Interior Doors Configurator, EI30 Fire Doors (AEAI) & Dimensions (SIA 343)
Configurator for EI30 fire doors, tolerated functional clearances & Rw acoustics.
Interactive tool
Allowances from the specifications, SIA 343 not consulted. Additions of 10 to 12 cm in width and 5 to 6 cm in height for a wrap-around timber frame: specifications, not verified; no values for other types of frame (manufacturer's data sheet). Clear opening of 80 cm: SIA 500, confirmed by a summary from the canton of Zurich. Gap under the door = flow rate / (velocity × width), the length of the gap being taken as equal to the clear opening (assumption). EI 30 requirement: specifications; AEAI directive 15-15 (section 3.4) was not consulted and the requirement depends on the fire protection concept. R'w: 37 dB (SIA 181, according to a Swiss document) to 42 dB. The cited "SIA 382/5" could not be found.
A Door unit, masonry opening and clear passage
Rough opening and clear opening
- Dimensions of the rough opening to allow for
Opening = clear passage + 10 to 12 cm in width and + 5 to 6 cm in height for a wrap-around timber frame (specifications). The height is measured from the finished floor.
B Gap under the door and transfer air of the double-flow ventilation
Door undercut
- Free gap under the door
Section = flow / (3 600 × velocity); gap height = section / width. For 30 m³/h and a door of 80 cm: 10,4 mm at 1,0 m/s and 8,7 mm at 1,2 m/s (the specifications: 8 to 12 mm).
C AEAI fire and acoustic verdict
Requirements by location
A fire door approved by AEAI (VKF) is never planed on site; automatic door closer for plant rooms, cellars and car parks.
Embed this calculator on a website page
Paste this code into the page, or write [outil code="6.27"] in the content of a page on the site.
📄 File linked to this tool (free)
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Technical reference guide
Standard SIA 343 and SIA 500: correspondence table between rough opening width and clear passage (80 cm)
The calculation of the masonry opening for a clear door passage of 80 cm starts from the clear passage, that is, the free width once the door is open and the frame fitted. Standard SIA 500 «Barrier-free construction» (2009 edition) asks for a clear door width of at least 80 cm, with a threshold of 2,5 cm at most: this is confirmed by the summary of the Canton of Zurich. For a wrap-around timber frame fitted at the end of the works, the specifications add 10 to 12 cm in width and 5 to 6 cm in height:
| Clear opening (width × height) | Width of the rough opening | Height of the rough opening (above finished floor) |
|---|---|---|
| 80 × 200 cm | 90 to 92 cm | 205 to 206 cm |
| 80 × 210 cm | 90 to 92 cm | 215 to 216 cm |
| 90 × 210 cm | 100 to 102 cm | 215 to 216 cm |
| 100 × 210 cm | 110 to 112 cm | 215 to 216 cm |
Note on the values. The family of standards SIA 343 «doors and gates» exists (for example SIA 343.310 on reaction to fire and smoke); its text was not consulted. The allowances of 10 to 12 cm and 5 to 6 cm are those of the specifications, not verified. For a metal frame to be built in or surface-fixed and for a surface-fixed block frame, the specifications give no value: the tool refers to the manufacturer's sheet rather than inventing a dimension.
AEAI (VKF) guidelines for EI30 fire doors: VKF approval plate, door closer and automatic drop seal
The standard for EI30 fire doors in a Swiss apartment, SIA 343 and AEAI is read in two steps. The AEAI (VKF in German) keeps the register of fire protection products; an approved fire door carries a plate or a marking that refers to its approval. Fire protection guideline 15-15 requires, in item 3.4, that the openings in the elements forming a compartment be closed with fire-resistant closures, and that those kept open for operational reasons receive an automatic closing device. According to a Swiss municipality, each dwelling in a residential building forms a compartment, which explains the EI 30 flat entrance door.
The mandatory door closer for EI30 fire doors AEAI in the specifications applies to plant rooms, cellars and car parks: the door is EI 30 with an automatic door closer, and it is strictly forbidden to wedge it open, except with an electromagnetic holder linked to the fire detection system. The flat entrance door receives an intumescent seal all round and an automatic drop seal at the bottom of the door (a retractable seal, sold for example under the name «Planet»).
Note on the text of the guideline. The text of guideline 15-15 was not consulted; items 1 and 5 of 3.4 come from a sheet of a Swiss municipality. The obligation for an EI 30 flat entrance door is that of the specifications: it depends on the fire protection concept, the height of the building and the type of dwelling (a detached house is not a collective building). Have the requirement validated by the fire protection authority or the fire safety designer.
