Tenders, SIA 451 & Building Codes
Spot public contracts, open architects' tender files (SIA 451, CRB), read BIM models and find the right code in the CFC, eCCC-Bât or CAN. Five tools to prepare your bids faster.
The 5 tools of the pillar
Radar Marchés Publics (Simap & Cantons)
The construction calls for tenders published on Simap and by the cantons, to be filtered by canton and by trade.
Simap · AIMP Tool 1.2 OnlineSIA 451 Converter (.crbx / .01s)
Open a tender file .crbx or .01s and export it to Excel or PDF.
SIA 451 · .crbx · .01s Tool 1.3 OnlineBIM (IFC) Reader & Quantity Extractor
Open an IFC model in your browser and automatically extract areas, volumes and quantities by object class (walls, slabs, windows…).
IFC · SIA 2051 Tool 1.4 OnlineCFC ↔ eCCC-Bât ↔ CAN Translator
Find the equivalent code in the CFC, the eCCC-Bât, the CAN and the ACIP chapters with a single search.
CFC · eCCC-Bât · CAN Tool 1.5 OnlinePublic Procurement Thresholds (AIMP) by Canton
Compare the procedure thresholds (direct award, invitation, open procedure) by canton and prepare the Simap file.
AIMPMove from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
