Skip to content
Website
ACIP · Art Construction Price Index CFC 211.5 ACIP chapter no. 5 2026 edition

CFC 211 Masonry prices in the canton of Valais — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Masonry (bricks, blocks, renders)” (CFC 211.5) for the canton of Valais. ACIP chapter no. 5 contains 1'457 entries, of which 1'349 are priced items in Swiss francs, excluding VAT (HT), spread over 90 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Valais, the regional ACIP coefficient is 0.95 (cantonal modifier −5 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 102.80 CHF/h on a daywork basis and a foreman or team leader 129.55 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker102.80CHF/h
  • Foreman / team leader129.55CHF/h
  • Helper83.90CHF/h
  • Apprentice51.80CHF/h
  • Regional ACIP coefficient0.95Valais

Prices of the key items of CFC 211 masonry in the canton of Valais

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.95; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Concrete blocks MAC-AB-0120 · Ordinary masonry in hollow concrete blocks, wall built simultaneously with the structural work, bricklaying with filled joints… m² 144.50 170.00 212.50 —
Insulation against walls and ceilings MAC-IC-0190 · Insulating boards fixed against the masonry, mineral fibre boards, glass fibre without vapour barrier, density… m² 50.25 59.15 73.90 —
Clay bricks MAC-BT-0320 · Standard masonry of blocks in fired clay bricks, wall built simultaneously with the structural work, bricklaying with… m² 113.45 133.50 166.85 —
Thermal insulation boards MAC-PA-0200 · Glass fibre boards, uncoated, single layer, laying with tight flat joints, bulk density approximately… m² 27.55 32.40 40.50 —
Calcium silicate bricks MAC-BS-0110 · Standard masonry of blocks in calcium silicate bricks, wall built simultaneously with the structural work, bricklaying with… m² 119.55 140.65 175.80 —
Mineral renders MAC-CI-0240 · Mineral render on walls, parapets and window breasts, regular rustic render, white facing, natural colour, per… m² 30.90 36.35 45.40 —
Special lintels MAC-LS-0170 · Installation of box lintels intended for a roller shutter or a blind, fitted with bearing heads, a housing for the… pc 376.70 443.20 553.95 —
Insulation at the base and top of walls MAC-IS-0230 · Soundproofing layers, laid on top of walls, in particular with a mortar bed, above a load-bearing wall… ml 30.10 35.45 44.30 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 5 (ACIP code shown); the family has 81 entries for the first item. The 1'349 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Valais)

Average hourly rate observed (skilled worker)
102.80 CHF/h
Regional ACIP coefficient
0.95
Range of the chapter's rates (from helper to foreman)
83.90 to 129.55 CHF/h
Hub reference agreement
National Agreement for the Structural Building Trades (CN)
  • Wage zone of the ACIP reference: Blue.
  • Reference employer charges: 34,9 % for structural work, 25,9 % for finishing work and building services; family allowance rate (CAF): 3,55 %.
  • Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Sion/Sierre/Martigny −5 %, Crans-Montana +12 %, Verbier +18 %, Zermatt +25 %.
  • The locality with the highest uplift in the canton in the reference is Zermatt (+25 %): the page's cantonal coefficient does not reflect it.

Source: ACIP 2026 workbook no. 5 (Masonry) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 211.4, 211.5, 211.6 (CFC) and 241, 314 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 211 masonry (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: masonry in the canton of Valais

What is the daywork hourly rate for masonry in the canton of Valais?

According to the 2026 ACIP price list, a skilled worker is charged 102.80 CHF/h on a daywork basis in the canton of Valais, a foreman or team leader 129.55 CHF/h and a helper 83.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 5 multiplied by the regional coefficient 0.95.

What is the regional ACIP coefficient for Valais?

The ACIP coefficient of Valais is 0.95 (cantonal modifier −5 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Concrete blocks” cost in the canton of Valais?

The ACIP item MAC-AB-0120 (Concrete blocks, unit m²) is estimated at 170.00 CHF/m² excl. VAT in the canton of Valais, with a range of 144.50 to 212.50 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 178.95 CHF/m².

Which collective agreement applies to masonry in the canton of Valais?

The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Valais, the wage zone shown is “Blue” and the reference employer charges are 34,9 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 211 masonry prices in the other cantons

See also the CFC 211 prices: Vaud (coefficient 1.00, skilled worker 108.20 CHF/h), Geneva (coefficient 1.12, skilled worker 121.20 CHF/h), Fribourg (coefficient 0.98, skilled worker 106.05 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 104.95 CHF/h), Jura (coefficient 0.94, skilled worker 101.70 CHF/h), Bern (coefficient 1.02, skilled worker 110.35 CHF/h).

Other trades in the canton of Valais

Hub tools and pack for this trade

Price this chapter in Soumission. The 1'349 items of ACIP chapter no. 5, adjusted for the canton, directly in your quotes. Discover Soumission