Skip to content
Website
ACIP · Art Construction Price Index CFC 213 ACIP chapter no. 7 2026 edition

CFC 213 Steel structures prices in the canton of Bern — ACIP price list 2026 & hourly rates

This page presents the 2026 ACIP price list for the chapter “Steel structures” (CFC 213) for the canton of Bern. ACIP chapter no. 7 contains 353 entries, of which 315 are priced items in Swiss francs, excluding VAT (HT), spread over 16 sections. The eight items below are actual entries from this chapter, chosen from the most heavily priced work families.

For Bern, the regional ACIP coefficient is 1.02 (cantonal modifier +2 % relative to the reference price of the ACIP price list). This coefficient applies to item prices and to daywork rates. A skilled worker is charged 119.65 CHF/h on a daywork basis and a foreman or team leader 132.80 CHF/h.

The minimum and maximum price of each item are the “Low” (−15 %) and “High” (+25 %) ranges applied to the ACIP price adjusted for the canton, as in tools 1.2 and 1.4 of the /outils/ hub. These figures are indicative: they constitute neither an offer nor a contractual price.

  • Skilled worker119.65CHF/h
  • Foreman / team leader132.80CHF/h
  • Helper112.60CHF/h
  • Apprenticen/aCHF/h
  • Regional ACIP coefficient1.02Bern

Prices of the key items of CFC 213 steel structures in the canton of Bern

Unit prices in CHF excluding VAT (HT), adjusted for the canton: the average ACIP price is the price in the 2026 ACIP price list multiplied by 1.02; the minimum and maximum are the “Low” (−15 %) and “High” (+25 %) ranges of the hub. Enter a quantity per item to estimate an amount.

ACIP itemUnit Min. priceACIP average priceMax. price QuantityAmount (average)
Trimmers, trusses and girders CMT-CF-0390 · Straight girders with solid web, built up and welded, of constant height, simple, with end plates… t 2'474.80 2'911.55 3'639.40 —
Plate girders in welded built-up sections CMT-PA-0190 · Castellated beams made of sections assembled by welding or cut or welded into hexagonal cells, without… t 3'312.80 3'897.40 4'871.80 —
Columns and posts CMT-CP-0160 · Bare columns with solid web, built-up and welded, straight lengths of constant or variable section, with plates… t 3'833.15 4'509.55 5'636.95 —
Truss elements CMT-EF-0210 · Solid-web trusses of variable height, built up then welded, continuous with connections made by welds… t 2'887.15 3'396.65 4'245.80 —
Plate girders in rolled sections CMT-PO-0140 · Plate girders in rolled sections with a yield strength of two hundred and thirty-five, continuous between beams… t 1'691.80 1'990.40 2'487.95 —
Roof and floor sheeting CMT-TT-0060 · Laying of profiled sheets for roof and floor, unloading, storage, distribution and laying included, fixing by screws… m² 15.35 18.05 22.55 —
Supports and anchorages CMT-AA-0040 · Plate serving as a support or anchorage intended to be placed in the formwork and without installation, with holes of… pc 145.25 170.90 213.65 —
Stairs, landings, walkways CMT-EP-0050 · Stair tread and riser made of folded sheet of four millimetres thickness, tread dimensions three… pc 119.55 140.65 175.80 —
Estimated total (CHF excl. VAT) ———

Indicative figures: they constitute neither an offer nor a contractual price. Each line is an actual entry from ACIP chapter no. 7 (ACIP code shown); the family has 85 entries for the first item. The 315 priced items of the chapter are priced in the Soumission software.

Cantonal specifics (Bern)

Average hourly rate observed (skilled worker)
119.65 CHF/h
Regional ACIP coefficient
1.02
Range of the chapter's rates (from helper to foreman)
112.60 to 132.80 CHF/h
Hub reference agreement
not linked
  • Wage zone of the ACIP reference: Blue (City/JB: Red).
  • Reference employer charges: 33,3 % for structural work, 24,3 % for finishing work and building services; family allowance rate (CAF): 1,9 %.
  • This trade is not linked by the hub to any of its three agreements (CN, CCT-SOR, EIT.swiss / Suissetec): daywork rates come directly from ACIP chapter no. 7. The applicable collective agreement must be checked with your trade association.
  • Locality modifiers of the ACIP reference: Berne (city) +5 %, Bienne 0 %, Interlaken +6 %, Gstaad +20 %.
  • The locality with the highest uplift in the canton in the reference is Gstaad (+20 %): the page's cantonal coefficient does not reflect it.
  • In the hub's reference, the zone of the canton of Bern is given as “Blue (City/JB: Red)”; the price modifier used here is that of the canton (+2 %), with no separate value for the French-speaking part of the canton (Bernese Jura, Jura bernois). Bienne is listed at 0 %.

Source: ACIP 2026 workbook no. 7 (Steel structures) and the hub's wage reference /outils/ (tools 2.1 and 2.2). The codes 213, 272 (CFC) and 321, 632 (CAN) are those of the hub's translator, not verified with the CRB.

ACIP PDF sheet for CFC 213 steel structures (free)

Daywork rates by qualification and by French-speaking canton, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.

Frequently asked questions: steel structures in the canton of Bern

What is the daywork hourly rate for steel structures in the canton of Bern?

According to the 2026 ACIP price list, a skilled worker is charged 119.65 CHF/h on a daywork basis in the canton of Bern, a foreman or team leader 132.80 CHF/h and a helper 112.60 CHF/h (excl. VAT). These rates are those of ACIP chapter no. 7 multiplied by the regional coefficient 1.02.

What is the regional ACIP coefficient for Bern?

The ACIP coefficient of Bern is 1.02 (cantonal modifier +2 %). It is read from the hub's wage reference and applied to prices and daywork rates. For comparison: Vaud 1.00, Geneva 1.12, Valais 0.95, Fribourg 0.98, Neuchâtel 0.97, Jura 0.94.

How much does the item “Trimmers, trusses and girders” cost in the canton of Bern?

The ACIP item CMT-CF-0390 (Trimmers, trusses and girders, unit t) is estimated at 2'911.55 CHF/t excl. VAT in the canton of Bern, with a range of 2'474.80 to 3'639.40 CHF/t (−15 % / +25 %). The reference price in the ACIP price list (modifier 0 %) is 2'854.45 CHF/t.

Which collective agreement applies to steel structures in the canton of Bern?

The hub does not link this trade to any of its three reference agreements (CN, CCT-SOR, EIT.swiss / Suissetec). The daywork rates on this page come directly from ACIP chapter no. 7; the collective agreement that applies in the canton of Bern must be checked with your trade association.

See also

CFC 213 steel structures prices in the other cantons

See also the CFC 213 prices: Vaud (coefficient 1.00, skilled worker 117.30 CHF/h), Geneva (coefficient 1.12, skilled worker 131.40 CHF/h), Valais (coefficient 0.95, skilled worker 111.45 CHF/h), Fribourg (coefficient 0.98, skilled worker 114.95 CHF/h), Neuchâtel (coefficient 0.97, skilled worker 113.80 CHF/h), Jura (coefficient 0.94, skilled worker 110.25 CHF/h).

Other trades in the canton of Bern

Hub tools and pack for this trade

Price this chapter in Soumission. The 315 items of ACIP chapter no. 7, adjusted for the canton, directly in your quotes. Discover Soumission