CFC 211 Reinforced concrete prices in the canton of Fribourg — ACIP price list 2026 & hourly rates
This page presents the 2026 ACIP price list for the chapter “Reinforced concrete, formwork and reinforcement” (CFC 211.4) for the canton of Fribourg. ACIP chapter no. 6 contains 455 entries, of which 423 are priced items in Swiss francs, excluding VAT (HT), spread over 44 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.
For Fribourg, the regional ACIP coefficient is 0.98 (cantonal modifier −2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 97.90 CHF/h on a daywork basis and a foreman or team leader 133.60 CHF/h.
The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.
- Skilled worker97.90CHF/h
- Foreman / team leader133.60CHF/h
- Helper86.55CHF/h
- Apprentice53.45CHF/h
- Regional ACIP coefficient0.98Fribourg
Prices of the key items of CFC 211 reinforced concrete in the canton of Fribourg
Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.98; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.
| ACIP item | Unit | Min. price | ACIP average price | Max. price | Quantity | Amount (average) |
|---|---|---|---|---|---|---|
| Formwork for slabs, beams, girders, parapets BET-CD-0080 · Formwork for horizontal slabs, formwork type three-one, slab thickness less than or equal to thirty-five… | m² | 101.10 | 118.90 | 148.65 | — | |
| Formwork for joints BET-CJ-0120 · Formwork for rebated joints without transverse steel, for foundations, rebate at half the height of the… | m² | 159.50 | 187.65 | 234.60 | — | |
| Concrete for slabs, beams, girders, parapets BET-BD-0030 · Concrete B thirty-five over twenty-five for flat slabs, horizontal or sloping up to three per cent, in a single… | m³ | 287.00 | 337.65 | 422.05 | — | |
| Reinforcing steel with a yield strength of five hundred, normal or high ductility BET-AA-0170 · Reinforcing steel with a yield strength of five hundred, normal or high ductility, simple bending, diameter twenty… | kg | 2.85 | 3.35 | 4.15 | — | |
| Formwork for stairs BET-CS-0010 · Formwork for the soffit of straight stairs, with formwork type one, flight width less than or equal to one hundred… | m² | 146.85 | 172.75 | 215.95 | — | |
| Formwork for shafts and vertical ducts BET-CP-0120 · Vertical formwork for shafts and ducts, internal section greater than two square metres, propping possible, formwork of… | m² | 98.80 | 116.25 | 145.30 | — | |
| Concrete for foundations, raft slabs and channels BET-BF-0040 · Concrete B thirty-five over twenty-five for isolated foundations with an inclined upper face, artificial cement content of… | m³ | 306.45 | 360.55 | 450.70 | — | |
| Formwork for piers BET-CI-0070 · Formwork for piers of constant rectangular section, in formwork type two, height of one hundred and fifty-one to… | m² | 142.20 | 167.30 | 209.10 | — | |
| Estimated total (CHF excl. VAT) | — | — | — | |||
Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 6 (ACIP code shown); the family has 124 entries for the first item. The 423 priced items of the chapter are priced in the Soumission software.
Cantonal specifics (Fribourg)
- Average hourly rate observed (skilled worker)
- 97.90 CHF/h
- Regional ACIP coefficient
- 0.98
- Range of the chapter's rates (from helper to foreman)
- 86.55 to 133.60 CHF/h
- Hub reference agreement
- National Agreement for the Structural Building Trades (CN)
- Wage zone of the ACIP reference: Blue.
- Reference employer charges: 34 % for structural work, 25 % for finishing work and building services; family allowance rate (CAF): 2,65 %.
- Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
- Locality modifiers of the ACIP reference: Fribourg (city) 0 %, Bulle 0 %, Morat 0 %.
- Workbook 6 has no daywork section: rates from workbook 5 (Masonry), foreman, formwork carpenter, labourer, apprentice.
Source: ACIP 2026 workbook no. 6 (Reinforced concrete) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 211.4, 211.5, 211.6 (CFC) and 241, 314 (CAN) are those of the hub's translator, not verified with the CRB.
ACIP PDF sheet for CFC 211 reinforced concrete (free)
Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
Frequently asked questions: reinforced concrete in the canton of Fribourg
What is the daywork hourly rate for reinforced concrete in the canton of Fribourg?
According to the 2026 ACIP price list, a skilled worker is charged 97.90 CHF/h on a daywork basis in the canton of Fribourg, a foreman or team leader 133.60 CHF/h and a helper 86.55 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 6 multiplied by the regional coefficient 0.98.
What is the regional ACIP coefficient for Fribourg?
The ACIP coefficient of Fribourg is 0.98 (cantonal modifier −2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Neuchâtel 0.97, Jura 0.94, Bern 1.02.
How much does the item “Formwork for slabs, beams, girders, parapets” cost in the canton of Fribourg?
The ACIP item BET-CD-0080 (Formwork for slabs, beams, girders, parapets, unit m²) is estimated at 118.90 CHF/m² excl. VAT in the canton of Fribourg, with a range of 101.10 to 148.65 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 121.35 CHF/m².
Which collective agreement applies to reinforced concrete in the canton of Fribourg?
The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Fribourg, the wage zone shown is “Blue” and the reference employer charges are 34 % of gross salary. Always check which agreement actually applies to your company.
See also
CFC 211 reinforced concrete prices in the other cantons
See also the CFC 211 prices: Vaud (coefficient 1.00, skilled worker 99.90 CHF/h), Geneva (coefficient 1.12, skilled worker 111.90 CHF/h), Valais (coefficient 0.95, skilled worker 94.90 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 96.90 CHF/h), Jura (coefficient 0.94, skilled worker 93.90 CHF/h), Bern (coefficient 1.02, skilled worker 101.90 CHF/h).
Other trades in the canton of Fribourg
- CFC 201 Earthworks
- CFC 211 Scaffolding
- CFC 211 Masonry
- CFC 213 Steel structures
- CFC 214 Timber structures
- CFC 221 Windows and joinery
- CFC 222 Sheet-metal work
- CFC 224 Roofing
- CFC 224 Waterproofing and insulation
- CFC 228 Shutters and blinds
- CFC 232 Electrical work
- CFC 242 Heating and ventilation
- CFC 251 Sanitary installations
- CFC 271 Plastering and partitions
- CFC 272 Metalwork
- CFC 281 Tiles and ceramics
- CFC 281 Parquet
- CFC 281 Floor coverings
- CFC 285 Painting
- CFC 287 Site cleaning
Hub tools and pack for this trade
- Tool 6.06: 06. Reinforced Concrete & Masonry
- Downloadable pack: Quote & Bid Template by CFC
- Tool 2.1: real cost of a worker and daywork rate
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
