electrical inspections (20 years, 10 years, 5 years, 1 year) and property sales

The frequency of electrical inspection OIBT 20 years 10 years 5 years Switzerland depends on the type of installation. The Low-Voltage Installations Ordinance (OIBT, RS 734.27) requires the owner to have the installation inspected periodically and to hand the safety report to the network operator. The specification uses four periods:

OIBT inspection periods used in the specification
Type of installationPeriodRemark
Dwellings / Housing20 yearsEvery 20 years, with an inspection at each change of owner if the last one dates back more than 5 years.
Offices, craft workshops, ordinary shops10 yearsEvery 10 years.
Department stores, schools, hotels, restaurants, medical buildings5 yearsEvery 5 years.
Construction sites and markets1 yearEvery year.

For a dwelling whose last inspection dates from 2010, the next safety report is due in 2030. In the event of a sale, as 16 years have passed since that inspection (more than 5 years), an inspection is required at the change of owner: better to plan for it before signing the deed.

Clarification on the text of the standard. According to a text from the Federal Inspectorate for Heavy Current Installations (ESTI) consulted on 6 November 2026, the inspection at a change of owner (item 3 of the OIBT annex) concerns installations whose period is 10 or 20 years, and not only dwellings; inheritance is not a change of owner, a gift is. The OIBT annex also provides for a period of 3 years, which the specification does not mention: the tool does not calculate it. The periods of 1, 5, 10 and 20 years are those of the specification; confirm that of your installation with your network operator or an independent inspector.

Sizing copper cables (1.5 mm2 vs 2.5 mm2) and calculating the maximum voltage drop (4 %)

The voltage drop calculation electrical cable 1.5 mm2 2.5 mm2 compares the voltage drop of a circuit with the recommended limit of 4.0 % of the nominal voltage (3.0 % for lighting). It equals ΔU = 2 × L × I × ρ / S for single-phase (230 V) and ΔU = √3 × L × I × ρ / S for three-phase (400 V), with L the length in metres, I the current in amperes, ρ the resistivity of hot copper (0.0225 Ω·mm²/m) and S the cross-section in mm². For a single-phase line of 28 m protected by a 16 A circuit breaker:

Voltage drop of a single-phase line of 28 m at 16 A according to cross-section
Cross-sectionVoltage dropAs % of 230 VLimit of 4,0 %
1,5 mm²13,44 V5,84 %exceeded
2,5 mm²8,06 V3,51 %respected
4,0 mm²5,04 V2,19 %respected
6,0 mm²3,36 V1,46 %respected
10,0 mm²2,02 V0,88 %respected
16,0 mm²1,26 V0,55 %respected

The cross-section of 1.5 mm² is therefore too small for this length and this current, whereas 2.5 mm² is suitable for sockets; for lighting, whose limit is 3.0 %, you have to go to 4.0 mm². In three-phase, the square root of 3 replaces the factor 2, which reduces the drop at equal current.

Clarification on the text of the standard. The resistivity of 0.0225 Ω·mm²/m and the limits of 4 % and 3 % are those of the specification; the NIBT was not consulted. Voltage drop is only one criterion among others: the cross-section must also withstand the circuit breaker's current rating, match its breaking capacity and respect the installation method. The installation electrician confirms the cross-section chosen.

⚡ Price your electrical work in Soumission

Frequently Asked Questions on the NIBT Bathroom, Voltage Drop and OIBT Inspection (FAQ)

1. Where can an electrical socket be fitted in a bathroom?

The specification divides the bathroom into zones around the bathtub or shower tray. In zone 0 (inside the bathtub, up to 10 cm high) and in zone 1 (above, up to 225 cm from the floor), no 230 V socket or standard switch is permitted. In zone 2 (60 cm around zone 1), T13 sockets are prohibited, except a shaver socket with an isolating transformer or a compliant washbasin / mirror supply unit. Beyond 60 cm or above 225 cm, T13 and T23 sockets are permitted if the circuit is protected by a residual current device (DDR) of 30 mA at most.

These rules are those of the specification. The NIBT (chapter 7.01) is a paid standard, not consulted: online sources differ on the sockets in zone 2 and on the IPX7 rating of zone 0. Only the 30 mA DDR is agreed on. An authorised installation electrician confirms the zone of each appliance.

2. How do I calculate the voltage drop of a cable and choose between 1.5 mm² and 2.5 mm²?

The voltage drop of a single-phase circuit equals 2 × length × current × ρ / cross-section, with ρ = 0.0225 Ω·mm²/m for hot copper. For 28 m at 16 A: 13.44 V (5.84 %) with 1.5 mm², which exceeds the limit of 4.0 %, and 8.06 V (3.51 %) with 2.5 mm², which meets it. For lighting, the limit is 3.0 %: the cross-section of 2.5 mm² is no longer enough (3.51 %) and you need at least 4.0 mm².

The limits of 4 % and 3 % and the resistivity of 0.0225 are those of the specification. The cross-section chosen must also withstand the circuit breaker's current rating: the voltage drop calculation does not replace that.

3. How often must an electrical installation be inspected (OIBT)?

The specification uses an inspection period of 20 years for dwellings, 10 years for offices, workshops and ordinary shops, 5 years for department stores, schools, hotels, restaurants and medical buildings, and 1 year for building sites and markets. For a dwelling whose last inspection dates from 2010, the next safety report is due in 2030. On a change of owner, an inspection is also required if the last one dates back more than 5 years: here, 16 years have passed, so the inspection is mandatory on sale.

According to a text from the Federal Inspectorate for Heavy Current Installations (ESTI), this obligation concerns installations with a period of 10 or 20 years, and not only dwellings; inheritance is not a change of owner. The OIBT annex also provides for a period of 3 years, which the specification does not mention and which the tool does not calculate.

Indicative information based on the tool's specification and the OIBT annex; it does not replace the NIBT or the opinion of an authorised installation electrician.

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.