SIA 248 / SIA 271/1 Tool 6.23 Online

Tiling Calculator (Adhesive, Grout, Large Formats) & SIA 248 Standard

Moisture checker CM max (2% / 0.5 / 0.3%), double bonding & substrate reservation.

Interactive tool

Values from the specifications, SIA 248 not consulted. Moisture thresholds CM (cement 2,0 / 1,8; anhydrite 0,5 / 0,3, confirmed by a German table), the 900 cm² rule for double buttering and adhesive consumption: specifications, not verified in the standard. Joint formula: exact (litres per m² = (L + l) / (L × l) × e × j, × 1,60 kg/l). Assumptions of the tool: automatic choice of trowel (12 mm with double buttering, otherwise 6 mm up to 15 cm sides and 8 mm beyond); liquid waterproofing of 2 mm dry at 1,5 kg/m² per mm (SIA 271/1 'Abdichtungen von Innenräumen' has existed since May 2025).

A Tiling: adhesive, grout, tiles and substrate moisture

m²
cm
cm
mm
mm
% CM
ml

Verdicts and quantities

Adhesive mortar
Grout
Tiles to order
Liquid waterproofing under tiles (SEL)

Grout: ((L + l) / (L × l)) × thickness × joint width × 1,60, in mm and kg/m². Adhesive: 6 mm trowel about 2,5 kg/m², 8 mm 3,2, 10 mm 4,0, 12 mm with double-buttering 5,5 to 6,5.

Embed this calculator on a website page

Paste this code into the page, or write [outil code="6.23"] in the content of a page on the site.

📄 Files and templates linked to this tool (free)

Move from calculation to full management

Keep your references at hand, then automate them in your quotes, bids and final statements.

⚡ Automate this calculation in our ERP / Soumission software (Trial)

Technical reference guide

Standard SIA 248 (Tiling): maximum CM moisture content of the screed and the double-buttering obligation (from 30x30 cm)

The screed moisture content before laying tiles according to standard SIA 248 is measured with the carbide moisture meter: on a cement screed (CT), the threshold is 2,0 % CM without underfloor heating and 1,8 % CM with underfloor heating; on an anhydrite screed (CAF), 0,5 % CM without heating and 0,3 % CM with underfloor heating, with sanding and a bonding primer or an epoxy barrier under a cement-based tile adhesive. With the 0,4 % CM measured in the example, a cement screed is ready to be tiled.

The double-buttering consists of spreading the adhesive on the substrate with a notched trowel and then buttering the back of the tile: it avoids voids under the tile. The specifications prescribe it as soon as the format exceeds 30 × 30 cm (900 cm²), on underfloor heating or outdoors; with the 60 × 60 cm tile of the example, it is prescribed.

Note on the text of the standard. SIA 248 «Tiling — Coverings in ceramic, glass and asphalt tiles» (2016 edition, paid) was not consulted: the CM thresholds and the 900 cm² rule are those of the specifications. The thresholds for cement (2,0 and 1,8) and anhydrite (0,5 and 0,3) are confirmed by a table from the German parquet association. For drying and heating up the screed, see the SIA 251 screed tool.

Why you should never bond directly with cement tile adhesive on an anhydrite screed without a suitable primer

The surface of an anhydrite screed is covered with a thin friable layer that must be sanded and dusted off before any bonding. The calcium sulphate of the substrate can also react with the cement of the tile adhesive in the presence of moisture, forming swelling crystals (ettringite) that break down the adhesive: this is the reason for a bonding primer or an epoxy barrier, or for a tile adhesive suited to calcium-sulphate-based substrates. On underfloor heating, the 0,3 % CM threshold is added to this precaution.

Note on the text of the standard. This explanation is a general principle of the trade, not taken from SIA 248; the adhesive manufacturer's technical sheet states the primer to be used.

Formula for calculating the consumption of C2S1 adhesive (25 kg bags) and grout per m2 according to the tile format

The tile adhesive consumption in kg/m2 with double-buttering depends on the size of the trowel: the specifications assume about 2,5 kg/m² with a 6 mm trowel, 3,2 kg/m² with 8 mm, 4,0 kg/m² with 10 mm and 5,5 to 6,5 kg/m² with 12 mm and double-buttering. For 65 m² with a 60 × 60 cm tile (double-buttering, 12 mm trowel), 358 to 423 kg of tile adhesive are needed, i.e. 15 to 17 bags of 25 kg.

The formula for tile grout consumption in kg/m2 is exact: consumption = ((L + l) / (L × l)) × thickness × joint width × 1,60, with L, l, the thickness and the joint in millimetres, and 1,60 kg/litre for the bulk density of the mortar. It is equivalent to the volume of grout per square metre, counted tile by tile.

