Skip to content
Website
ACIP · Art Construction Price Index CFC 211.4 ACIP chapter no. 6 2026 edition

CFC 211 Reinforced concrete prices in the canton of Geneva — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Reinforced concrete, formwork and reinforcement” (CFC 211.4) for the canton of Geneva. ACIP chapter no. 6 contains 455 entries, of which 423 are priced items in Swiss francs, excluding VAT (HT), spread over 44 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Geneva, the regional ACIP coefficient is 1.12 (cantonal modifier +12 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 111.90 CHF/h on a daywork basis and a foreman or team leader 152.70 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker111.90CHF/h
  • Foreman / team leader152.70CHF/h
  • Helper98.90CHF/h
  • Apprentice61.10CHF/h
  • Regional ACIP coefficient1.12Geneva

Prices of the key items of CFC 211 reinforced concrete in the canton of Geneva

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.12; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Formwork for slabs, beams, girders, parapets BET-CD-0080 · Formwork for horizontal slabs, formwork type three-one, slab thickness less than or equal to thirty-five… m² 115.55 135.90 169.90 —
Formwork for joints BET-CJ-0120 · Formwork for rebated joints without transverse steel, for foundations, rebate at half the height of the… m² 182.30 214.50 268.10 —
Concrete for slabs, beams, girders, parapets BET-BD-0030 · Concrete B thirty-five over twenty-five for flat slabs, horizontal or sloping up to three per cent, in a single… m³ 328.00 385.90 482.35 —
Reinforcing steel with a yield strength of five hundred, normal or high ductility BET-AA-0170 · Reinforcing steel with a yield strength of five hundred, normal or high ductility, simple bending, diameter twenty… kg 3.25 3.80 4.75 —
Formwork for stairs BET-CS-0010 · Formwork for the soffit of straight stairs, with formwork type one, flight width less than or equal to one hundred… m² 167.85 197.45 246.80 —
Formwork for shafts and vertical ducts BET-CP-0120 · Vertical formwork for shafts and ducts, internal section greater than two square metres, propping possible, formwork of… m² 112.90 132.85 166.05 —
Concrete for foundations, raft slabs and channels BET-BF-0040 · Concrete B thirty-five over twenty-five for isolated foundations with an inclined upper face, artificial cement content of… m³ 350.25 412.05 515.05 —
Formwork for piers BET-CI-0070 · Formwork for piers of constant rectangular section, in formwork type two, height of one hundred and fifty-one to… m² 162.50 191.20 239.00 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 6 (ACIP code shown); the family has 124 entries for the first item. The 423 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Geneva)

Average hourly rate observed (skilled worker)
111.90 CHF/h
Regional ACIP coefficient
1.12
Range of the chapter's rates (from helper to foreman)
98.90 to 152.70 CHF/h
Hub reference agreement
National Agreement for the Structural Building Trades (CN)
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 35,2 % for structural work, 26,2 % for finishing work and building services; family allowance rate (CAF): 2,85 %.
  • Hub reference agreement for this trade: National Agreement for the Structural Building Trades (CN). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Genève (city) +15 %, Carouge/Lancy +12 %, Cologny +18 %.
  • The locality with the highest uplift in the canton in the reference is Cologny (+18 %): the page's cantonal coefficient does not reflect it.
  • Workbook 6 has no daywork section: rates from workbook 5 (Masonry), foreman, formwork carpenter, labourer, apprentice.

Source: ACIP 2026 workbook no. 6 (Reinforced concrete) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 211.4, 211.5, 211.6 (CFC) and 241, 314 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 211 reinforced concrete (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: reinforced concrete in the canton of Geneva

What is the daywork hourly rate for reinforced concrete in the canton of Geneva?

According to the 2026 ACIP price list, a skilled worker is charged 111.90 CHF/h on a daywork basis in the canton of Geneva, a foreman or team leader 152.70 CHF/h and a helper 98.90 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 6 multiplied by the regional coefficient 1.12.

What is the regional ACIP coefficient for Geneva?

The ACIP coefficient of Geneva is 1.12 (cantonal modifier +12 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94, Bern 1.02.

How much does the item “Formwork for slabs, beams, girders, parapets” cost in the canton of Geneva?

The ACIP item BET-CD-0080 (Formwork for slabs, beams, girders, parapets, unit m²) is estimated at 135.90 CHF/m² excl. VAT in the canton of Geneva, with a range of 115.55 to 169.90 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 121.35 CHF/m².

Which collective agreement applies to reinforced concrete in the canton of Geneva?

The hub's reference links this trade to the National Agreement for the Structural Building Trades (CN). In the canton of Geneva, the wage zone shown is “Red” and the reference employer charges are 35,2 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 211 reinforced concrete prices in the other cantons

See also the CFC 211 prices: Vaud (coefficient 1.00, skilled worker 99.90 CHF/h), Valais (coefficient 0.95, skilled worker 94.90 CHF/h), Fribourg (coefficient 0.98, skilled worker 97.90 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 96.90 CHF/h), Jura (coefficient 0.94, skilled worker 93.90 CHF/h), Bern (coefficient 1.02, skilled worker 101.90 CHF/h).

Other trades in the canton of Geneva

Hub tools and pack for this trade

Price this chapter in Soumission. The 423 items of ACIP chapter no. 6, adjusted for the canton, directly in your quotes. Discover Soumission