Skip to content
Website
ACIP · Art Construction Price Index CFC 224.1 ACIP chapter no. 12 2026 edition

CFC 224 Waterproofing and insulation prices in the canton of Jura — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Waterproofing, asphalt work and roof insulation” (CFC 224.1) for the canton of Jura. ACIP chapter no. 12 contains 237 entries, of which 177 are priced items in Swiss francs, excluding VAT (HT), spread over 9 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Jura, the regional ACIP coefficient is 0.94 (cantonal modifier −6 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 121.65 CHF/h on a daywork basis and a foreman or team leader 124.75 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker121.65CHF/h
  • Foreman / team leader124.75CHF/h
  • Helper103.20CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient0.94Jura

Prices of the key items of CFC 224 waterproofing and insulation in the canton of Jura

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 0.94; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Mastic asphalt ETA-AC-0220 · Supply and hot application on a concrete substrate of a natural asphalt screed poured in a single layer of… m² 75.60 88.90 111.15 —
Thermal insulation ETA-IS-0100 · Supply and loose laying on the vapour barrier of insulating boards in rigid polyurethane foam of one hundred… m² 47.15 55.45 69.35 —
Vapour barriers ETA-BV-0090 · Full-coverage application of a layer of hot-poured bitumen over the whole surface of the substrate, for an area… m² 7.45 8.75 10.95 —
Protection and finishing ETA-PT-0060 · Supply and laying of an anti-puncture geotextile sheet of one hundred and fifty grams per square metre covered with a… m² 23.05 27.10 33.90 —
Multi-layer roofing ETA-CM-0030 · Supply and execution of a two-layer bituminous waterproofing system, welded or hot-bonded, made up of a first… m² 40.65 47.80 59.75 —
Single-layer roofing ETA-CO-0020 · Supply and loose laying with welding of the sheets of a single-layer synthetic membrane in polyvinyl chloride… m² 40.95 48.20 60.20 —
Mastic asphalt ETA-AC-0300 · Supply and hot application on a concrete substrate of a natural asphalt screed poured in a single layer of… m² 59.10 69.50 86.90 —
Thermal insulation ETA-IS-0070 · Supply and loose laying on the vapour barrier of insulating boards in rigid polyurethane foam of eighty… m² 40.00 47.05 58.80 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 12 (ACIP code shown); the family has 47 entries for the first item. The 177 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Jura)

Average hourly rate observed (skilled worker)
121.65 CHF/h
Regional ACIP coefficient
0.94
Range of the chapter's rates (from helper to foreman)
103.20 to 124.75 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Red.
  • Reference employer charges: 34,5 % for structural work, 25,5 % for finishing work and building services; family allowance rate (CAF): 3,1 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 12. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Delémont −5 %, Porrentruy −6 %.

Source: ACIP 2026 workbook no. 12 (Waterproofing asphalt work insulation) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 224.1 (CFC) and 364 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 224 waterproofing and insulation (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: waterproofing and insulation in the canton of Jura

What is the daywork hourly rate for waterproofing and insulation in the canton of Jura?

According to the 2026 ACIP price list, a skilled worker is charged 121.65 CHF/h on a daywork basis in the canton of Jura, a foreman or team leader 124.75 CHF/h and a helper 103.20 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 12 multiplied by the regional coefficient 0.94.

What is the regional ACIP coefficient for Jura?

The ACIP coefficient of Jura is 0.94 (cantonal modifier −6 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Bern 1.02.

How much does the item “Mastic asphalt” cost in the canton of Jura?

The ACIP item ETA-AC-0220 (Mastic asphalt, unit m²) is estimated at 88.90 CHF/m² excl. VAT in the canton of Jura, with a range of 75.60 to 111.15 CHF/m² (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 94.60 CHF/m².

Which collective agreement applies to waterproofing and insulation in the canton of Jura?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 12; the collective agreement that applies in the canton of Jura must be checked with your trade association.

See also

CFC 224 waterproofing and insulation prices in the other cantons

See also the CFC 224 prices: Vaud (coefficient 1.00, skilled worker 129.40 CHF/h), Geneva (coefficient 1.12, skilled worker 144.95 CHF/h), Valais (coefficient 0.95, skilled worker 122.95 CHF/h), Fribourg (coefficient 0.98, skilled worker 126.80 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 125.50 CHF/h), Bern (coefficient 1.02, skilled worker 132.00 CHF/h).

Other trades in the canton of Jura

Hub tools and pack for this trade

Price this chapter in Soumission. The 177 items of ACIP chapter no. 12, adjusted for the canton, directly in your quotes. Discover Soumission