Skip to content
Website
ACIP · Art Construction Price Index CFC 251 ACIP chapter no. 15 2026 edition

CFC 251 Sanitary installations prices in the canton of Fribourg — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Sanitary installations” (CFC 251) for the canton of Fribourg. ACIP chapter no. 15 contains 500 entries, of which 459 are priced items in Swiss francs, excluding VAT (HT), spread over 19 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Fribourg, the regional ACIP coefficient is 0.98 (cantonal modifier −2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 118.15 CHF/h on a daywork basis and a foreman or team leader 135.50 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker118.15CHF/h
  • Foreman / team leader135.50CHF/h
  • Helper106.10CHF/h
  • Apprentice49.35CHF/h
  • Regional ACIP coefficient0.98Fribourg

Prices of the key items of CFC 251 sanitary installations in the canton of Fribourg

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.98; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Taps and fittings SAN-RB-0220 · Chromed garden tap with handwheel and non-return device, diameter one inch pc 278.05 327.10 408.90 —
Washbasins, bidets SAN-LB-0120 · Sheet-metal bathroom cabinet, width sixty-one centimetres, height sixty-eight point five centimetres… pc 454.50 534.70 668.35 —
Insulation of piping SAN-IS-0210 · Shells of raw inorganic material, visible installation with polyvinyl chloride jacket lining, thickness thirty… ml 37.05 43.55 54.45 —
Baths, showers SAN-BD-0140 · Shower rail, length of seventy-five to one hundred and twenty-five centimetres, standard model, ceiling rate pc 312.85 368.05 460.05 —
Toilets, urinals SAN-TU-0020 · Wall-hung porcelain toilet, concealed cistern, control tap, lid with seat and connecting sleeve pc 1'389.95 1'635.25 2'044.05 —
Water points, sinks SAN-PE-0020 · Flushing slop sink in white stoneware, sixty-one by forty-six centimetres, with wall-mounted mixer tap and trap pc 1'301.15 1'530.75 1'913.45 —
Standardised kitchen units SAN-BC-0050 · Block of two and a half units, dimensions one hundred and forty-five point five by sixty centimetres, height ninety… pc 3'431.35 4'036.85 5'046.10 —
Electric water heater SAN-CE-0020 · Electric water heater with a vitrified steel tank, wall-mounted model, capacity two hundred litres pc 2'616.75 3'078.50 3'848.15 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 15 (ACIP code shown); the family has 57 entries for the first item. The 459 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Fribourg)

Average hourly rate observed (skilled worker)
118.15 CHF/h
Regional ACIP coefficient
0.98
Range of the chapter's rates (from helper to foreman)
106.10 to 135.50 CHF/h
Hub reference agreement
building-services agreements (EIT.swiss for electrical work, Suissetec for CVC and plumbing)
  • Wage zone of the ACIP reference: Blue.
  • Reference employer charges: 34 % for structural work, 25 % for finishing work and building services; family allowance rate (CAF): 2,65 %.
  • Hub reference agreement for this trade: building-services agreement for heating, ventilation, air conditioning (CVC) and plumbing (Suissetec). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Fribourg (city) 0 %, Bulle 0 %, Morat 0 %.

Source: ACIP 2026 workbook no. 15 (Sanitary installations) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 251 (CFC) and 551 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 251 sanitary installations (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: sanitary installations in the canton of Fribourg

What is the daywork hourly rate for sanitary installations in the canton of Fribourg?

According to the 2026 ACIP price list, a skilled worker is charged 118.15 CHF/h on a daywork basis in the canton of Fribourg, a foreman or team leader 135.50 CHF/h and a helper 106.10 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 15 multiplied by the regional coefficient 0.98.

What is the regional ACIP coefficient for Fribourg?

The ACIP coefficient of Fribourg is 0.98 (cantonal modifier −2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Taps and fittings” cost in the canton of Fribourg?

The ACIP item SAN-RB-0220 (Taps and fittings, unit pc) is estimated at 327.10 CHF/pc excl. VAT in the canton of Fribourg, with a range of 278.05 to 408.90 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 333.80 CHF/pc.

Which collective agreement applies to sanitary installations in the canton of Fribourg?

The hub's reference links this trade to the building-services agreement for heating, ventilation, air conditioning (CVC) and plumbing (Suissetec). In the canton of Fribourg, the wage zone shown is “Blue” and the reference employer charges are 25 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 251 sanitary installations prices in the other cantons

See also the CFC 251 prices: Vaud (coefficient 1.00, skilled worker 120.55 CHF/h), Geneva (coefficient 1.12, skilled worker 135.00 CHF/h), Valais (coefficient 0.95, skilled worker 114.50 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 116.95 CHF/h), Jura (coefficient 0.94, skilled worker 113.30 CHF/h), Bern (coefficient 1.02, skilled worker 122.95 CHF/h).

Other trades in the canton of Fribourg

Hub tools and pack for this trade

Price this chapter in Soumission. The 459 items of ACIP chapter no. 15, adjusted for the canton, directly in your quotes. Discover Soumission