Skip to content
Website
ACIP · Art Construction Price Index CFC 285 ACIP chapter no. 27 2026 edition

CFC 285 Painting prices in the canton of Fribourg — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Painting, renders and wall coverings” (CFC 285) for the canton of Fribourg. ACIP chapter no. 27 contains 1'149 entries, of which 1'027 are priced items in Swiss francs, excluding VAT (HT), spread over 32 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Fribourg, the regional ACIP coefficient is 0.98 (cantonal modifier −2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 102.95 CHF/h on a daywork basis and a foreman or team leader 111.95 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker102.95CHF/h
  • Foreman / team leader111.95CHF/h
  • Helper89.90CHF/h
  • Apprentice37.30CHF/h
  • Regional ACIP coefficient0.98Fribourg

Prices of the key items of CFC 285 painting in the canton of Fribourg

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.98; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Dispersion paint PNT-PD-0650 · Plaster walls, dispersion in two coats m² 23.05 27.10 33.85 —
Silicone paint PNT-PS-0460 · Concrete walls, opaque silicone paint in two coats, externally m² 24.50 28.80 36.00 —
Matt solvent-based paint PNT-PM-0350 · Rendered wall with a grain of two to three millimetres, one coat of solvent-based paint with matt finish m² 19.35 22.80 28.50 —
Glazes and varnishes PNT-GV-0510 · Wood panelling, nitrocellulose varnish sprayed in two coats m² 34.15 40.20 50.25 —
Mineral paint PNT-PE-0070 · Ceiling in grooved render with a grain of two to three millimetres, mineral base in one pass, externally m² 12.10 14.25 17.80 —
Float-finished renders on walls PNT-CT-0330 · Grooved mineral render applied on plastered walls or fine float-finished plasters, lower coat included, with a grain of three… m² 44.65 52.55 65.65 —
Float-finished renders on ceilings PNT-CR-0220 · Fibrous antique render, texture obtained with a brush on ceiling, lower coat included for three kilograms per… m² 50.45 59.35 74.15 —
Synthetic-resin-based paint, on metal PNT-BR-0420 · Blind guide rails, enamel in two coats ml 18.85 22.15 27.70 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 27 (ACIP code shown); the family has 53 entries for the first item. The 1'027 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Fribourg)

Average hourly rate observed (skilled worker)
102.95 CHF/h
Regional ACIP coefficient
0.98
Range of the chapter's rates (from helper to foreman)
89.90 to 111.95 CHF/h
Hub reference agreement
collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR)
  • Wage zone of the ACIP reference: Blue.
  • Reference employer charges: 34 % for structural work, 25 % for finishing work and building services; family allowance rate (CAF): 2,65 %.
  • Hub reference agreement for this trade: collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Fribourg (city) 0 %, Bulle 0 %, Morat 0 %.

Source: ACIP 2026 workbook no. 27 (Paint) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 285 (CFC) and 675 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 285 painting (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: painting in the canton of Fribourg

What is the daywork hourly rate for painting in the canton of Fribourg?

According to the 2026 ACIP price list, a skilled worker is charged 102.95 CHF/h on a daywork basis in the canton of Fribourg, a foreman or team leader 111.95 CHF/h and a helper 89.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 27 multiplied by the regional coefficient 0.98.

What is the regional ACIP coefficient for Fribourg?

The ACIP coefficient of Fribourg is 0.98 (cantonal modifier −2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Dispersion paint” cost in the canton of Fribourg?

The ACIP item PNT-PD-0650 (Dispersion paint, unit m²) is estimated at 27.10 CHF/m² excl. VAT in the canton of Fribourg, with a range of 23.05 to 33.85 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 27.65 CHF/m².

Which collective agreement applies to painting in the canton of Fribourg?

The hub's reference links this trade to the collective agreement for the finishing trades of French-speaking Switzerland (CCT-SOR). In the canton of Fribourg, the wage zone shown is “Blue” and the reference employer charges are 25 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 285 painting prices in the other cantons

See also the CFC 285 prices: Vaud (coefficient 1.00, skilled worker 105.05 CHF/h), Geneva (coefficient 1.12, skilled worker 117.65 CHF/h), Valais (coefficient 0.95, skilled worker 99.80 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 101.90 CHF/h), Jura (coefficient 0.94, skilled worker 98.75 CHF/h), Bern (coefficient 1.02, skilled worker 107.15 CHF/h).

Other trades in the canton of Fribourg

Hub tools and pack for this trade

Price this chapter in Soumission. The 1'027 items of ACIP chapter no. 27, adjusted for the canton, directly in your quotes. Discover Soumission