Aller au contenu
Website
🧭 Trade guides 260 guides 12 sections

Organize your company

The six-pillar method for a Swiss construction SME: management, MSST standardisation, team, site, sales, cash flow. Plus the trade-by-trade and canton-by-canton MSST system.

  • 260guides
  • 12sections
  • 323pages in other sections
  • 78hub tools

🧭 Management 8

Management

Organising Your Construction SME to Run Without the Boss: Governance, Delegation, and Executive Autonomy in Switzerland

Governance method, delegation, and rituals to run a Swiss construction SME of 5 to 50 employees without relying on the owner day to day.

Management

The 5 Weekly Vital Figures for a Construction Business

Manage your construction SME with 5 weekly indicators: cash flow, productive hours, site variances, and CFST compliance in Switzerland.

Management

Civil and Criminal Liability of the Swiss Business Owner: Making the Delegation of Authority Valid

Organising delegated authority in Swiss construction SMEs: civil liability limits, Swiss Criminal Code rules and CFST directive requirements.

Management

Preparing Your Company to Run for 4 Weeks without the Boss (or for a Handover)

Organise a Swiss construction SME to run for 4 weeks without the owner or prep a business transfer. Governance, CFST 6508 and delegation.

Management

Building a 1-Page Strategic Plan for a Construction Company

Steer your Swiss construction SME with a 1-page strategic plan: governance, cash flow, CFST 6508 safety, and profitable construction sites.

Management

Swiss SME Risk Register and Business Continuity Plans

Swiss method to set up the risk register and business continuity plan of a construction SME with 5 to 50 employees under CFST 6508 directive.

Management

Management Rituals: The 45-Minute Weekly Meeting Without Fluff

Run your weekly management meeting in 45 minutes: clear method for Swiss construction SMEs, priority arbitrations, cash flow and CFST 6508 directive.

Management

Escaping Permanent Operational Firefighting in a Construction SME with 5 to 50 Employees

Method to stop firefighting in Swiss construction SMEs: governance, delegation, CFST 6508 directive, and rigorous construction site management.

📋 Standardize 8

Standardize

MSST System Under CFST Directive 6508: Standardising Procedures and Quality in Construction Firms

Standardise your building SME under CFST Directive 6508. MSST systems, job descriptions, and methods to secure margins on Swiss construction sites.

Standardize

Organise a Construction SME Server or Cloud Tree Without Losing Documents

Structure your Swiss construction firm's server and cloud: standardised folder tree, LPD compliance, and an end to lost documents on site.

Standardize

Team Self-Inspection Before Site Clearance: Aiming for Zero Rework

Team self-inspection protocol before site clearance in Switzerland. Standardise internal checks, protect your margin and avoid rework trips.

Standardize

Deploying QR Codes on Machinery, Distribution Boxes and Vans

Standardise inventory, machine maintenance and safety compliance with QR codes in your Swiss construction SME according to CFST 6508.

Standardize

Directive CFST 6508 Explained to Construction SMEs: Industry Solutions

CFST 6508 guide for Swiss construction SMEs: MSST implementation, industry solutions and accident prevention under art. 82 LAA.

Standardize

Drafting Visual Operating Procedures Understood by Multilingual Teams

Standardise visual operating procedures on Swiss construction sites for multilingual teams. MSST compliance, CFST 6508 directive, and fewer defects.

Standardize

5S Method Applied to the Warehouse and Service Vans

Standardise construction warehouses and vans in Switzerland using the 5S method and CFST 6508. Cut wasted time and secure your operations on site.

Standardize

Solving Recurring Errors with the 5 Whys and Pareto

Eliminate recurring non-conformities in Swiss construction SMEs using the 5 Whys method and the Pareto chart in line with directive CFST 6508.

👷 Team 8

Team

Empowering Foremen, Developing Versatility and Discipline on Swiss Construction Sites

Practical guide for Swiss building SMEs: empower site foremen, build on-site versatility, master discipline and secure CFST 6508 compliance.

Team

Supervising Minor Apprentices on Construction Sites: Dangerous Work and Accompanying Measures

Supervising minor apprentices on Swiss construction sites, dangerous work, accompanying measures and MSST system according to CFST directive 6508.

Team

The 5 Levels of Progressive Site Delegation

Frame site delegation in Switzerland: 5-level method, setup under art. 5 OTConst and CFST 6508 directive for SME foremen and site teams.

