Skip to content
Website
ACIP · Art Construction Price Index CFC 287 ACIP chapter no. 28 2026 edition

CFC 287 Site cleaning prices in the canton of Valais — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “End-of-construction cleaning” (CFC 287) for the canton of Valais. ACIP chapter no. 28 contains 119 entries, of which 107 are priced items in Swiss francs, excluding VAT (HT), spread over 12 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Valais, the regional ACIP coefficient is 0.95 (cantonal modifier −5 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 89.20 CHF/h on a daywork basis and a foreman or team leader 89.25 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker89.20CHF/h
  • Foreman / team leader89.25CHF/h
  • Helper66.40CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient0.95Valais

Prices of the key items of CFC 287 site cleaning in the canton of Valais

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.95; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Cleaning of floors NET-NS-0300 · Clinker or raw terracotta tile, sweeping, cleaning with a hard brush and vacuuming m² 4.30 5.05 6.30 —
Cleaning of windows NET-NF-0040 · Insulating or single-glazed window, frames cleaned on all sides, glass cleaned on both sides, metal frame… m² 13.05 15.35 19.20 —
Cleaning of sanitary appliances NET-NA-0080 · Cleaning of sanitary appliance, taps and fittings included, toilet bowl or Turkish-style toilet pc 12.70 14.95 18.70 —
Cleaning of stairs NET-NC-0030 · Tread and riser, skirting boards included, dimension up to one hundred and fifty centimetres, lino or polyvinyl chloride… m² 4.10 4.80 6.00 —
Cleaning of skirting boards NET-NE-0010 · Mineral skirting, natural or reconstituted, rinsing after cleaning ml 2.80 3.30 4.10 —
Cleaning of walls NET-NP-0010 · Textile-covered wall, vacuum cleaning m² 1.80 2.15 2.65 —
Cleaning of heating and ventilation installations NET-NI-0040 · Heating element with valve included, washing and wiping m² 2.60 3.05 3.80 —
Cleaning of built-in elements NET-EE-0020 · Indoor and outdoor cupboards, shelving and side panels included, measured on the front surface… m² 6.30 7.40 9.25 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 28 (ACIP code shown); the family has 42 entries for the first item. The 107 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Valais)

Average hourly rate observed (skilled worker)
89.20 CHF/h
Regional ACIP coefficient
0.95
Range of the chapter's rates (from helper to foreman)
66.40 to 89.25 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Blue.
  • Reference employer charges: 34,9 % for structural work, 25,9 % for finishing work and building services; family allowance rate (CAF): 3,55 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 28. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Sion/Sierre/Martigny −5 %, Crans-Montana +12 %, Verbier +18 %, Zermatt +25 %.
  • The locality with the highest uplift in the canton in the reference is Zermatt (+25 %): the page's cantonal coefficient does not reflect it.

Source: ACIP 2026 workbook no. 28 (Cleaning) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 287 (CFC) and 691 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 287 site cleaning (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: site cleaning in the canton of Valais

What is the daywork hourly rate for site cleaning in the canton of Valais?

According to the 2026 ACIP price list, a skilled worker is charged 89.20 CHF/h on a daywork basis in the canton of Valais, a foreman or team leader 89.25 CHF/h and a helper 66.40 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 28 multiplied by the regional coefficient 0.95.

What is the regional ACIP coefficient for Valais?

The ACIP coefficient of Valais is 0.95 (cantonal modifier −5 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Cleaning of floors” cost in the canton of Valais?

The ACIP item NET-NS-0300 (Cleaning of floors, unit m²) is estimated at 5.05 CHF/m² excl. VAT in the canton of Valais, with a range of 4.30 to 6.30 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 5.30 CHF/m².

Which collective agreement applies to site cleaning in the canton of Valais?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 28; the collective agreement that applies in the canton of Valais must be checked with your trade association.

See also

CFC 287 site cleaning prices in the other cantons

See also the CFC 287 prices: Vaud (coefficient 1.00, skilled worker 93.90 CHF/h), Geneva (coefficient 1.12, skilled worker 105.15 CHF/h), Fribourg (coefficient 0.98, skilled worker 92.00 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 91.10 CHF/h), Jura (coefficient 0.94, skilled worker 88.25 CHF/h), Bern (coefficient 1.02, skilled worker 95.80 CHF/h).

Other trades in the canton of Valais

Hub tools and pack for this trade

Price this chapter in Soumission. The 107 items of ACIP chapter no. 28, adjusted for the canton, directly in your quotes. Discover Soumission