Land-Use Index Converter (CUS/COS ↔ IBUS/IOS) & Rules by Canton
Convert the land-use indices (CUS/COS to IBUS/IOS) and compare the cantonal rules.
Interactive tool
A Your plot and the municipal regulation
3 Type of municipal regulation (PACom, PGA, RCCZ)
Building entitlement of the plot (droits à bâtir)
- Maximum determining floor area (SPd)
- Estimated usable living area (about 80 % of the SPd)
- Maximum building footprint (IOS or COS × STd)
- Equivalence between the two systems
- Minimum distance to the property boundary
The IBUS counts the entire determining floor area within the meaning of SIA 416, walls included, whereas the former CUS often excluded them: for equal building rights, IBUS ≈ CUS × 1.20 to 1.25 (specification factor, not verified). The 80 % usable area and the distance rules are indicative: the municipal regulation and the permit office prevail.
Reference cantonal rules
| Canton and law | Minimum distance to the boundary |
|---|---|
| Vaud - LATC/RLATC | Distance set by the municipal regulation (PGA), often from 3 m to 6 m |
| Valais - LC/OC | d = 1/3 of the facade height, at least 3.0 m |
| Geneva - LCI | LCI envelopes (height and distances set by the zone) |
| Fribourg - LATeC/ReLATeC | d = h / 2, at least 4.0 m |
| Neuchâtel - LConstr | Rule not provided in the specification: see the law and the municipal regulation |
| Jura / Bern | Rule not provided in the specification: see the cantonal law and the municipal regulation |
Embed this calculator on a website page
Paste this code into the page, or write [outil code="5.10"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
From CUS/COS to IBUS/IOS: understanding the reform of the Intercantonal Concordat (AIHC) in French-speaking Switzerland
The intercantonal concordat harmonisation terminology AIHC (intercantonal agreement on the harmonisation of terminology in the building sector) standardises the vocabulary of cantonal laws. It replaces the former land use coefficient (CUS) and the land occupation coefficient (COS) with the gross land use index IBUS determining area and the land occupation index (IOS). The IBUS is the ratio between the sum of all determining floor areas and the determining land area; the IOS relates the building's footprint to the same land area.
A CUS COS to IBUS IOS AIHC converter is useful because municipalities revise their regulations at different dates: a neighbouring plot may come under the old system, yours under the new one. To compare two plots or estimate what an index is worth, both must be brought to the same measure, the determining floor area (SPd).
Why an IBUS of 0.60 is in reality equivalent to a former CUS of 0.48 to 0.50 (the inclusion of walls and SIA 416 areas)
The former CUS often excluded external walls, landings or non-habitable attics; the IBUS counts the entire determining floor area of SIA 416, walls included. For identical building rights, the index therefore rises by about 20 % to 25 %: IBUS ≈ CUS × 1.20 to 1.25. An IBUS of 0.60 thus corresponds to a former CUS of 0.48 to 0.50, that is 600 m² of determining floor area on 1'000 m² of land.
| IBUS | Equivalent former CUS | SPd on 1'000 m² |
|---|---|---|
| 0,40 | 0,32 to 0,33 | 400 m² |
| 0,50 | 0,40 to 0,42 | 500 m² |
| 0,60 | 0,48 to 0,50 | 600 m² |
| 0,70 | 0,56 to 0,58 | 700 m² |
| 0,80 | 0,64 to 0,67 | 800 m² |
Clarification on the text of the standard. The definition of the IBUS (sum of floor areas divided by the determining land area) comes from the intercantonal agreement. The conversion factor of 1.20 to 1.25 is that of the tool's specification: it was not checked in the cantonal texts, and the exact definition of the determining area varies by canton and municipality.
Comparison table of cantonal construction laws (LATC Vaud, LC Valais, LCI Geneva, LATeC Fribourg)
The boundary distance property LATC vaud LC valais LCI geneva is not the same from one canton to another. The table reproduces the reference rules from the tool's specification, which the municipal regulation may clarify or tighten:
| Canton and law | Minimum distance to the boundary | Determining height |
|---|---|---|
| Vaud - LATC/RLATC | Distance set by the municipal regulation (PGA), often from 3 m to 6 m | ridge or eaves depending on the municipal regulation |
| Valais - LC/OC | d = 1/3 of the facade height, at least 3.0 m | façade height |
| Geneva - LCI | LCI envelopes (height and distances set by the zone) | zone envelope |
| Fribourg - LATeC/ReLATeC | d = h / 2, at least 4.0 m | building height |
| Neuchâtel - LConstr | Rule not provided in the specification: see the law and the municipal regulation | according to the municipal regulation |
| Jura / Bern | Rule not provided in the specification: see the cantonal law and the municipal regulation | according to the municipal regulation |
These rules come from the tool's specification and were not checked in the cantonal laws. For Neuchâtel, Jura and Bern, the specification gives no rule: consult the cantonal law and the municipal regulation.