Team

Short Annual Reviews and Zero-Defect Quality Bonuses

Structure your short annual reviews and zero-defect team bonuses in the Swiss construction sector. A practical method for SMEs in French-speaking…

Team

Fast-Track Safety Onboarding for New or Temporary Workers (Day 1 to 30)

Induction protocol, safety and Day 1-30 follow-up for temporary or permanent workers in French-speaking Swiss building SMEs under CFST 6508 and art.…

Team

Building a Skills Matrix and Eliminating Single Key Persons

Eliminate single-key-person dependency in your Swiss construction SME with the versatility skills matrix and the CFST 6508 MSST safety system.

Team

Turning a Skilled CFC Worker into an Autonomous Foreman

Turn a CFC worker into an autonomous foreman on Swiss construction sites: practical method, crew management and CFST 6508 compliance.

Team

Managing Delays, Repeated Absences, and Crew Conflicts: From Review to Formal Warning

Managing repeated delays, unexcused absences, and team conflicts in Swiss construction SMEs: review interview, paper trail, and formal warning.

🏗️ Site 8

Site

Internal Site Preparation and Zero-Bottleneck Logistics: A Practical Method for Swiss Contractors

Internal site preparation and logistics for Swiss contractors: CFC workflow, SUVA safety prevention, and profit margin control.

Site

Eliminating Unbilled Supplier Runs

Stop unbilled supplier runs in Swiss construction SMEs: supply-chain methods, CHF cost control, and CFST 6508 occupational health and safety…

Site

30-Minute Internal Site Review: Actual vs Quoted Costs

Run a 30-minute Swiss post-site review: track actuals vs quote, safeguard margins, and control labor hours without administrative drift.

Site

The Right and Duty to Say STOP: SUVA Vital Rules and LAA Prevention Obligations

Exercising the right to say STOP on Swiss sites under art. 82 LAA and art. 5 OTConst. SME responsibilities, vital rules, and operational risk…

Site

On-Site Escalation Rules: Who Decides What up to 500, 2,000 and 10,000 CHF

Financial escalation protocol for Swiss construction SMEs. Delegation matrix at 500, 2,000 and 10,000 CHF: protected margins and CFST compliance.

Site

Managing Power Tool Fleets, Machinery, and Periodic Inspections

Organise your power tools and statutory machine inspections for Swiss SMEs in line with art. 82 LAA, art. 3 OPA, and CFST Directive 6508.

Site

Last Planner Method Adapted for Swiss Craftsmen

Apply the Last Planner method in Switzerland: collaborative planning, lifting CFST 6508 constraints, and safeguarding margins on the construction…

Site

Loss-Free Handover Between Estimator and Site Manager

Loss-free handover protocol from quote to execution for Swiss building SMEs. Protect margins, OTConst health and safety, and site planning.

🎯 Sales 8

Sales

Client Screening, Go/No-Go, and Margin Protection: The Sales Process of a Swiss Construction SME

Bid screening, Go/No-Go matrix, floor pricing, and firm follow-ups: protect your Swiss construction SME's margin without discounting.

Sales

Systematising Recommendation and Local Review Requests upon Site Completion

How to systematically collect local reviews and recommendations upon site completion to protect profit margins for Swiss construction SMEs.

Sales

Managing Your Order Book in Actual Production Weeks

Manage your Swiss SME order book in actual production weeks. Control workload, protect margins, and secure your site schedules.

Sales

The Go/No-Go Grid to Complete Before Spending 10 Hours on Pricing

Protect your Swiss SME's margins. Screen calls for tenders in 15 minutes with a proven Go/No-Go matrix before spending hours on pricing.

Sales

Calculating Your Floor Price and Negotiating with Concessions: Deadlines, Advance Payments, Variants

Calculate your floor price and negotiate trade-offs in Switzerland: advance payment, schedule, and technical variants to safeguard your operating…

Sales

Why Turning Down Bad Construction Sites Boosts a Swiss SME's Net Profit

Find out why turning down bad construction sites increases a Swiss SME's net profit. Go/No-Go method, profit margins, and cash flow protection.

Sales

How to Pace Quote Follow-Ups Without Slashing Prices

Structure quote follow-ups without rash discounts. Method for Swiss contractors: preserve your margin, lock in the schedule and qualify the offer…

Sales

Checking the Solvency of a Client or Property Management Firm: Debt Enforcement Register and Zefix

Check the solvency of a client or property management firm in Switzerland: Zefix checks, debt enforcement extracts, and securing advance payments.

💰 Money 8

Money

Managing Cash Flow, Overheads and Fiduciary Relations for a Swiss Construction SME

Manage your 13-week cash flow, fixed overheads and fiduciary closing for Swiss construction SMEs. Actionable practical methodology in CHF.

Money

Why a Firm Profitable on Paper Goes Bankrupt in Switzerland: Working Capital Gaps

Why a profitable Swiss SME goes bankrupt: master working capital requirement gaps, site cash flow, and advance payments in CHF.