Why it is strictly forbidden to plane the bottom of a certified EI30 door on site
The approval of a fire door applies to the construction as it was tested: leaf, frame, seals, ironmongery and gaps. Planing the bottom of the leaf changes this gap and can deprive the door of its fire and smoke resistance; on site, no test makes it possible to check. A wrongly sized door is ordered again at the right dimensions, it is never corrected with a plane. For the partition that receives the door, see the drywall tool.
Acoustics of flat entrance doors (SIA 181: Rw 37 to 42 dB) and calculation of the gap under the interior door for ventilation (SIA 382/5)
The sound reduction index of a flat entrance door Rw 37 dB 42 dB measures how much of the noise from the stairwell the door stops. According to a Swiss building physics document, SIA 181 (2020 edition, art. 3.2.1.5) requires R'w + C of at least 37 dB for dwelling entrance doors; a Swiss table gives 42 dB, and the specifications cite 37 to 42 dB. The project's acoustic file sets the value to aim for; manufacturers commonly state 37 dB for an installed entrance door, and about 45 dB for a multilayer leaf (according to a Swiss document).
The gap under the door, undercut, double-flow ventilation SIA 382 concerns the interior communicating doors of a ventilated dwelling: the extract air passes under the door. The gap in millimetres equals the flow divided by 3 600, by the permissible velocity in the gap and by the width of the door. For a door of 80 cm:
| Transfer flow rate | Gap at 1,0 m/s | Gap at 1,2 m/s |
|---|---|---|
| 15 m³/h | 5,2 mm | 4,3 mm |
| 30 m³/h | 10,4 mm | 8,7 mm |
| 45 m³/h | 15,6 mm | 13,0 mm |
| 60 m³/h | 20,8 mm | 17,4 mm |
This gap is only permitted on a communicating door with no fire or acoustic requirement. On an EI 30 or acoustic door, it is forbidden: the air passes through a grille, an opening in the partition or another door. For the ventilation of the dwelling, see the SIA 382 ventilation tool.
Note on the standard. The «SIA 382/5» cited by the specifications could not be found: the SIA 382 series covers ventilation and air conditioning. The length of the gap is taken equal to the clear passage (assumption of the tool); the velocity of 1,0 to 1,2 m/s is that of the specifications. ⚡ Price your doors in Soumission
Frequently Asked Questions about Interior Doors, EI30 Fire Resistance and the Gap under the Door (FAQ)
1. What masonry opening should be allowed for a clear passage of 80 cm?
For a wrap-around timber frame fitted at the end of the works, the specifications add 10 to 12 cm in width and 5 to 6 cm in height to the clear passage: for 80 × 200 cm, the opening must be 90 to 92 cm wide and 205 to 206 cm high, the height being measured from the finished floor. The minimum clear passage is 80 cm of free width, with a threshold of 2,5 cm at most (SIA 500, according to the summary of the Canton of Zurich).
For a metal frame or a surface-fixed block frame, the specifications give no value: ask the manufacturer for the opening. The allowances of 10 to 12 cm and 5 to 6 cm are not verified; standard SIA 343 (family «doors and gates») was not consulted.
2. What gap under the door to transfer 30 m³/h of air from a double-flow ventilation?
The passage section is the flow divided by the air velocity: 30 m³/h at 1,0 m/s requires 83,3 cm², i.e. a gap of 10,4 mm under a door of 80 cm (at 1,2 m/s: 8,7 mm), which matches the 8 to 12 mm of the specifications. This solution is only permitted on an interior communicating door. It is forbidden on an EI 30 or acoustic door: the bottom of the door receives an automatic retractable drop seal and the air passes elsewhere.
The length of the gap is taken equal to the clear passage (assumption of the tool). The «SIA 382/5» cited by the specifications could not be found: the SIA 382 series covers ventilation and air-conditioning installations.
3. Must a flat entrance door, cellar door or boiler room door be EI 30, and with which door closer?
According to the specifications, the entrance door of an apartment is an EI 30 door approved by AEAI (VKF), with an intumescent seal all round, an automatic drop seal and sound insulation of R'w 37 to 42 dB; the door of a plant room, a cellar or an underground car park is an EI 30 door with an automatic door closer, which must not be wedged open except with an electromagnetic holder linked to the fire detection system. An approved door is never planed at the bottom on site: it would no longer comply with the test.
AEAI (VKF) fire protection guideline 15-15, item 3.4, requires fire-resistant closures in the elements forming a compartment and an automatic closing device for those kept open; according to a Swiss municipality, each dwelling in a building forms a compartment. The text of the guideline was not consulted: the exact requirement depends on the fire protection concept and the building. For acoustics, a Swiss building physics document gives R'w + C ≥ 37 dB (SIA 181, art. 3.2.1.5) and a Swiss table 42 dB.
Indicative information prepared from the tool's specifications; it replaces neither standards SIA 343, SIA 500 and SIA 181, nor the AEAI (VKF) fire protection guideline, nor the door's approval sheet.