Grout consumption according to tile format for 65 m²
Format and thicknessJointConsumptionFor 65 m²
10 × 10 cm, 7,0 mm3,0 mm0,672 kg/m²43,7 kg
30 × 30 cm, 8,0 mm3,0 mm0,256 kg/m²16,6 kg
60 × 60 cm, 9,5 mm3,0 mm0,152 kg/m²9,9 kg
60 × 120 cm, 10,0 mm2,0 mm0,080 kg/m²5,2 kg
120 × 120 cm, 12,0 mm2,0 mm0,064 kg/m²4,2 kg

The minimum joint width for large-format rectified tiles is set by the tile manufacturer and by the layout plan: a rectified tile, with straight-cut edges, allows a narrower joint than a non-rectified tile. The specifications give no minimum width and the tool sets none: follow the manufacturer's sheet. The narrower the joint, the less grout is consumed.

Note on the values. The adhesive consumptions are those of the specifications, not verified in SIA 248; the automatic choice of trowel (12 mm with double-buttering, otherwise 6 mm up to 15 cm per side and 8 mm beyond) is a rule of the tool. The grout formula is exact. Waste is 7 % for straight laying and 12 % for diagonal laying.

Standard SIA 271/1 in the bathroom and walk-in shower: where is liquid-applied waterproofing under tiles (SEL) mandatory?

The liquid waterproofing under tiles SEL bathroom SIA 271/1 is a waterproofing applied in layers under the tiles. Standard SIA 271/1 «Abdichtungen von Innenräumen» (waterproofing of interior rooms), published in May 2025, covers the waterproofing of bathrooms and showers in dwellings, and possibly kitchens; commercial wet rooms are classified separately. The specifications regard waterproofing under tiles as recommended, even mandatory, for a walk-in shower or a bathroom.

For 65 m² of shower or bathroom, with 2 mm dry and 1,5 kg/m² per mm, the tool counts 195,0 kg of liquid waterproofing and 12,0 lm of corner tape for 12 lm of corners and joints. An outdoor terrace or a balcony does not fall under this standard.

Note on the text of the standard. SIA 271/1 was not consulted: where waterproofing is mandatory, by zone and moisture load, is a matter for the text of the standard. The minimum dry thickness of 2 mm for flexible mineral slurries comes from a Mapei document; the consumption of 1,5 kg/m² per mm is an assumption of the tool, to be replaced by the product sheet. For the waterproofing of a flat roof, see the SIA 271 tool. ⚡ Price your tiling in Soumission

Frequently Asked Questions about Tiling, Adhesive, Grout and Waterproofing (FAQ)

1. What is the maximum screed moisture before laying tiles?

On a cement screed, the threshold is 2,0 % CM without underfloor heating and 1,8 % CM with underfloor heating. On an anhydrite screed, it is 0,5 % CM without heating and 0,3 % CM with underfloor heating, with sanding and a bonding primer or an epoxy barrier under a cement-based tile adhesive. With the 0,4 % CM measured in the example, the substrate is fit for laying on a cement screed.

These thresholds are those of the specifications; those for cement (2,0 and 1,8 % CM) and anhydrite (0,5 and 0,3 % CM) are confirmed by a table from the German parquet association. Standard SIA 248 («Tiling», 2016 edition, paid) was not consulted.

2. What adhesive consumption, and when is double-buttering needed?

Double-buttering (buttering the tile and spreading the adhesive on the substrate with a notched trowel) is prescribed by the specifications as soon as the format exceeds 30 × 30 cm (900 cm²), on underfloor heating or outdoors. The 60 × 60 cm tile of the example is subject to it: 12 mm trowel with double-buttering, i.e. 5,5 to 6,5 kg/m², so 358 to 423 kg and 15 to 17 bags of 25 kg for 65 m². For a 30 × 30 cm tile without heating, the 8 mm trowel consumes 3,2 kg/m², i.e. 9 bags.

The consumptions (2,5 / 3,2 / 4,0 kg/m² for the 6, 8 and 10 mm trowels, 5,5 to 6,5 kg/m² for 12 mm with double-buttering) and the 900 cm² rule are those of the specifications, not verified in SIA 248. The automatic choice of trowel according to format is a rule of the tool.

3. How do you calculate grout consumption, and where is waterproofing under tiles mandatory?

Grout consumption is ((L + l) / (L × l)) × thickness × joint width × 1,60, with L, l, the thickness and the joint in millimetres, and 1,60 kg/litre for the bulk density of the mortar: 0,152 kg/m² for 60 × 60 cm tiles, 9,5 mm thick and a 3,0 mm joint, i.e. 9,9 kg for 65 m². For a walk-in shower or a bathroom, standard SIA 271/1 «Abdichtungen von Innenräumen», published in May 2025, covers the waterproofing of interior rooms: with 2 mm dry and 1,5 kg/m² per mm, the tool counts 195,0 kg of liquid waterproofing for 65 m².

The grout formula is exact. The text of SIA 271/1 was not consulted: the minimum dry thickness of 2 mm for flexible mineral slurries comes from a Mapei document, and the consumption of 1,5 kg/m² per mm is an assumption of the tool, to be replaced by the product sheet.

Indicative information prepared from the tool's specifications; it replaces neither standard SIA 248, nor SIA 271/1, nor the data sheet of the adhesive and tile manufacturer.