Money

Annual Administrative Survival Calendar for Swiss Construction Owners

Annual admin calendar for Swiss construction SMEs: tax closing, joint statements, VAT, LPP, and safety compliance under Swiss law. Stay ahead of…

Money

Closing Your Month and Sending Your Accounts to the Fiduciary in 45 Minutes

Standardise your monthly closing in 45 minutes: error-free document handover to your fiduciary and efficient management of your construction SME.

Money

Mastering and Allocating Fixed Overheads Across Productive Crews

Swiss method to allocate fixed overheads across productive construction crews. Protect your hourly margin and safeguard your cash flow.

Money

13-Week Rolling Cash Flow Forecast in 20 Minutes Every Monday

Manage your Swiss construction SME's 13-week rolling cash flow in 20 minutes every Monday. Anticipate working capital and safeguard liquidity.

Money

Provisioning 8,1 % VAT (Effective Method or SNTF), 13th Month, AVS, SUVA and LPP

Swiss provisioning method for construction SMEs: 8.1% VAT, social security contributions, 13th month and LPP without jeopardising operating cash flow.

Money

Cash Purchase, Leasing or Long-Term Rental for Vehicles and Plant

Cash purchase, leasing or long-term rental for Swiss construction SME fleets. Financial methodology and cash-flow trade-offs.

🗺️ By trade and by canton (147 pages) 21

By trade and by canton (147 pages)

Tiling

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Carpentry

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Heating ventilation

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Steel construction

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Roofing

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Facade rendering

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Demolition

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Electricity

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Waterproofing

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Windows and doors

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Metalwork

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Masonry

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Joinery

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Building cleaning

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Exterior painting

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Interior painting

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Plastering

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Floor coverings

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Sanitary

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Metal construction

MSST system and organization

VDGEVSFRNEJUBE
By trade and by canton (147 pages)

Earthworks

MSST system and organization

VDGEVSFRNEJUBE

⚙️ Calculators 24

Calculators

Tool: Buying, Leasing, or Renting Construction Machinery in Switzerland

Decide how to acquire your construction machinery in Switzerland. Compare net costs, utilisation thresholds, and cash flow impact with 8.1% VAT.

Calculators

5 Whys Analysis Generator for Incidents and Non-Conformities

Analyze the root causes of site defects in Switzerland, quantify rework costs in CHF and stop recurrence using the BOSS method.

Calculators

Express Audit for Machinery, Ladders and PPE (OPA / SUVA)

Manage periodic checks on machines, ladders and PPE under art. 82 LAA and art. 3 OPA. Maintain a Swiss SUVA-compliant equipment inventory.

Calculators

Calculator for Site Working Capital Requirement and Security Reserve in CHF

Calculate the working capital requirement for your sites and your cash reserve in CHF according to standard SIA 118 practices and Swiss law.

Calculators

Monthly Provisions Calculator (8,1 % VAT or Net Tax Debt, 13th-Month Salary, SUVA, LPP)

Calculate monthly provisions for Swiss construction SMEs: 8,1 % VAT or net tax debt, 13th-month salary, SUVA, and LPP. Secure your firm's cash flow.

Calculators

Annual Deadline Calendar Generator for Swiss SMEs & 45-Minute Fiduciary Checklist

Generate your annual VAT, AVS, LPP, and SUVA deadline calendar in .ics format. Prepare your closing with our 45-minute Swiss fiduciary checklist.

Calculators

Interactive Quote-to-Execution Handover Check-up (Go Site)

12-point Go Site tool for Swiss SMEs. Secure your margin, OTConst safety plan, and SIA 118 compliance before site execution starts.

Calculators

MSST Liability and Compliance Checker in 10 Points (CFST 6508)

Check your Swiss SME's MSST liability and compliance in 10 points under CFST 6508. 100% in-browser assessment with no server data transfer.

Calculators

Owner Construction Site Opportunity Cost Calculator

Calculate the financial impact in CHF of construction site hours worked by the owner instead of steering their Swiss construction SME.

Calculators

Hidden Cost Calculator for Supplier Round Trips and Material Shortages

Calculate the hidden cost of supply shortages and unplanned wholesaler runs for your Swiss construction company.

Calculators

5-Level Delegation Matrix Generator (Foreman, Site Manager, Office)

Calculate autonomy milestone dates for foremen and site managers in Switzerland. Tool compliant with CFST 6508 and OTConst with zero data sent.

Calculators

Safety Induction Programme for New Hires and Temporary Workers (Day 1)

Safety induction protocol for permanent and temporary staff under CFST 6508 and OTConst. Day 1, Week 1 and Month 1 checklist for Swiss SMEs.

