CFC 224 Waterproofing and insulation prices in the canton of Valais — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Waterproofing, asphalt work and roof insulation” (CFC 224.1) for the canton of Valais. ACIP chapter no. 12 contains 237 entries, of which 177 are priced items in Swiss francs, excluding VAT (HT), spread over 9 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Valais, the regional ACIP coefficient is 0.95 (cantonal modifier −5 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 122.95 CHF/h on a daywork basis and a foreman or team leader 126.05 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker122.95CHF/h
- Foreman / team leader126.05CHF/h
- Helper104.30CHF/h
- Apprenticen/aCHF/h
- Regional ACIP coefficient0.95Valais
Prices of the key items of CFC 224 waterproofing and insulation in the canton of Valais
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.95; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Mastic asphalt ETA-AC-0220 · Supply and hot application on a concrete substrate of a natural asphalt screed poured in a single layer of… | m² | 76.40 | 89.85 | 112.35 | — | |
| Thermal insulation ETA-IS-0100 · Supply and loose laying on the vapour barrier of insulating boards in rigid polyurethane foam of one hundred… | m² | 47.65 | 56.05 | 70.05 | — | |
| Vapour barriers ETA-BV-0090 · Full-coverage application of a layer of hot-poured bitumen over the whole surface of the substrate, for an area… | m² | 7.50 | 8.85 | 11.05 | — | |
| Protection and finishing ETA-PT-0060 · Supply and laying of an anti-puncture geotextile sheet of one hundred and fifty grams per square metre covered with a… | m² | 23.30 | 27.40 | 34.25 | — | |
| Multi-layer roofing ETA-CM-0030 · Supply and execution of a two-layer bituminous waterproofing system, welded or hot-bonded, made up of a first… | m² | 41.05 | 48.30 | 60.40 | — | |
| Single-layer roofing ETA-CO-0020 · Supply and loose laying with welding of the sheets of a single-layer synthetic membrane in polyvinyl chloride… | m² | 41.40 | 48.70 | 60.85 | — | |
| Mastic asphalt ETA-AC-0300 · Supply and hot application on a concrete substrate of a natural asphalt screed poured in a single layer of… | m² | 59.70 | 70.25 | 87.80 | — | |
| Thermal insulation ETA-IS-0070 · Supply and loose laying on the vapour barrier of insulating boards in rigid polyurethane foam of eighty… | m² | 40.40 | 47.55 | 59.45 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 12 (ACIP code shown); the family has 47 entries for the first item. The 177 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Valais)
- Average hourly rate observed (skilled worker)
- 122.95 CHF/h
- Regional ACIP coefficient
- 0.95
- Range of the chapter's rates (from helper to foreman)
- 104.30 to 126.05 CHF/h
- Hub reference agreement
- not linked
- Wage zone of the ACIP reference: Blue.
- Reference employer charges: 34,9 % for structural work, 25,9 % for finishing work and building services; family allowance rate (CAF): 3,55 %.
- This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 12. The applicable collective agreement must be checked with your trade association.
- Locality modifiers of the ACIP reference: Sion/Sierre/Martigny −5 %, Crans-Montana +12 %, Verbier +18 %, Zermatt +25 %.
- The locality with the highest uplift in the canton in the reference is Zermatt (+25 %): the page's cantonal coefficient does not reflect it.
Source: ACIP 2026 workbook no. 12 (Waterproofing asphalt work insulation) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 224.1 (CFC) and 364 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 224 waterproofing and insulation (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: waterproofing and insulation in the canton of Valais
What is the daywork hourly rate for waterproofing and insulation in the canton of Valais?
According to the 2026 ACIP price list, a skilled worker is charged 122.95 CHF/h on a daywork basis in the canton of Valais, a foreman or team leader 126.05 CHF/h and a helper 104.30 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 12 multiplied by the regional coefficient 0.95.
What is the regional ACIP coefficient for Valais?
The ACIP coefficient of Valais is 0.95 (cantonal modifier −5 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Mastic asphalt” cost in the canton of Valais?
The ACIP item ETA-AC-0220 (Mastic asphalt, unit m²) is estimated at 89.85 CHF/m² excl. VAT in the canton of Valais, with a range of 76.40 to 112.35 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 94.60 CHF/m².
Which collective agreement applies to waterproofing and insulation in the canton of Valais?
The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 12; the collective agreement that applies in the canton of Valais must be checked with your trade association.
See also
CFC 224 waterproofing and insulation prices in the other cantons
See also the CFC 224 prices: Vaud (coefficient 1.00, skilled worker 129.40 CHF/h), Geneva (coefficient 1.12, skilled worker 144.95 CHF/h), Fribourg (coefficient 0.98, skilled worker 126.80 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 125.50 CHF/h), Jura (coefficient 0.94, skilled worker 121.65 CHF/h), Bern (coefficient 1.02, skilled worker 132.00 CHF/h).
Other trades in the canton of Valais
- CFC 201 Earthworks
- CFC 211 Reinforced concrete
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.09: 09. Flat Roof Waterproofing
- Downloadable pack: As-Built Documentation (DOE) & Maintenance Log Pack (SIA 469)
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.