Calculating distances to property boundaries, ridge height vs eaves height and energy bonus
Cantonal rules link the distance to the building height, but the measuring point changes: depending on the canton and municipality, height is taken at the eaves, the ridge or the facade, and pitched roofs or penthouses are counted differently. The same building can therefore be approved in one municipality and refused in the neighbouring one. With the rules in the table:
| Building height | Valais (1/3 of the height, minimum 3,0 m) | Fribourg (h / 2, minimum 4,0 m) |
|---|---|---|
| 6,0 m | 3,00 m | 4,00 m |
| 9,0 m | 3,00 m | 4,50 m |
| 12,0 m | 4,00 m | 6,00 m |
| 15,0 m | 5,00 m | 7,50 m |
Several cantons also grant an index bonus for buildings with very high energy performance (Minergie, CECB A/A). The specification proposes +5 % or +10 %: on 1'000 m² with an IBUS of 0.60, a 10 % bonus raises the determining floor area from 600 m² to 660 m². The percentage, the standard required and the combination with other exemptions vary: ask the permit office.
How to calculate in 3 steps the exact buildable potential of a plot before making a purchase offer
The building rights calculation Swiss plot is done in three steps, which the tool chains together live:
- Find the determining land area (STd) in the land register and the municipal regulation: not all areas count (roads, forest, non-buildable zones). Example: 1'000 m².
- Read the index and its system in the municipality's regulation: IBUS and IOS (AIHC standard) or CUS and COS (old system, converted by the factor 1.20 to 1.25). Example: IBUS of 0.60 and IOS of 0.25, without bonus.
- Calculate the determining floor area, the usable area and the footprint. SPd = STd × index × (1 + bonus), that is 600 m²; the estimated usable living area at 80 % is 480 m²; the maximum footprint (STd × IOS) is 250 m².
Before making a purchase offer, compare this potential with the price of the land and the construction cost of the buildable area: see the overall budget calculator CFC 0 to 9 and the SIA 416 area and volume calculator. Also check easements, boundary distances, noise sensitivity levels and natural hazard zones, which can reduce the theoretical potential; the tool gives an order of magnitude, not a planning certificate.
Frequently Asked Questions on the IBUS, the CUS and Building Rights (FAQ)
1. What is the difference between the IBUS and the former CUS?
The gross land use index (IBUS) of the AIHC intercantonal agreement is the ratio between the sum of all floor areas and the determining land area. It counts walls and floor areas within the meaning of SIA 416, whereas the former land use coefficient (CUS) of many regulations generally excluded external walls, certain landings or non-habitable attics. On 1'000 m² of land, an IBUS of 0.60 gives a determining floor area of 600 m², and the IOS of 0.25 a footprint of 250 m².
The exact definition of the determining area depends on the canton that adopted the AIHC and on the municipal regulation: read the definition applicable to your plot.
2. What factor allows a CUS to be converted into an IBUS?
The specification uses a customary factor of 1.20 to 1.25: a CUS of 0.50 corresponds to an IBUS of 0.600 to 0.625, that is 600 to 625 m² of determining area on 1'000 m². In the other direction, an IBUS of 0.60 equals a former CUS of 0.48 to 0.50.
This factor is an order of magnitude: it was not checked in the cantonal texts. A municipality that switches to the IBUS recalculates its index to keep the building rights; only the municipal regulation in force prevails.
3. Is an index bonus granted for a Minergie building?
Several cantons grant a land use bonus for high-energy-performance buildings (Minergie, CECB A/A). The specification proposes +5 % or +10 %: on 1'000 m² with an IBUS of 0.60, a 10 % bonus raises the determining floor area from 600 m² to 660 m², that is about 528 m² of usable area (80 %).
The principle, the percentage, the standard required and the conditions vary by canton and municipality; the tool's percentages were not checked. Ask the permit office whether a bonus exists and how it combines with other exemptions.
Indicative information based on the AIHC intercantonal agreement; it replaces neither the municipal regulation nor the information from the permit office.