Calculators

File Naming and Construction Site Folder Structure Generator

Structure construction site folder trees and file naming for Swiss SMEs. Standardise office and field filing in compliance with CFST 6508 directive.

Calculators

Calculator for Annual Losses from Site Returns and Van Disorder

Calculate annual losses from unplanned return trips and messy construction vans. 5S method and organisation compliant with CFST 6508.

Calculators

Floor Price Calculator and Negotiation Trade-Off Matrix

Calculate your floor price excl. VAT and secure your Swiss site negotiations using the trade-off matrix to protect your margin.

Calculators

Construction SME Risk Register Calculator (Probability × Impact in CHF)

Assess your Swiss construction SME's annual financial exposure under CFST 6508 and protect your operating margin in CHF with our risk register tool.

Calculators

45-Minute Management Meeting Agenda and Minutes Generator

Run your weekly management meeting in 45 minutes flat. Free Swiss tool, internal cost control, and governance for construction SMEs.

Calculators

Interactive Go / No-Go Scorecard Before Pricing a Tender

Assess a tender's profitability in 2 minutes before pricing it. Interactive Go / No-Go scorecard for Swiss construction SMEs and site managers.

Calculators

Escalation Protocol and Financial Decision Thresholds Simulator

Set your financial delegation thresholds and apply the CFST 6508 safety STOP rule to protect your site margins in Switzerland. Free online simulator.

Calculators

Client Solvency Checker (Debt Enforcement Register, Zefix, Advance Payments Schedule)

Check client solvency using the debt enforcement register and Zefix. Calculate secure advance payments schedules for Swiss construction SMEs.

Calculators

Follow-Up Sequence Planner for Open Quotes (D+3, D+10, D+21)

Schedule follow-ups on your quotes in Switzerland. Calculate your weighted order book and safeguard building firm margins without wasting time.

Calculators

Autonomy Diagnostic: The 4-Week Boss Absence Test

Assess your Swiss construction SME's autonomy if the boss is away for 4 weeks: governance, MSST safety, and cash management.

Calculators

Checker for Dangerous Work and Supervision of Construction Apprentices

Check age limits and legal rules for dangerous work by Swiss building apprentices under OLT 5, CFST 6508 and the Labour Act.

Calculators

15-Minute Individual Appraisal Tool for Workers or Foremen

Run structured 15-minute appraisals for your construction workers and foremen. Weighted 8-criterion matrix compliant with CFST 6508 and Swiss law.

📄 Templates 24

Templates

Downloadable Template: Escalation Rules and STOP Rule Poster (PDF)

Download the PDF poster for financial decision thresholds and site STOP rules. Swiss framework for foremen, project managers, and directors.

Templates

Downloadable Template: 5S Van and Depot Checklist (PDF)

Download the free 5S PDF template for Swiss construction vans. Standardise vehicle stocking, cut tool loss, and secure your transport operations.

Templates

Downloadable Template: Accounting Preparation Binder (PDF)

Download the accounting prep binder template and deadline schedule for Swiss construction SMEs. Streamline meetings with your fiduciary.

Templates

Downloadable Template: Internal Handover File (PDF)

Download the internal handover file from quote to execution for Swiss construction SMEs. Launch checklist compliant with OTConst and SIA 118.

Templates

Downloadable Template: D-1 Loading Preparation Sheet (PDF)

Download the Excel supplier run log and D-1 loading sheet. Eliminate supply shortages and unplanned merchant trips on Swiss construction sites.

Templates

Downloadable Template: SME Director Job Description (PDF)

Download the time log and job description template for Swiss construction SME directors. LTr legal framework and opportunity cost analysis.

Templates

Downloadable Template: 40-Point Autonomy Audit Checklist (PDF)

Download the 40-point autonomy audit checklist for Swiss construction SMEs. 4-week owner absence test, business governance and MSST safety.

Templates

Downloadable Template: Weighted Annual Appraisal Form (PDF)

Download our PDF annual appraisal template for construction workers and team leaders in Swiss SMEs. Fast, targeted 15-minute interviews.

Templates

Template Download: Signed Delegation Charter (PDF)

Download our 5-level progressive delegation charter for site managers and foremen in Switzerland. Build accountability and autonomy on site.

Templates

Downloadable Template: Margin Defence Guide (PDF)

Download the floor price and negotiation trade-offs Excel workbook to protect your Swiss construction SME's margins.

