Skip to content
Website
ACIP · Art Construction Price Index CFC 232 / 233 ACIP chapter no. 13 2026 edition

CFC 232 Electrical work prices in the canton of Bern — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Heavy-current electrical installations” (CFC 232 / 233) for the canton of Bern. ACIP chapter no. 13 contains 163 entries, of which 142 are priced items in Swiss francs, excluding VAT (HT), spread over 9 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Bern, the regional ACIP coefficient is 1.02 (cantonal modifier +2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 146.40 CHF/h on a daywork basis and a foreman or team leader 155.50 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker146.40CHF/h
  • Foreman / team leader155.50CHF/h
  • Helper134.30CHF/h
  • Apprentice66.00CHF/h
  • Regional ACIP coefficient1.02Bern

Prices of the key items of CFC 232 electrical work in the canton of Bern

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.02; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Light fittings, luminaires ELE-LL-0120 · Supply and installation of a robust oval porthole with cast-iron body fitted with a metal protective grille for… pc 233.65 274.90 343.60 —
Extension of material in an existing apartment ELE-EM-0090 · Creation of a supply line for a multiple socket block flush-mounted in an existing dwelling… pc 258.90 304.55 380.70 —
Heavy-current installation ELE-IC-0070 · Supply and flush-mounted laying for the interior of a type twelve safety socket outlet incorporating a… pc 327.40 385.20 481.50 —
Electrical switchboards ELE-TE-0070 · Supply, surface-mounted installation and complete wiring of a distribution board for a dwelling of four to five rooms… pc 957.55 1'126.55 1'408.15 —
Installation of small appliances with line ELE-IP-0040 · Installation of the supply line, connection and functional check of an electric cooker, conduit and… pc 448.35 527.50 659.35 —
Rising mains ELE-CM-0080 · Carrying out the floor rising main connecting the metering board to the subscribers' distribution boards for a… ml 111.95 131.75 164.65 —
Apartments ELE-AP-0030 · Complete electrical equipment of a three-room dwelling comprising the sub-distribution board, the supply of the… pc 6'180.25 7'270.85 9'088.60 —
Light fittings, luminaires ELE-LL-0230 · Supply and surface-mounted installation of a bare fluorescent strip light without reflector for a thirty-six-watt tube with… pc 154.40 181.65 227.10 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 13 (ACIP code shown); the family has 54 entries for the first item. The 142 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Bern)

Average hourly rate observed (skilled worker)
146.40 CHF/h
Regional ACIP coefficient
1.02
Range of the chapter's rates (from helper to foreman)
134.30 to 155.50 CHF/h
Hub reference agreement
building-services agreements (EIT.swiss for electrical work, Suissetec for CVC and plumbing)
  • Wage zone of the ACIP reference: Blue (City/JB: Red).
  • Reference employer charges: 33,3 % for structural work, 24,3 % for finishing work and building services; family allowance rate (CAF): 1,9 %.
  • Hub reference agreement for this trade: building-services agreement for electrical work (EIT.swiss). The exact affiliation of your company remains to be checked with your trade association.
  • Locality modifiers of the ACIP reference: Berne (city) +5 %, Bienne 0 %, Interlaken +6 %, Gstaad +20 %.
  • The locality with the highest uplift in the canton in the reference is Gstaad (+20 %): the page's cantonal coefficient does not reflect it.
  • In the hub's reference, the zone of the canton of Bern is given as “Blue (City/JB: Red)”; the price modifier used here is that of the canton (+2 %), with no separate value for the French-speaking part of the canton (Bernese Jura, Jura bernois). Bienne is listed at 0 %.

Source: ACIP 2026 workbook no. 13 (Electrical work) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 232, 233 (CFC) and 511, 521 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 232 electrical work (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: electrical work in the canton of Bern

What is the daywork hourly rate for electrical work in the canton of Bern?

According to the 2026 ACIP price list, a skilled worker is charged 146.40 CHF/h on a daywork basis in the canton of Bern, a foreman or team leader 155.50 CHF/h and a helper 134.30 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 13 multiplied by the regional coefficient 1.02.

What is the regional ACIP coefficient for Bern?

The ACIP coefficient of Bern is 1.02 (cantonal modifier +2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94.

How much does the item “Light fittings, luminaires” cost in the canton of Bern?

The ACIP item ELE-LL-0120 (Light fittings, luminaires, unit pc) is estimated at 274.90 CHF/pc excl. VAT in the canton of Bern, with a range of 233.65 to 343.60 CHF/pc (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 269.50 CHF/pc.

Which collective agreement applies to electrical work in the canton of Bern?

The hub's reference links this trade to the building-services agreement for electrical work (EIT.swiss). In the canton of Bern, the wage zone shown is “Blue (City/JB: Red)” and the reference employer charges are 24,3 % of gross salary. Always check which agreement actually applies to your company.

See also

CFC 232 electrical work prices in the other cantons

See also the CFC 232 prices: Vaud (coefficient 1.00, skilled worker 143.55 CHF/h), Geneva (coefficient 1.12, skilled worker 160.80 CHF/h), Valais (coefficient 0.95, skilled worker 136.35 CHF/h), Fribourg (coefficient 0.98, skilled worker 140.70 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 139.25 CHF/h), Jura (coefficient 0.94, skilled worker 134.95 CHF/h).

Other trades in the canton of Bern

Hub tools and pack for this trade

Price this chapter in Soumission. The 142 items of ACIP chapter no. 13, adjusted for the canton, directly in your quotes. Discover Soumission