Templates

Downloadable Template: Signed Safety Induction Booklet (PDF)

Download the Day 1 safety induction booklet for new hires and temporary staff in Switzerland. Compliant with CFST 6508, art. 82 LAA and art. 5…

Templates

Downloadable Template: Simplified MSST Manual for SMEs (PDF)

Download the 10-point MSST manual under directive CFST 6508. A structured PDF template to ensure SUVA compliance for Swiss building and civil…

Templates

Downloadable Template: Plan B Matrix (PDF / Excel)

Download the Plan B matrix and risk register for Swiss construction SMEs. Excel and PDF template to safeguard your governance, margin, and jobsites.

Templates

Downloadable Template: Office and Field Filing Charter (PDF)

Download the standard filing plan and folder tree for Swiss construction SMEs. Standardise your construction site files from the office to the field.

Templates

Template to Download: Corrective Action Form A4 (PDF)

Download the A4 PDF 5 Whys corrective action sheet for Swiss construction SMEs. Standardise your non-conformity analysis under directive CFST 65.

Templates

Downloadable Template: Investment Assessment Grid (PDF / Excel)

Download our machinery buy, lease or rent assessment grid for Swiss SMEs. Free Excel & PDF templates to secure your construction site investments.

Templates

Downloadable Template: Apprentice Dangerous Work Authorisation and Tracking Sheet (PDF)

Download the PDF apprentice dangerous work tracking sheet in Switzerland. On-site supervision, SUVA compliance rules and CFST 6508 directive.

Templates

Downloadable Template: Weekly Management Routine Form (PDF)

Download the PDF template for the weekly management routine in Swiss construction SMEs: timed agenda, key metrics, and an action tracking register.

Templates

Downloadable Template: Payment Guarantee Request (PDF)

Download the PDF client solvency checklist and advance payment schedule for Swiss construction SMEs. Protect your cash flow and margins.

Templates

Downloadable Template: Reserve Accounts Spreadsheet (PDF)

Download our reserve accounts Excel template for Swiss construction SMEs: monthly provisions for 8.1% VAT, 13th-month pay, and social security…

Templates

Downloadable Template: Inventory and Inspection Register (Excel / PDF)

Download the plant, machinery, ladder and PPE inventory & inspection register for Swiss SMEs. Compliant with OPA, CFST 6508 and SUVA requirements.

Templates

Downloadable Template: Construction Site Qualification Grid (PDF)

Download our Excel Go/No-Go grid to qualify tenders in Switzerland, filter out loss-making bids and protect your construction SME's margin.

Templates

Downloadable Template: Phone scripts and follow-up emails (PDF)

Download the Excel workbook for following up open quotes at D+3, D+10, and D+21. Protect your Swiss construction SME margins under the Code of…

Templates

Download Template: 13-Week Cash Flow Spreadsheet (Excel)

Download the 13-week cash flow Excel template for Swiss construction SMEs. Manage site WCR and safety reserves to prevent cash shortfalls.

🚨 Crisis files 6

Crisis files

Serious Construction Site Accidents and Criminal Liability: How MSST Proof Protects Company Directors

Serious construction site accidents and criminal liability in Switzerland: establishing MSST proof under CFST 6508 and OTConst to protect company…

Crisis files

Immediate Site Shutdown by SUVA or Cantonal Labour Inspectors: Emergency Procedure, Lifting the Order, and Costs

Swiss emergency protocol for SUVA or cantonal labour stop-work orders: crisis response, lifting the shutdown, and managing costs.

Crisis files

Cascade Surprise Inspections (Joint Commission, SUVA, FTA for VAT): The Master File That Concludes the Audit

Crisis protocol for joint commission, SUVA or FTA site inspections: organisation, master file and full compliance for Swiss construction SMEs.

Crisis files

Illiquidity Crisis Despite a Full Order Book and Risk of Over-Indebtedness: 30-Day Emergency Cash Flow Plan

30-day emergency plan for Swiss construction SMEs: curb illiquidity with a full order book, prevent over-indebtedness, and secure cash flow.

Crisis files

Coordinated Resignation of a Site Manager with Team Poaching or Client Solicitation: Response and Retaking Control within 24 Hours

Respond within 24h and build a 30-day plan after a coordinated site manager walkout in Swiss construction. Employer protocol and legal framework.

Crisis files

Sudden Incapacity or Hospitalisation of the Business Owner: 72-Hour Survival Protocol

Swiss 72-hour emergency protocol when a construction SME owner is suddenly hospitalised: cash flow, site safety and business continuity.

⚖️ Comparisons 5

🎓 Campus tracks 6

Other guide sections

📥 Ready-to-use pack · free

Download the document

The file is displayed on screen right away and we also send it to you by e-mail.

Your address is used to send you this file. See our privacy policy.